Find

  • All tenders

Search results

  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Rådgivende ingeniørtjenester for bygg og anlegg

    Supplementary notice to notice 485884-2022 Tender for Bird Monitoring System BAL02

    Elektrownia Wiatrowa Baltica - 2 SP. Z o.o. needs services for a Bird Monitoring System for an offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW. The tender is expected to launch in December 2026 via the Achilles UNCE qualification system, using product codes 3.2.7 and 2.2.12. To participate, suppliers must be registered under both codes in Achilles UNCE, which involves completing an order form, paying an annual qualification fee (approximately EUR 200 to EUR 1000), and completing an online questionnaire.

    Qualification systemOct 5, 2026
    Nov 2, 2029(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Lufttransport og ubemannede luftfartøy

    MEDEVAC Helicopter services

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. zawarła umowę z Northen Helicopter GmbH na świadczenie usług helikopterowych MEDEVAC podczas budowy morskiej farmy wiatrowej BAL02. Usługi będą świadczone w regionie Vorpommern-Rügen, a wartość umowy wynosi 2 008 816 EUR.

    ResultAug 24, 2026€2,008,816
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Geotekniske undersøkelser

    Baltica-2 Survey Support Services

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. zawarła umowę ze Spectrum Geosurvey Limited na świadczenie usług wsparcia batymetrycznego z wykorzystaniem echosondy wielowiązkowej (MBES) oraz innych usług wsparcia pomiarowego na pokładzie platformy badawczej (tj. statku do transportu załóg (CTV) dostarczonego przez Zamawiającego). Usługi będą świadczone w Gdańsku przez 10 miesięcy, a wartość umowy wynosi 1 152 596 EUR.

    ResultAug 10, 2026
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    BAL02 Walk to Work Accommodation Vessel (Award Lot 2)

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. has entered into an agreement with Bernhard Schulte GmbH & Co. KG and Global Meridian Holding Ltd. for the delivery of Walk to Work Accommodation Vessel services for an offshore wind project in the Baltic Sea, located in Miasto Warszawa. The contract is for the rental of water transport vehicles with crew.

    ResultAug 4, 2026
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Supplementary notice to notice 2022/S 171­485785 + Fuel Supply GEN

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. needs fuel oil for the operations phase of an offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW. The tender for Fuel Supply to the Generation phase is expected to launch no earlier than September 2026. To qualify, suppliers must be enrolled and qualified in Achilles UNCE, which involves completing an order form, paying an annual qualification fee (approximately EUR 200 to EUR 1000), and completing an online questionnaire about their company.

    Qualification systemAug 3, 2026
    Aug 31, 2029(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Baltica02 Offshore Windfarm Construction CTVs

    Elektrownia Wiatrowa Baltica -2 Sp. z o.o. zawarła umowę z Njord Offshore Ltd na świadczenie usług transportowych (Crew Transfer Vessels) dla morskiej farmy wiatrowej Baltica 2, o wartości 1 335 600 EUR.

    ResultJun 17, 2026
    Jun 16, 2026(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Baltica02 Offshore Windfarm Construction CTVs

    Elektrownia Wiatrowa Baltica -2 Sp. z o.o. zawarła umowę z Njord Offshore Ltd na świadczenie usług transportowych (Crew Transfer Vessels) dla morskiej farmy wiatrowej Baltica 2, o wartości 2 193 050 EUR.

    ResultJun 17, 2026
    Jun 16, 2026(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Baltica02 Offshore Windfarm Construction CTVs

    Elektrownia Wiatrowa Baltica -2 Sp. z o.o. zawarła umowę z Njord Offshore Ltd na świadczenie usług transportowych, konkretnie na dostawę statków do transferu załóg (CTVs) dla morskiej farmy wiatrowej Baltica 2. Wartość umowy wynosi 2 499 600 EUR.

