    145 kV GIS substations for Ølstykke (ØLS)

    Energinet Eltransmission A/S

    145 kV GIS substations for Ølstykke (ØLS)

    1. Contract start date

      Aug 10, 12:00 AMAugust 10, 2026 12:00 AM
    2. Contract signed

      Aug 10, 12:00 AMAugust 10, 2026 12:00 AM
    3. Result notice published

      Aug 11, 11:36 AMAugust 11, 2026 11:36 AM
    4. Contract end date

      Jan 15, 2029 12:00 AMJanuary 15, 2029 12:00 AM

    Brief

    Denmark: Tenders/Energinet Eltransmission A/S/145 kV GIS substations for Ølstykke (ØLS)

    Awarded

    The competition has ended and a winner has been selected.

    Award
    Price 30% and 2 more
    Procedure
    With negotiationTwo stages
    Agreement
    Buying goodsuntil Jan 2029

    Brief

    Energinet Eltransmission A/S har indgået en aftale med Hitachi Energy Denmark A/S om levering af et 3-faset, 145 kV, 50 Hz, gasisoleret koblingsanlæg (GIS) med dobbelt samleskinne til Ølstykke (ØLS) transformerstation i Nordsjælland, til en værdi af 4.084.300 €. Leverancen omfatter 2 linjefeltudtag, 2 transformerudtag, 1 samleskinnekoblingsfelt og 2 målerfelter, som skal installeres i en ny bygning og være klar til drift. Der blev lagt vægt på teknisk løsning, sundhed, sikkerhed og miljø i leveringen samt cybersikkerhed.

    Result

    TED
    • Hitachi Energy Denmark A/S
      Winner
    • Number of bids
      2
    • Contract value
      €4,084,300

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Award Criteria

    • Description

      For the evaluation of the sub-criteria the following should be enclosed: A technical solution description which in detail describes the proposed solution (including de-sign, components, processes, tools to be used etc.) and demonstrates how and to which degree the competitive specifications as set out in: Technical Specifications – Substation 145 kV GIS – Gas Insulated Switchgear doc. no 23/039591-1 and Data list – 145 kV GIS for substation ØLS doc. no 23/03591-2, are fulfilled. The tenderer should be thorough and precise when describing the technical solution, as any insecurities and discrepancies may affect the evaluation. Further, please note that the elements marked in yellow in: Technical Specifications – Substation 145 kV GIS – Gas Insulated Switchgear doc. no 23/03591-1 are mandatory, cf. section 3.7.1 of the present Tender Conditions, and therefore are not included in the evaluation. The evaluation will be based on the submitted technical solution description in relation to scope and complexity of the tendered assignment cf. Technical Specifications – Substation 145 kV GIS – Gas Insulated Switchgear doc. no 23/03591-1, Data list – 145 kV GIS for sub-station ØLS doc. no 23/03591-2. It will be evaluated positively to what extent the tenderer’s proposed solution is relevant detailed, project specific, ensures a high level of performance, sustainability, demonstrates a high level of ability to identify relevant activities and challenges and proposes appropriate and project specific methods, tools and processes for managing such. In this context, the elements listed below are of particular importance: • Maintenance (cf. section 4.3 Maintenance, Data list – 145 kV GIS for substation ØLS doc. no 23/03591-2) will be evaluated positive if tenderer can document low maintenance costs combined with short outage time and extended time between maintenance intervals. Furthermore, a solution that gives the Contracting Authority easy access, overview and operation during daily operation will be evaluated positively. • Project specific description which provides information and procedure for; the Factory Acceptance Test (cf. section 7.2 Testing), Site Acceptance Test (cf. section 7.2 Testing), Technical data (Data list – 145 kV GIS for substation ØLS doc. no 23/03591-2) and documentation according to section 9.1 Documentation in Technical Specifications – Substation 145 kV GIS – Gas Insulated Switchgear doc. no 23/03591-1 provided with the tender, especially concerning: o General arrangement drawing o Single line diagram o Gas schematic diagram o List of special tools or fixtures required for installation, testing, maintaining and operating the equipment o Environmental guide for handling and decommissioning of Gas Insulated Switchgear media o Estimated time schedule for engineering, installation and commissioning cf. “Time and Payment schedule” doc. no. 23/03591-10. A minimum score of 4 must be achieved, cf. sub-section 3.7.1. An overall evaluation will be made of the sub-criteria Technical solution.

