Search

  • Search


    EU-tender regarding Battery Energy Storage System (BESS) for Verdo Produktion 2026

    Verdo Holding A/S

    EU-tender regarding Battery Energy Storage System (BESS) for Verdo Produktion 2026

    1. Competition notice published

      4. mars kl. 11:554. mars 2026 kl. 11:55
    2. Questions deadline

      23. mars kl. 23:0023. mars 2026 kl. 23:00
    3. Qualification deadline

      7. april kl. 08:007. april 2026 kl. 08:00
    4. Invitation to submit tender

      10. mai kl. 22:0010. mai 2026 kl. 22:00

    Brief

    Denmark: Tenders/Verdo Holding A/S/EU-tender regarding Battery Energy Storage System (BESS) for Verdo Produktion 2026

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Brief

    Batterisystemer og energilagring

    Verdo har brug for levering af et batterienergilagringssystem (BESS) med en brugbar kapacitet på cirka 5 MW / 20 MWh til en maksimal totalværdi på 25 millioner DKK. Systemet skal installeres på Verdo Produktion A/S's kraftværk i Randers (Kulholmsvej 12, 8930 Randers NØ, Danmark). Formålet er at levere pålidelig backup-strøm til kritiske anlægsaktiver, muliggøre deltagelse i elmarkeder og netstøttetjenester (FCR, aFRR og mFRR) i det synkrone netområde (DK1) samt udføre energihandel for at optimere omkostninger og indtægter. Udbuddet gennemføres som en udbud med forhandling, hvor 4 ansøgere prækvalificeres. Tildelingskriterierne er teknisk løsning (40%), tidsplan (20%), projektorganisation (10%) og pris (30%). Kvalifikationskrav til projektorganisationen inkluderer kompetencer inden for projektledelse, teknisk ingeniørarbejde og SCADA, samt at leverandøren har serviceudbyder internt og er certificeret med ISO 9001, ISO 14001, ISO 45001 og ISO 27001.

    About the bid

      With this tender, the Contracting Authority wishes to obtain bids for delivery of Battery Energy Storage System (BESS) to Verdo Produktion A/S. The BESS is to be installed within the perimeters of the Power Plant Verdo Produktion A/S, located in Randers (Kulholmsvej 12, 8930 Randers NØ, Denmark). The BESS will be as close as possible to 5 MW / 20 MWh usable capacity. The purpose of the BESS is to provide reliable backup power to critical plant assets in case of emergency or grid disturbances, thereby improving security of supply and reducing the risk of unplanned outages. In addition, the BESS is expected to enable participation in various electricity markets and grid support services (FCR, aFRR and mFRR) in the synchronous grid area (DK1) as well as performing energy arbitrage in response to price signals to optimize energy costs and revenues. Further description of use cases for the BESS can be found in Annex 1 – Technical Specification.Main features of the procedureThe tender is conducted as a negotiated procedure according to a tender notice published in the Official Journal of the EU. This means that all interested bidders can submit an application to participate in the tender. The tender is conducted in accordance with Directive 2014/25 of 26 February 2014 (the Utilities Directive). The contracting authority will pre-qualify 4 applicants who are invited to submit a bid. A contract will be signed with one bidder. The contracting authority is responsible for ensuring that the tender is conducted in accordance with the Utilities Directive, including observing the fundamental principles of transparency, equal treatment, and proportionality during the tender process. It is the bidder's risk to submit a bid in accordance with the tender material, and the bidder must expect that the contracting authority may be compelled to disregard an otherwise attractive bid if it does not meet the established requirements. The contracting authority uses the electronic tendering system, Mercell Ethics (hereafter "the tendering system"), to conduct the tender.

      Contact name
      Karina Winther Jensen
      Contact phone
      41748976
      Contact email
      kawj@verdo.com
      Address
      Agerskellet 7, 8920 Randers NV

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      The technical solution will be evaluated based on the parameters listed below. The tenderer must describe these in detail in Annex 1B – Technical Documentation. The weighting of the parameters is shown in the overview below. In order to achieve a high score, the tender should, as far as possible, meet all requirements and provide comprehensive documentation. Fulfillment of use cases A description showing a clear pathway of getting the solution to ensure back-up supply (use case 1) is scored positive. A solution which has been proven in other setups/projects is scored positively. • Solutions which fulfill use case 1, use case 2 and use case 3 are getting the highest score. • Solutions which only fulfill use case 1 and either use case 2 or 3 get a medium score. • Solutions which only fulfill use case 1 get a lower medium score. • Solutions which only fulfill use case 2 and 3 get a lower score. • Solutions which only fulfill either use case 2 or 3 get the lowest score. • Solutions which partly fulfill use 2 are scored lower than those able to deliver all services. Experience with compliance with grid connection requirements Solutions where the inverter are on the positive list or the system has been approved for grid connection in Denmark in earlier projects will get a higher score. Systems where the documentation of compliance with grid connection requirements in other European countries will get a medium score. Systems which cannot show any technical grid connection compliance will get a lower score. Product quality Tests documenting the product quality, like full load tests of power conversion system, will be scored positively. Product scalability and modulization ensuring opportunities for future expansion and to the extent where risks of down-time are minimized and service opportunities are best are scored positively. Thorough design to ensure mechanical integrity of the solution is scored positively. Product safety Tests, risks assessments, and descriptions documenting a high level of product safety will be scored higher. Fulfillment of relevant safety standards will be scored positively. In evaluation of product safety, the emphasis will be on: • Fire safety prevention measures • Fire monitoring • Fire mitigation measures and minimization of fire spreading • Electrical short circuit protection and risk minimization • Safety measures to protect personnel working around and on the system • Functional safety e.g. through a high quality BMS Levelized cost of storage Levelized cost of storage will be calculated based on parameters stated by the supplier. Parameters included will be roundtrip efficiency, system lifetime, operational/maintenance costs and investment costs[LA2.1][JR2.2]. A low and realistic LCOS will be scored positively.