    ResultJun 17, 2026
    Jun 16, 2026(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Lufttransport og ubemannede luftfartøy

    Supplementary notice to notice 2022/S 171-485884 (Services) Construction Phase crew change helicopter

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o needs helicopter services for crew changes during the construction phase of an offshore wind project in the Baltic Sea with a potential capacity of up to 1.5 GW. The tender is expected to launch in February-March 2026. To qualify, suppliers must enroll in the Achilles UNCE qualification system by completing an order form, paying an annual qualification fee (approximately EUR 200 to EUR 1000), and completing an online questionnaire about their company.

    Qualification systemJun 10, 2026
    Jul 8, 2029(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    BAL02 Walk to Work Accommodation Vessel (Award Lot 1)

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. has entered into an agreement with Pelagic Wind Services Ltd for the delivery of Walk to Work Accommodation Vessel services for an offshore wind project in the Baltic Sea. The contract is for the rental of water transport vehicles with crew.

    ResultMay 4, 2026
    May 3, 2026(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Baltica 2 Offshore Wind Farm Construction phase Supply Runs Vessel

    Elektrownia Wiatrowa Baltica 2 SP Z O.O. potrzebuje usług statku do dostaw na farmę wiatrową Baltica 2 Offshore Wind Farm przez 283 dni. Usługa obejmuje transfer ładunków między portem, farmami wiatrowymi i statkami offshore oraz pełnienie całodobowych obowiązków statku strażniczego. Oferty będą oceniane na podstawie ceny (50%), rozwiązania technicznego (40%) oraz aspektów BHP (10%).

    Competition with qualificationApr 22, 2026
    May 21, 2026(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Baltica02 Offshore Windfarm Construction CTVs

    Elektrownia Wiatrowa Baltica -2 Sp. z o.o. zawarła umowę z MHO Operations ApS na świadczenie usług transportowych, konkretnie na dostawę statków do transferu załóg (CTVs) dla morskiej farmy wiatrowej Baltica 2. Wartość umowy wynosi 2 240 000 EUR.

    ResultApr 14, 2026
    Apr 13, 2026(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Contract award notice for BAL02 Offshore Wind Farm Jack-Up Accommodation Unit

    ELEKTROWNIA WIATROWA BALTICA – 2 SP. Z O.O. zawarła umowę z Novastar Energy Holdings Limited na dostawę jednostki typu Jack-up do zakwaterowania i zapewnienia bezpiecznego dostępu do jednostek morskich oraz usług dźwigowych dla uruchomienia morskiej farmy wiatrowej Baltica 02 OSS. Usługi będą świadczone w Polsce przez 14 miesięcy.

    ResultFeb 19, 2026
    Feb 18, 2026(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Lufttransport og ubemannede luftfartøy

    Supplementary notice to notice 2022/S 171-485785 + BAL02 MEDEVAC 2026-27

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. needs fuel supply services for the construction phase of an offshore wind project in the Baltic Sea, with a total potential capacity of up to 1.5 GW. The tender, expected to launch in February 2026, will be conducted via the Achilles UNCE qualification system, using product codes 1.11.18.7 Gas Oil and 1.11.18.4 Diesel. To qualify, suppliers must enroll in Achilles UNCE, complete an online questionnaire, and satisfy basic commercial requirements, potentially including customer-specific questions.

    Qualification systemFeb 5, 2026
    Mar 5, 2029(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Supplementary notice to notice 2022/S 171-485785 + Fuel Supply CON 2026-2028

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. needs fuel supply, specifically Gas Oil and Diesel, for the construction phase of an offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW. The tender is expected to launch in February 2026 via the Achilles UNCE qualification system. To qualify, suppliers must enroll in Achilles UNCE, complete an online questionnaire, and satisfy basic commercial requirements.

