Search
  • Search


Ireland: Tenders/Electricity Supply Board ( ESB )/TR3129 Wexford Hub EPC
  1. Supplier selection

    Dec 17, 2025 12:00 AMDecember 17, 2025 12:00 AM
  2. Contract signed

    Dec 19, 2025 12:00 AMDecember 19, 2025 12:00 AM
  3. Result notice published

    May 27, 10:57 AMMay 27, 2026 10:57 AM

Brief

TR3129 Wexford Hub EPC

Awarded

The competition has ended and a winner has been selected.

Qualification deadline
May 26,Expired
Award
Quality 40%
Procedure
With negotiationTwo stages
Agreement
Construction work
Estimated value
€0

Brief

Electricity Supply Board (ESB) has entered into an agreement with Voltalia Ireland Limited for engineering and construction works in Wexford, Ireland. The contract was awarded based on price (60%) and quality (40%), and four bids were received.

Anleggs- og infrastrukturbygging

Result

TED
  • Voltalia Ireland Limited
    Winner
  • Number of bids
    4
  • Contract value
    €0

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    TR3129 Wexford Hub EPC

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    TR3129 Wexford Hub EPC

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Electricity Supply Board ( ESB )

From the notice

  • TR3129 Wexford Hub EPC

  • Contact

    esprocurement@esb.ie
  • Type
    Result · Prequalification
  • Location
    Dublin
  • Main code
    Engineering works and construction works
    45220000

Similar active competitions

  • Electricity Supply Board ( ESB )

    Elektroinstallasjon i bygninger

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Qualification system
    May 30, 2027(100+ days)
  • Electricity Supply Board ( ESB )

    Elektrisitet og energiforvaltning

    Commissioning and Engineering-related Services Qualification System

    Commissioning and Engineering-related Services Qualification System

    Qualification system
    Jun 4, 2027(100+ days)
  • Electricity Supply Board

    Rådgivende ingeniørtjenester for bygg og anlegg

    Offshore Wind Resource and Metocean Measurement Campaign in Ireland and the UK

    Electricity Supply Board (ESB) needs services for an Offshore Wind Resource and Metocean Measurement Campaign in Ireland and the UK. The project location is Dublin.

    Qualification system
    Oct 27, 2028(100+ days)