      Evaluation Method

      Fulfillment of use cases: A description showing a clear pathway of getting the solution to ensure back-up supply (use case 1) is scored positive. A solution which has been proven in other setups/projects is scored positively. * Solutions which fulfill use case 1, use case 2 and use case 3 are getting the highest score. * Solutions which only fulfill use case 1 and either use case 2 or 3 get a medium score. * Solutions which only fulfill use case 1 get a lower medium score. * Solutions which only fulfill use case 2 and 3 get a lower score. * Solutions which only fulfill either use case 2 or 3 get the lowest score. * Solutions which partly fulfill use 2 are scored lower than those able to deliver all services. Experience with compliance with grid connection requirements: Solutions where the inverter are on the positive list or the system has been approved for grid connection in Denmark in earlier projects will get a higher score. Systems where the documentation of compliance with grid connection requirements in other European countries will get a medium score. Systems which cannot show any technical grid connection compliance will get a lower score. Product quality: Tests documenting the product quality, like full load tests of power conversion system, will be scored positively. Product scalability and modulization ensuring opportunities for future expansion and to the extent where risks of down-time are minimized and service opportunities are best are scored positively. Thorough design to ensure mechanical integrity of the solution is scored positively. Product safety: Tests, risks assessments, and descriptions documenting a high level of product safety will be scored higher. Fulfillment of relevant safety standards will be scored positively. In evaluation of product safety, the emphasis will be on: * Fire safety prevention measures * Fire monitoring * Fire mitigation measures and minimization of fire spreading * Electrical short circuit protection and risk minimization * Safety measures to protect personnel working around and on the system * Functional safety e.g. through a high quality BMS Levelized cost of storage: Levelized cost of storage will be calculated based on parameters stated by the supplier. Parameters included will be roundtrip efficiency, system lifetime, operational/maintenance costs and investment costs. A low and realistic LCOS will be scored positively.

    • Description

      It is important for the Contracting Authority that the bidder, in their bid, presents a process for realizing the tendered task that ensures the task is delivered on time and of high quality. Therefore the Contracting Authority will emphasize that the bid includes a robust and reliable time schedule, cf. Annex 1. The bidder must include a Co-ordination Time Schedule (excel or Gantt) in their bid, which shall as minimum contain milestones as listed below and to best extent reflect the timeline as in Annex 1A – Main Time Schedule.

      Evaluation Method

      In assessing the "Timeline," emphasis will be placed on the following, which will be weighed equally positively: * The timeline provided by the bidder contains at least all the listed milestones * Timeline is robust and reliable * Handover of the BESS to Verdo is as close to (or earlier) requested hand-over in Annex 1A – Main Time Schedule.

    • Description

      It is important for the Contracting Authority that the bidder, presents an overview of the project organization of the BESS project on role level – CVs for personnel is not required. The requested competencies may be provided either through the bidder’s internal resources or by external parties engaged by the bidder.

      Evaluation Method

      In assessing the project organization emphasis will be placed on the following, which will be weighed equally positively: * The bidder provides competencies with project management * The bidder provides competencies with technical engineering * The bidder provides competencies with SCADA * The bidder has service provider in-house in the organization * The bidder certified with following certifications: ISO 9001, ISO 14001, ISO 45001, ISO 27001

    • Description

      All prices must be stated in Euro (EUR) or Danish Kroner (DKK), excluding VAT and including possible discounts. All prices must be fixed and all-inclusive prices (including packing, freight, taxes, insurance, installation, commissioning, test operation and training.) When evaluating prices stated in Danish Kroner (DKK) it will be converted into Euro (EUR) according to an exchange rate of DKK/EUR 7.45. The evaluation of the sub-criteria “Price” is based on the total tender sum comprising the following price elements: • The total price for the basic scope of supply according to the Bid list • The total price for the options according to the Bid list (corrected sum, according to description below) • The total price for optional spare parts specified in Annex 1D (according to description below) Basic scope of supply The total price stated in the Bid list, based on the basic scope of supply, specified in the Technical Specifications. The evaluated price for the basic scope of supply parts will be evaluated 100%. Options The prices for options will be based on the scope specified in the Technical Specifications The evaluated price for the options parts will be evaluated 100%. Optional spare parts The total price for optional spare parts according to Annex 1C. The evaluated price for the optional spare parts will be evaluated 100%. The total Price used for evaluation is the sum of the above-mentioned deliveries.