    Qualification systemJan 9, 2026
    Feb 6, 2029(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Fergetransport

    Contract for SS Transport

    Contract for Transport of Secondary Structures for Baltica 02

    ResultDec 1, 2025
    Nov 30, 2025(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Baltica 2 Offshore Wind Farm Construction phase Guard Vessel

    The contract regards guard vessel service regarding Baltica 02 Offshore Wind Farm Project and its crew shall be capable of completing the following activities relevant for the operation, includ-ing but not limited to: • continuously monitor the offshore wind farm site for the presence of any vessels not involved in the construction or operation of the project • to protect subsea assets from damage caused by fishing, anchor damage, or other ma-rine activities • take on the responsibility to provide safety and standby services, often assisting with rescue operations and evacuation

    Competition with qualificationOct 29, 2025
    Nov 26, 2025(Expired)
    €2,000,000
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Supplementary notice to notice 2022/S 171-485785 Fuel_CON&GEN_BAL02_2026-30_FA

    Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. needs diesel fuel (EN 590) for an offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW. Suppliers must be enrolled and qualified in Achilles UNCE, which involves completing an order form, paying an annual qualification fee (approximately EUR 200 to EUR 1000), and completing an online questionnaire covering detailed company information and basic commercial requirements.

    Qualification systemSep 18, 2025
    Oct 16, 2028(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Sikkerhets- og helsetjenester

    BAL02 Offshore Security System

    The Offshore Security System should be seen as a complete system/environment/eco-system of Sensors (A-Sensors and B-Sensors) and the Security Management Software (hereinafter: ”SMS”). The Sensors are divided into two types; A-Sensors which the awarded tenderer delivers and B-Sensors which is third-party Sensors which the awarded tenderer needs to perform integrations to, to get signals/data into the SMS. The Contracting Entity is looking for the following functionality: The ability to manage physical security of the BAL02 assets, including inter-array cables, wind turbine generators, high voltage export cables, onshore substation and operations and maintenance base. The system functionality shall be achieved through the application of a SMS and a number of sensors (A-sensors in this scope).The scope specified below and in particular the A-sensors listed, is based on the Contracting Entity’s envisaged design of the Offshore Security System. Please note that the scope of this Tender Procedure derives from regulation issued by the Polish Ministry of Defence. The regulation stipulates requirements for features and capabilities of an offshore wind farm but does not e.g., regulate how such features and capabilities must be achieved. As such the scope of this Tender Procedure might change based on new or specified legal requirements. The envisaged scope comprises of the following equipment envisaged to be installed primarily on each of the BAL02 offshore substations: 1) drone detection and surveillance system including radars, 2) electro-optical infra-red cameras (hereinafter: ”EO/IR cameras”), 3) radio frequency direction finders (hereinafter: ”RFDR”) and 4) CCTV. Further the scope comprises of SMS implementation as well as integration of the SMS with, aforementioned equipment and third-party equipment into one coherent Offshore Security System. The scope includes:  Delivery, Installation supervision, implementation, and integration of A-Sensors: Drone radar 4 (1 on each OSS) RFDR 4 (1 on each OSS) EO/IR camera 5 (1 on each OSS + one for surveillance Surveillance radar 1 CCTV 32 (8 on each OSS)  Installation, implementation, development, and integration to Employer’s it-environment of the SMS.  Integration to B-Sensors.  Commissioning of the entire Offshore Security System and configuration of the system,  Comprehensive project management to implement the above.  Consultancy services to give advice on further needs of Sensors, supporting subsequent tenders, and continuous development of the SMS in regard to new functionalities, change of Sensors etc. The overall purpose of implementing an Offshore Security System is to prevent, detect and document any abnormal or malicious activity in BAL02 offshore windfarm and limited areas onshore.

    ResultAug 14, 2025
    Aug 13, 2025(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Dekk og biltilbehør

    Supplementary notice to notice 2022/S 171-485884 (Services), Port Agent, Temporary Storage and associated services for Baltica 2 project

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485884 (Services). This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Port Agent, Temporary Storage and associated services for Baltica 2 project. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in August – October 2025 using product codes: ‘2.8.6 Transportation Services’ and ‘2.8.7 Storage & Warehousing Services’.

