Ireland: Tenders/Electricity Supply Board ( ESB )/D20/CON/1060 Belcamp Substation Building and Civil Works
  1. Competition notice published

    Nov 12, 2024 4:08 PMNovember 12, 2024 4:08 PM
  2. Contract signed

    Jun 26, 12:00 AMJune 26, 2026 12:00 AM
  3. Result notice published

    Aug 26, 8:59 AMAugust 26, 2026 8:59 AM

Brief

D20/CON/1060 Belcamp Substation Building and Civil Works

Awarded

The competition has ended and a winner has been selected.

Procedure
With negotiationTwo stages
Agreement
Construction work
Estimated value
€11.2M

Brief

Electricity Supply Board (ESB) has entered into an agreement with Elliott Building and Civil Engineering Limited for the construction of new electricity transmission infrastructure at the existing Belcamp 220 kV substation in Dublin. The works are expected to be constructed over a period of 12-14 months, with a final contract value of 11,175,000 EUR. Six bids were received for this contract.

Result

TED
  • Elliott Building and Civil Engineering Limited
    Winner
  • Number of tenders received
    6
  • Contract value
    €11,175,000

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    See tender documents

    Source

    No source found in the documents. Check the weight against the tender documents.

  • Description

    See tender documents

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Electricity Supply Board ( ESB )

From the notice

  • The Contracting Entity intends to procure an Employer designed works Contractor for the construction of new electricity transmission infrastructure at the existing Belcamp 220 kV substation. It is envisaged that the scope of works to be procured under this Prequalification Questionnaire (PQQ) will be as outlined in section A.1.1 of the attached document. Economic Operators who wish to participate in this Prequalification Questionnaire process should submit a response as set out in section A.3 of the attached document. At the date of issuing this PQQ it is envisaged that the works will be constructed over a circa. 12–14 month period.

  • Contact

    Gerard Nevillenetworkscontractorprocurement@esb.ie
  • Type
    Result · Prequalification
  • Location
    Dublin
  • Main code
    Substation construction work
    45232220
  • 45000000Construction work

Similar active competitions

  • Electricity Supply Board ( ESB )

    Elektroinstallasjon i bygninger

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Qualification system
    May 30, 2027(100+ days)
  • Electricity Supply Board ( ESB )

    Elektrisk infrastruktur og veibelysning

    CON1199 - Qualification System for Electrical Distribution Substation Works

    Electricity Supply Board (ESB) needs expressions of interest for a Qualification System for the subsequent procurement of engineering, civil, design, equipment and material supply, operation, maintenance, and construction services related to electrical power distribution assets, mainly within substations but also power distribution cables, ring main units, mini-pillars, and other associated assets throughout the distribution network, up to 110 kV voltage level. The works will be located in the Republic of Ireland.

    Qualification system
    Jul 2, 2029(100+ days)
  • Electricity Supply Board ( ESB )

    CON1140 Qualification System for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes

    ESB proposes to establish a qualification system under a negotiated procedure for the at scale EPC delivery of 110 kV, 220 kV and 400 kV HV Substations and Substation Programmes. It is envisaged that a significant number of DSO and TSO GIS Substations will be constructed during the period 2026 - 2035 and will be delivered via this procurement process as outlined in Section A Information Memorandum, attached to this publication. Substations procured under this Qualification System will include for a full end to end scope of delivery which may include in some cases site acquisition and achievement of planning permission on behalf of the Contracting Entity. The scope of substation projects under this Qualification System may include a requirement for the inclusion of additional technologies including but not limited to STATCOMS and series compensators. The First Procurement under the Qualification System is envisaged to be: • Framework for PR6 Capacity at scale EPC delivery of 110 kV and/or 110 kV to /38 kV/MV Substations and Substation Programmes. Economic Operators who wish to participate in this qualification system process should submit a response as set out in the Section A Information Memorandum document. While applications may be made to join the Qualification System at any time, those interested in being considered for the Initial Framework (the “First Procurement”) under this Qualification System should submit a completed QSQ response on or before 1200 hrs (local time) on Friday 27th June 2025 (the “First Procurement Closing Date”).

    Qualification system
    Jun 16, 2028(100+ days)