      Evaluation Method

      The lowest price for “total price” will receive the highest score (10) on a scale from 0–10. The other tenderers will receive points relative to the best price. The other tenders will be scored based on the relative difference to the highest score, where the tender with a price that is 60% higher (or more) will receive 0 points.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Verdo Holding A/S
    Title
    EU-tender regarding Battery Energy Storage System (BESS) for Verdo Produktion 2026
    Type
    CompetitionPrequalification
    Main code
    31000000Electrical machinery, apparatus, equipment and consumables; lighting
    Supplemental codes
    31155000Inverters31440000Batteries
    Location
    Østjylland
    Estimated value
    DKK 25,000,000.00

    Active similar competitions

    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification system18. nov. 2025
      16. des. 2028(100+ days)
    • Energistyrelsen

      Elektrisk utstyr og belysning

      North Sea I, South, Offshore Wind Farm

      Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

      Competition20. nov. 2025
      23. okt. 2028(100+ days)
      DKK 6,600,000,000
    • METROSELSKABET I/S

      Jernbane- og infrastrukturbygging

      Copenhagen - New Metroline, M5 Civil Works South

      Metroselskabet I/S needs civil works for the M5 Metroline South package in Copenhagen, Denmark, over a period of 9 years. This design & build contract, under ABT18 terms, involves the construction of approximately 6.5 km of twin bored TBM tunnels, 5 underground stations, 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approximately 2.0 km of viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation, and short embankment sections. The M5 line is a fully automated driverless metro system designed to enhance passenger service and extend connectivity to emerging urban development areas. The contract will be awarded based on Price (50%) and Quality (50%), with Quality sub-criteria including Technical solution and planning (16%), Management and collaboration (16%), Organization and key personnel (10%), and Carbon (8%). To qualify, applicants must have completed one project demonstrating experience with design, construction, and project management of an underground metro project in the EEA and/or the UK, and one project demonstrating experience with design, construction, and project management of an above-ground metro project in the EEA and/or the UK, both within the last 15 years. Additionally, applicants must have an equity of no less than EUR 100,000,000.00 and a total annual turnover of at least EUR 1,700,000,000.00 in each of the last three completed financial years.

      Competition with qualification10. sep. 2026
      13. okt. 2026(4 days)
    • Miljøstyrelsen

      Forskning og miljøovervåking

      Genudbud - Projekter vedrørende sameksistens mellem havvind og havnatur

      Miljøstyrelsen søger tjenesteydelser til projekter vedrørende sameksistens mellem havvind og havnatur, med en økonomisk ramme på op til 15 millioner DKK. Der kan tildeles kontrakter til op til tre projekter, hvor hvert projekt maksimalt kan modtage 7,5 millioner DKK ekskl. moms. Projekterne skal bidrage med videnskabeligt funderet empirisk viden om, hvordan havvindaktiviteter påvirker havmiljøet, herunder identifikation af væsentlige påvirkninger, positive/negative effekter, geografisk udbredelse og effekten af afværgetiltag. Projektet forventes afsluttet senest den 30. november 2030. Tildelingskriterierne vægtes som følger: Opgaveforståelse (10%), Opgaveløsning (50%), Erfaring og kompetencer (30%) og Pris (10%). Kvalifikationskrav inkluderer dokumenteret erfaring med marine økosystemer og empirisk feltarbejde på havet, samt projektledelsesmæssig robusthed fra tilsvarende projekter, dokumenteret via CV'er (maks. 2 sider pr. person) for nøglepersoner.

      Competition15. sep. 2026
      19. okt. 2026(10 days)
      DKK 15,000,000
    • Guldborgsund Kommune

      Rådgivende ingeniørtjenester for bygg og anlegg

      Udbud af totalrådgiverkontrakt vedrørende Eskilstrup Børne- og Skolefællesskab

      Guldborgsund Kommune søger totalrådgivertjenester til Eskilstrup Børne- og Skolefællesskab, med en maksimal totalværdi på 3,5 millioner DKK. Opgaven omfatter arkitekt-, konstruktions-, ingeniør- og inspektionstjenester i Københavns omegn, Vest- og Sydsjælland. Tilbud evalueres på pris (50%), løsningsforslag samt beskrivelse (25%) og procesbeskrivelse (25%). Kvalifikationskrav inkluderer positiv egenkapital de seneste tre regnskabsår og mindst én reference for totalrådgivning på projekter af lignende størrelse inden for nybyggede/tilbyggede dagtilbud/institutionsbyggerier udført i hovedentreprise, som skal omfatte arkitekt-, ingeniør-, landskabsarkitekt- og indretningsrådgivning samt Svanemærkning. Referencer skal være leveret og afsluttet inden for de seneste 5 år.

      Competition with qualification22. sep. 2026
      19. okt. 2026(10 days)
      DKK 3,500,000