    Qualification systemJul 14, 2025
    Aug 11, 2028(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    BAL02 - Manufacture and Supply of Foundation Secondary Structures

    BAL02 - Manufacture and Supply of Foundation Secondary Structures Lot 1 - Manufacture and Supply of External Concrete Platform Lot 2 - Manufacture and Supply of Supported Internal Platform Lot 3 - Manufacture and Supply of Anode Cage and Boat Landing

    ResultJul 1, 2025
    Jun 30, 2025(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Geotekniske undersøkelser

    Supplementary notice to notice 2022/S 171-485884 (Services) - Survey Support Service

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485884. This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Survey Support Service. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in August 2025 using product codes 4.6.18.2-Hydrographic Surveys and 4.6.18.14-Seabed Surveys.

    Qualification systemJul 1, 2025
    Jul 29, 2028(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Stillas og stillastjenester

    Supplementary notice to notice 2022/S 171-485697 (Works) - Notice regarding Offshore Scaffolding

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. (2022/S 171-485697 (Works)). This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Offshore Scaffolding. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in May-June 2025 using product code 4.9.20 - Overhead Line Services - Scaffolding.

    Qualification systemMay 1, 2025
    May 29, 2028(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Maritime utstyr og fartøy

    Supplementary notice to notice 2022/S 171-485785 - Demarcation buoys

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. (2022/S 171-485785). This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Demarcation buoys. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in April 2025 using product code 3.54.10 Buoys.

    Qualification systemApr 25, 2025
    May 23, 2028(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Fergetransport

    2022/S 171-485884 - Baltica 2 - Secondary Structures Transport tender

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 485884-2022. This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to [1.5 GW] where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Baltica 2 - Secondary Structures Transport tender. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in March-April 2025 using Ahcilles UNCE category 2.8.6 (Transportation Services).

    Qualification systemNov 20, 2024
    Dec 18, 2027(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Supplementary notice to notice 2022/S 171-485884 (Services) Construction (EPC) Phase Crew Transfer Vessels (CTV) for Baltica 2 Project, Poland

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485884. This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Construction (EPC) Phase Crew Transfer Vessels (CTV) for Baltica 2 Project, Poland. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in December 2024 using product code 2-8-6 Transportations Services.

    Qualification systemNov 11, 2024
    Dec 9, 2027(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Supplementary notice to notice 2022/S 171-485884 (Services) for Walk to Work Accommodation Vessel.

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485884. This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Walk to Work Accommodation Vessel. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in no earlier than week 47 commencing with 18. November 2024 using product code 2-8-6 (Transportation Services).

    Qualification systemSep 27, 2024
    Oct 25, 2027(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Supplementary notice to notice 2022/S 171-485884 (Service) for Jack-Up Accommodation Unit

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485884. This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for a Jack-Up Accommodation Unit. Ørsted Wind Power A/S will use the UNCE qualification system in no earlier than week 43 commencing with 21. October 2024 using product code 2-8-6 (Transportation Services).

    Qualification systemSep 19, 2024
    Oct 17, 2027(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Hav- og kystfiske med utleie av båter

    Supplementary notice to notice 2022/S 171-485884 (Services) Operation & Maintenance Crew Transfer Vessels (CTV) for Baltica 2 Project, Poland.

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485884. This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Operation & Maintenance Crew Transfer Vessels (CTV) for Baltica 2 Project, Poland, Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in August 2024 using product code 2-8-6 Transportations Services.

    Qualification systemJul 3, 2024
    Jul 31, 2027(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    Supplementary notice to notice 2022/S 171-485697 (Works)– Tender for Manufacture and Supply of Foundation Secondary Structures Reference number: 2022/S 171-485697 (Works)

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485697 (Works). This notice is published on a voluntary basis in order to increase transparency and knowledge about Ørsted Entity' purchases in EU tender procedures.This notice relates to the contracting entity project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the Contracting Entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for the Manufacture and Supply of Foundation Secondary Structures. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system no earlier than 21 of June 2024 using product code 4.4.23.