      Evaluation Method

      The evaluation will be based on the submitted technical solution description in relation to scope and complexity of the tendered assignment cf. Technical Specifications – Substation 145 kV GIS – Gas Insulated Switchgear doc. no 23/03591-1, Data list – 145 kV GIS for sub-station ØLS doc. no 23/03591-2. It will be evaluated positively to what extent the tenderer’s proposed solution is relevant detailed, project specific, ensures a high level of performance, sustainability, demonstrates a high level of ability to identify relevant activities and challenges and proposes appropriate and project specific methods, tools and processes for managing such. In this context, the elements listed below are of particular importance:

      • Maintenance (cf. section 4.3 Maintenance, Data list – 145 kV GIS for substation ØLS doc. no 23/03591-2) will be evaluated positive if tenderer can document low maintenance costs combined with short outage time and extended time between maintenance intervals. Furthermore, a solution that gives the Contracting Authority easy access, overview and operation during daily operation will be evaluated positively.
      • Project specific description which provides information and procedure for; the Factory Acceptance Test (cf. section 7.2 Testing), Site Acceptance Test (cf. section 7.2 Testing), Technical data (Data list – 145 kV GIS for substation ØLS doc. no 23/03591-2) and documentation according to section 9.1 Documentation in Technical Specifications – Substation 145 kV GIS – Gas Insulated Switchgear doc. no 23/03591-1 provided with the tender, especially concerning:
        • General arrangement drawing
        • Single line diagram
        • Gas schematic diagram
        • List of special tools or fixtures required for installation, testing, maintaining and operating the equipment
        • Environmental guide for handling and decommissioning of Gas Insulated Switchgear media
        • Estimated time schedule for engineering, installation and commissioning cf. “Time and Payment schedule” doc. no. 23/03591-10.
          A minimum score of 4 must be achieved, cf. sub-section 3.7.1.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Prices must be stated in the attached Price List and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List cell G14. Recommended spare parts and voluntary options will not be part of the evaluation.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The tenderer should include a detailed HSE-setup and RAMS (Risk Assessment and Method Statements) specifically for the tendered assignment, including detailed descriptions of risk management, on-site supervision, inspections and audits, HSE-accident and incident case handling, assuring a proactive HSE-culture. It is expected that the HSE setup and RAMS will include: • Risk assessments for the scope of work. • Identification of the top 5 (five) HSE-risks and mitigation actions • Method statements • Organization on site to ensure efficient supervision • Description of planned inspections and audits • HSE-accident and incident case handling including identification, mitigation, and investigation • Interface management regarding HSE tasks • Description of accessibility to inspection and maintenance equipment necessary during operation Activities to ensure a proactive HSE-culture on the construction site An overall evaluation will be made of this sub-criterion.

      Evaluation Method

      The Contracting Authority will evaluate the proposed “Health, Safety and Environment in Delivery” based on the submitted HSE-set-up. It will be evaluated positively that the tenderer submits a proactive and detailed HSE-setup and RAMS for this specific assignment which - considering the complexity and scope - especially concerning:

      • How risk assessments for the scope of work (health and safety) are conducted to ensure that risks are eliminated rather than mitigated
      • Identification of the top 5 (five) HSE-risks for the scope of work and the mitigating actions.
      • Method statements which are relevant, safe to work by and show knowledge of the scope of work, especially considering working at heights, heavy loads and installation works.
      • How organization on site is structured to ensure efficient supervision.
      • How inspections and audits are planned considering the complexity and scope of the assignment.
      • How HSE-accident and incident case handling are conducted considering the complexity and scope of the assignment, including identification, mitigation and investigation.
      • Interface management towards subcontractors (if any) Management of competencies, including statutory training and foreign contractor’s management of recognition of qualification/training
      • How easily displays and dials regarding operational inspections and maintenance are reached without use of ladders and platforms
      • How contractor will work with implementing a proactive HSE-culture on the construction site

