Search
  • Search


Ireland: Tenders/Electricity Supply Board ( ESB )/TR4356 Design, Manufacture, Delivery, Installation and Commissioning of Replacement Excitation System and Associated Electrical Studies at ESB, Aghada Gen. Station.
  1. Competition notice published

    Oct 13, 2025 10:03 AMOctober 13, 2025 10:03 AM
  2. Questions deadline

    Nov 3, 2025 11:00 PMNovember 3, 2025 11:00 PM
  3. Express interest deadline

    Nov 17, 2025 11:00 AMNovember 17, 2025 11:00 AM
  4. Qualification deadline

    Not stated
  5. Tender submission deadline

    Comes with the invitation

Brief

TR4356 Design, Manufacture, Delivery, Installation and Commissioning of Replacement Excitation System and Associated Electrical Studies at ESB, Aghada Gen. Station.

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Nov 17, 2025Expired
Procedure
With negotiationTwo stages
Agreement
Buying services
Estimated value
€0over 1 year

Brief

Electricity Supply Board (ESB) needs services for the design, manufacture, delivery, installation, and commissioning of a replacement Excitation System and associated electrical studies for their CCGT (F-class) at Aghada Gen. Station, located in Dublin. The contract duration is 12 months. The project involves replacing the Excitation System, including the Automatic Voltage Regulator (AVR), Power System Stabiliser (PSS), and Power Part, to ensure generator output stability and Grid Code compliance. The scope includes electrical studies (RoCoF, FRT, PSS calculation, Reactive Capability), dismantling of the existing system, integration of new equipment, Grid Code Testing support, supply of spares, and after-sales support.

Elektrisk infrastruktur og veibelysning

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Electricity Supply Board ( ESB )

From the notice

  • The Contracting Entity intends to procure a design, construct, install and commission contract for the replacement of the Excitation System at ESB’s CCGT (F-class) and associated electrical studies. The Excitation System, which includes Automatic Voltage Regulator (AVR),Power System Stabiliser (PSS) and Power Part will work together with the Turbine Controller to ensure the generator’s output remains stable and compliant with Grid Code. It is proposed that the Contract will include (non-exhaustive list – high level scope): · Design, construct, deliver, install and commission replacement AVR/Excitation System, including PSS · Electrical Studies, including Rate of Change of Frequency (RoCoF), Fault Ride Through (FRT), Power System Stabiliser (PSS) calculation and Reactive Capability. · Dismantle and Removal of existing AVR/Excitation System and make ready for disposal. · Ensure complete integration of the new equipment into the existing plant. · Grid Code Testing support. · Supply of spares, and after sales support.

  • Contact

    orla.orourke@esb.ie
  • Type
    Competition · Prequalification
  • Location
    Dublin
  • Main code
    Installation services of electricity distribution and control equipment
    51112000
  • 71314100Electrical services71320000Engineering design services

Similar active competitions

  • Electricity Supply Board ( ESB )

    CON1140 Qualification System for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes

    ESB proposes to establish a qualification system under a negotiated procedure for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes. It is envisaged that a significant number of DSO and TSO GIS Substations will be constructed during the period 2026 - 2035 and will be delivered via this procurement process as outlined in Section A Information Memorandum, attached to this publication. Substations procured under this Qualification System will include for a full end to end scope of delivery which may include in some cases site acquisition and achievement of planning permission on behalf of the Contracting Entity. The scope of substation projects under this Qualification System may include a requirement for the inclusion of additional technologies including but not limited to STATCOMS and series compensators. The First Procurement under the Qualification System is envisaged to be: • Framework for PR6 Capacity at scale EPC delivery of 110 kV and/or 110 kV to /38 kV/MV Substations and Substation Programmes. Economic Operators who wish to participate in this qualification system process should submit a response as set out in the Section A Information Memorandum document. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 27th June 2025 (the “First Procurement Closing Date”).

    Qualification system
    Jun 16, 2028(100+ days)
  • Electricity Supply Board ( ESB )

    Reparasjon og vedlikehold

    TR3942 - Supply and Maintenance of EV Supply Equipment and Associated BESS Integrations throughout the Republic of Ireland

    Electricity Supply Board (ESB) needs services for the supply and maintenance of EV supply equipment and associated BESS integrations throughout the Republic of Ireland.

    Qualification system
    Feb 9, 2029(100+ days)
  • Electricity Supply Board ( ESB )

    Elektrisk infrastruktur og veibelysning

    CON1199 - Qualification System for Electrical Distribution Substation Works

    Electricity Supply Board (ESB) needs expressions of interest for a Qualification System for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance, and construction services related to electrical power distribution assets, mainly within substations but also power distribution cables, ring main units, mini-pillars, and other associated assets throughout the distribution network, up to 110 kV voltage level. The works will be located in the Republic of Ireland.

    Qualification system
    Jul 2, 2029(100+ days)