Search

  • Search


    TR4196 ESB Poolbeg Heat Recovery Steam Generator Stack (HRSG) Works.

    Electricity Supply Board ( ESB )

    TR4196 ESB Poolbeg Heat Recovery Steam Generator Stack (HRSG) Works.

    1. Competition notice published

      Aug 7, 7:30 AMAugust 7, 2025 7:30 AM
    2. Tender submission deadline

      Aug 7, 9:30 AMAugust 7, 2025 9:30 AM

    Brief

    Ireland: Tenders/Electricity Supply Board ( ESB )/TR4196 ESB Poolbeg Heat Recovery Steam Generator Stack (HRSG) Works.
    Brief

    Reparasjon og vedlikehold

    Electricity Supply Board (ESB) needs works for the TR4196 ESB Poolbeg Heat Recovery Steam Generator Stack (HRSG) in Dublin. The project involves either a complete turnkey contract to replace two HRSG Stacks, including removal of existing stacks, full design of replacements, site installation, and commissioning of new mechanical rain dampers, or, at ESB's discretion, a contract to remove outer cladding and insulation and apply preservation paint coating to the exposed metal surface of both HRSG stacks (from 26.4m to 75.0m above ground).

    About the bid

      Option 1- a complete turnkey contract to replace two (2) in number HRSG Stacks including but not limited to: • Safe removal of the existing stacks to grade, inclusive of any works to facilitate this. • Full design of the proposed replacement stacks. • Site installation work to install the new stack • Installation and commissioning of a new mechanical rain damper within each stack The Contractor should provide a complete turnkey solution to the above; OR Option 2- alternatively at its discretion, the Contracting entity may choose to separately procure a contract to remove the outer cladding and insulation from two (2) in number HRSG Stacks and then to apply a preservation paint coating to the exposed metal surface of both HRSG stacks, (extending from building roof level 26.4m above ground to top of stack level 75.0m).

      Contact phone
      01 6765831
      Contact email
      mary.carroll@esb.ie
      Address
      27 Fitzwilliam Street Lower, Dublin, D02 KT92 Dublin

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Electricity Supply Board ( ESB )
    Title
    TR4196 ESB Poolbeg Heat Recovery Steam Generator Stack (HRSG) Works.
    Type
    CompetitionPrequalification
    Main code
    45259000Repair and maintenance of plant
    Supplemental codes
    42163000Steam generators42164000Auxiliary plant for use with boilers42165000Steam condensers
    Location
    Dublin

    Active similar competitions

    • Electricity Supply Board

      Industrimaskiner

      TR5844 - Poolbeg CCGT Auxilliary Boiler Major Replacement

      Electricity Supply Board needs boiler installations for a major replacement of its dual fuel auxiliary steam boiler, controls, and external gas skid at Poolbeg CCGT in Dublin. The project, with a duration of 12 months, involves the removal of existing plant and equipment, installation of new designed equipment, and potential modifications to building structure and civil works foundations. The design will require interfacing with electrical, gas, diesel, C and I, fire, civil, structural, ventilation, steam, and feedwater systems.

      Competition with qualificationOct 6, 2026
      Oct 9, 2026(0 days)
      €0
    • Electricity Supply Board

      TR1675- QSQ for The Supply and Installation of Open Cycle Gas Turbine Packages within the Island of Ireland

      TR1675- QSQ for The Supply and Installation of Open Cycle Gas Turbine Packages within the Island of Ireland

      Qualification systemMay 16, 2024
      Jun 13, 2027(100+ days)
    • Electricity Supply Board

      Riving og miljøsanering

      TR5553 - Demolition and associated works at ESB Sites on the island of Ireland

      Electricity Supply Board (ESB) needs demolition, deconstruction, enabling works, and associated works at ESB Sites on the island of Ireland. This is a qualification system for future procurements.

      Qualification systemSep 10, 2026
      Oct 8, 2029(100+ days)
    • Electricity Supply Board ( ESB )

      Miljørådgivning og klimatiltak

      TR4407 - Planning, Consenting and Environmental Services Qualification System

      Electricity Supply Board (ESB) needs planning, consenting, and environmental services for both onshore and offshore projects. The services are related to environmental impact analysis, excluding construction work, and will be delivered in Dublin. This is a qualification system, meaning suppliers will qualify for future smaller procurements.

      Qualification systemOct 16, 2025
      Nov 13, 2028(100+ days)
    • Electricity Supply Board ( ESB )

      Elektroinstallasjon i bygninger

      Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

      Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

      Qualification systemMay 2, 2024
      May 30, 2027(100+ days)