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For the evaluation of the sub-criteria the below should be enclosed: A solution description which in detail describes the proposed solution and demonstrates how and to which degree the specifications set out in: • Cyber security documentation requirements for components at Energinet stations doc. no 23/03591-26 are fulfilled. • Cyber security functional requirements for components at Energinet stations doc. no 23/03591-27 The Tenderer must in addition fill out “Template - Cyber security requirements for components at Energinet stations” doc. No. 23/03591-30. The tenderer should be thorough and precise when describing the solution, as any insecurities and discrepancies may affect the evaluation. Any deviations regarding Cyber security should be listed in the Clarification List in the spreadsheet marked “Cyber security” (doc. no. 23/03591-17). If the tenderer is offering a cloud-based solution the tenderer should include any deviations to the attached documents: • Functional Cyber security requirements for SaaS - Cloud based services doc. no 23/03591-28 • Non-functional Cyber security requirements for SaaS - Cloud based services doc. no 23/03591-29 Any deviations regarding (cloud-based) Cyber security should be listed in the Clarification List in the spreadsheet marked “Cyber security” (doc. no. 23/03591-17). The proposed deviations to the Cyber Security requirements in doc. no 23/03591-27, doc. no 23/03591-28 (only for cloud-based solutions) and doc. no 22/02125-29 (only for cloud-based solutions) should be explained in detail especially considering to which degree the solution fulfils the specifications and explanation as to why the deviation is made. Further, please note that the elements marked in yellow in: Functional Cyber security requirements for SaaS - Cloud based services doc. no 23/03591-28 are mandatory, cf. section 2.7.1 of the present Tender Conditions, and therefore are not included in the evaluation. An overall evaluation will be made of the sub-criteria Cyber Security.

      Evaluation Method

      The evaluation will be based on the submitted Cyber Security solution description in relation to scope and complexity and the extent to which the tenderer describes a project specific Cyber Security solution in accordance with the Contracting Authority’s specifications, cf. Cyber security documentation requirements for components at Energinet stations doc. No. 23/03591-26. Further the evaluation will be based on the extent to which the tenderer’s submitted solution complies with the Contracting Authority’s specifications:

      • Cyber security functional requirements for components at Energinet stations doc. no 23/03591-27
        Cloud based services:
      • Functional Cyber security requirements for SaaS - Cloud based services doc. no 23/03591-28 (only for cloud-based solutions)
      • Non-functional Cyber security requirements for SaaS - Cloud based services doc. no 23/03591-29 (only for cloud-based solutions)
        All deviations will be included in the evaluation of the sub-criterion "Cyber Security”, and it is noted that any deviations may lead to a reduction to the score depending on the content, clarity, and consequence. A minimum score of 4 must be achieved, cf. sub-section 2.7.1.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet Eltransmission A/S

    From the notice

    • The Contracting Authority wants to purchase one 3 phase, 145 kV, 50 Hz, gas-insulated switchgear (GIS) Alternative gas, double busbar for substation Ølstykke (ØLS) and delivered on Energinet’s site, ready for operation. The GIS Switchgear will be installed in a new building - The supply consists of 2 line-feeder bays, 2 (two) transformer bays, 1 bus bar coupler bays, and 2 (two) metering bays.

    • Contact

      Procurement - Bprocurement@energinet.dk
    • Type
      Result · Prequalification
    • Location
      Nordsjælland
    • Main code
      Electrical machinery, apparatus, equipment and consumables; lighting
      31000000
    • 31682540Substation equipment45232221Transformer substation45315700Switching station installation work

    Similar active competitions

    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification system
      Dec 16, 2028(100+ days)
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(4 days)
      €30,442,953
    • ATP

      IT- drift og vedlikehold

      Udbud af ATP's it-kapacitet

      ATP har brug for it-kapacitet til understøttelse af ATP's horisontale sourcingmodel, hvor it-driften af forretningskritiske applikationer og støttesystemer samles i et hybrid it-miljø. Kontrakten har en maksimal totalværdi på 550 millioner DKK og en varighed på 10 år. Ydelserne omfatter indledende ydelser (1:1 Transition Ind), løbende ydelser (datacenterdrift, infrastrukturdrift, netværksdrift, applikationsdrift og support), bestillingsydelser (standardbestillingsydelser, konsulentydelser og optioner, herunder etablering af Private Cloud og Public Cloud-løsninger), samt tilknyttede tværgående ydelser og transition ud. Leveringsstedet er Nordsjælland. Tildelingskriterierne vægtes som følger: Pris (25%), Transition (40%) og Løbende Ydelser og Transformation (35%). Der kræves en samlet årlig omsætning på mindst 275 millioner DKK i hvert af de seneste tre regnskabsår og en egenkapital på mindst 10 millioner DKK i hvert af de seneste tre regnskabsår. Ansøgere skal desuden dokumentere fem relevante referencer fra de seneste fem år, der viser erfaring med de udbudte hovedydelser.

      Competition with qualification
      Nov 16, 2026(18 days)
      DKK 550,000,000