    Qualification systemMay 22, 2024
    Jun 19, 2027(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    Supplementary notice to notice 2022/S 171-485697 (Works) Boulder Relocation at the WTG and OSS Locations

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485697. This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Boulder Relocation at the WTG and OSS Locations. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system during week 14-15 2024 using product code 4.1.18 Demolition & Clearance Work.

    Qualification systemMar 21, 2024
    Apr 18, 2027(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Tender for Supply of Cable Protection Systems

    Design, manufacturing and delivery of 220 monopile CPS for array cables and 10 monopile CPS for export cables.

    ResultMar 15, 2024
    Mar 14, 2024(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Rørlegger- og sanitærarbeid

    Supplementary notice to notice 2022/S 171-485697 (Works) – Tender for Landfall Horizontal Directional Drilling (HDD) and associated works

    The Contract is for Landfall Horizontal Directional Drill (HDD) and associated works for Baltica 2 project. The scope consists of all activities necessary to complete the construction of 4 x HDD for Baltica 2. Comprising of a single HDPE duct for each HDD. It is envisaged that the HDPE Ducts will be 1150m each of 900mm HDPE SDR11. The HDPE Ducts will facilitate the subsequent installation of export cables between the Offshore Wind Farm and the onshore grid network. The cable installation scope is undertaken under a separate contract. The landfall site is located within the Village of Lubiatowo, on the northern coast of the Pomerania Voivodeship, approximately 20km East of Łeba and 50km North-West of Gdynia. Pre-Commencement Activities will take place at the Site, which will be available for the Contractor from Q1 2025. The expected installation year is 2025.

    ResultMar 11, 2024
    Mar 10, 2024(Expired)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Anleggsmaskiner og utstyr

    Supplementary notice to notice 2022/S 171-485785 (Supplies) Tender for supply and service of davit cranes

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485785 (Supplies). This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for supply and service of davit cranes. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in April/May 2024 using product code 1.9.37 and 4.4.24.

    Qualification systemFeb 29, 2024
    Mar 28, 2027(100+ days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Sikkerhets- og helsetjenester

    Supplementary notice to notice 2022/S 171-485785 (Supplies) Offshore Security System

    This notice supplements previously published notice from Elektrownia Wiatrowa Baltica – 2 SP. Z o.o. 2022/S 171-485785 (Supplies). This notice is published on a voluntary basis in order to increase transparency and knowledge about the contracting entity’s purchases in EU tender procedures. This notice relates to the contracting entity’s project for the development, construction and operation of one offshore wind project in the Baltic Sea with a total potential capacity of up to 1.5 GW where Ørsted Wind Power A/S is representing the contracting entity in the entire tender procedure (‘Entity represented by Ørsted Wind Power A/S’), specifically to the tender for Offshore Security System. Ørsted Wind Power A/S will use the UNCE qualification system for procurement and expects to launch the tender via said qualification system in March - April 2024 using product code 1.4.29 and 1.7.1

    Qualification systemFeb 2, 2024
    Mar 2, 2027(99 days)
  • Elektrownia Wiatrowa Baltica - 2 SP. Z o.o.

    Anleggs- og infrastrukturbygging

    Tender for Manufacturing and Supply of Monopiles

    This notice relates to previously published notice 2021/S 228-601488. This notice is regarding the contracting entity´s project for the development, construction and operation of a offshore wind project called Baltica 2 in the Baltic Sea where Ørsted Wind Power A/S is representing the Contracting Entity in the entire tender procedure, specifically to the tender for Manufacture and Supply of Monopiles for Baltica 2 - Lot 2B.

    ResultJan 2, 2024
    Jan 1, 2024(Expired)