Search

  • Search


    EU tender with negotiation regarding Steam Turbine major overhaul 2026

    Verdo Holding A/S

    EU tender with negotiation regarding Steam Turbine major overhaul 2026

    1. Competition notice published

      Sep 3, 8:07 AMSeptember 3, 2025 8:07 AM
    2. Contract signed

      Feb 13, 12:00 AMFebruary 13, 2026 12:00 AM
    3. Result notice published

      Mar 23, 9:25 AMMarch 23, 2026 9:25 AM

    Brief

    Denmark: Tenders/Verdo Holding A/S/EU tender with negotiation regarding Steam Turbine major overhaul 2026

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Reparasjon og vedlikehold

    Verdo har inngått en avtale med Howden Axial Fans ApS om reparasjons- og vedlikeholdstjenester for en 48 MW BBC dampturbin og generator i Randers, Østjylland. Avtalen har en varighet til 2026 og en total verdi på 1 184 545 €. Tjenestene skal sikre at turbinen og generatoren kan operere trygt, pålitelig og effektivt frem til forventet levetid i 2036. Det ble lagt vekt på leverandørens løsningsbeskrivelse, tidsplan og nøkkelpersonell med relevant kompetanse og erfaring fra lignende overhalinger. Fire leverandører deltok i konkurransen.

    Result

    Winner
    Howden Axial Fans ApS
    Number of bids
    4
    Contract value
    €1,184,545

    About the bid

      VERDO Produktion, owner of the power plant in Randers, has decided to invite Tenderers for the major overhaul of the 48 MW BBC steam turbine and generator. The main purpose of the major overhaul is by preventive maintenance to ensure that the steam turbine and generator, is in a condition where it can operate safely, reliably, and efficiently until end of lifetime, which is expected to be in 2036. The turbine and generator had a major overhaul in 2017 and a vane carrier was replaced in 2020. The unit has been operating without any major issues since then. Replacement and inspection of any parts necessary to operate until 2036 should be included in the scope (assuming an intermediate minor overhaul). Delivery of the parts, if not included in this specification, is considered as extra work.Main features of the procedureThe tender is conducted in accordance with Directive 2014/25 of 26 February 2014 (the Utilities Directive). The contracting authority will pre-qualify 4 applicants who are invited to submit a bid. A contract will be signed with one bidder. The contracting authority is responsible for ensuring that the tender is conducted in accordance with the Utilities Directive, including observing the fundamental principles of transparency, equal treatment, and proportionality during the tender process. It is the bidder's risk to submit a bid in accordance with the tender material, and the bidder must expect that the contracting authority may be compelled to disregard an otherwise attractive bid if it does not meet the established requirements. The contracting authority uses the electronic tendering system, Mercell Ethics (hereafter "the tendering system"), to conduct the tender.

      Contact name
      Karina Winther Jensen
      Contact phone
      41748976
      Contact email
      kawj@verdo.com
      Address
      Agerskellet 7, 8920 Randers NV

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      To assess how the bidder will execute the task of performing the Major Overhaul, the bidder must prepare a solution description in their bid based on Annex 1, which must include the bidder’s approach to solving the task and addressing the Contracting Authority’s needs as outlined in Annex 1. In evaluating the solution description, positive weight is given to: The bidder's description demonstrating a good understanding of the requirements in Annex 1 and how the Contracting Authority's needs are met. The bidder's solution description including a clear and comprehensive explanation of how the fulfillment of the requirements in Annex 1 is planned, including a description of which methods, technologies, and work processes will be used in the realization of the project. The bidder's confirms a full and unambiguous compliance with the basic scope of supply and options stated in Annex 1. The bidder's description demonstrating a well prepared (project specific or generic) QA-plans and Inspection and Test Plans (ITP's) specifying holding points and witness points. The bidder's description demonstrating a well-documented cleaning and blasting plan from a similar project, including all needed procedures and specifications that demonstrate the tenderers' proper understanding of the scope and required/necessary tasks. The bidder's description demonstrating a good understanding of the needed performance of Non-Destructive Tests (NDT) and Life Time Assessment, cf. Annex 1, and reporting thereof. The bidder's description demonstrating a detailed commissioning plan covering the entire commissioning phase (cold commissioning, hot commissioning, vibration measurements, test runs, etc.) with detailed descriptions of tests.

      Evaluation Method

      Positive weight is given to:

      • The bidder's description demonstrating a good understanding of the requirements in Annex 1 and how the Contracting Authority's needs are met.
      • The bidder's solution description including a clear and comprehensive explanation of how the fulfillment of the requirements in Annex 1 is planned, including a description of which methods, technologies, and work processes will be used in the realization of the project.
      • The bidder's confirms a full and unambiguous compliance with the basic scope of supply and options stated in Annex 1.
      • The bidder's description demonstrating a well prepared (project specific or generic) QA-plans and Inspection and Test Plans (ITP's) specifying holding points and witness points.
      • The bidder's description demonstrating a well-documented cleaning and blasting plan from a similar project, including all needed procedures and specifications that demonstrate the tenderers' proper understanding of the scope and required/necessary tasks.
      • The bidder's description demonstrating a good understanding of the needed performance of Non-Destructive Tests (NDT) and Life Time Assessment, cf. Annex 1, and reporting thereof.
      • The bidder's description demonstrating a detailed commissioning plan covering the entire commissioning phase (cold commissioning, hot commissioning, vibration measurements, test runs, etc.) with detailed descriptions of tests.
    • Description

      It is important for the Contracting Authority that the bidder, in their bid, presents a process for realizing the tendered task that ensures the task is delivered on time and with high quality. Therefore, as outlined below, the Contracting Authority will emphasize that the bid includes a robust timeline, cf. Annex 1. The bidder must include a timeline in their bid, which should contain information regarding: Bidders must include all missing milestones for the activities stated in Annex 1A marked with yellow. Bidders must submit a preliminary time schedule for the major overhaul which covers the entire project execution in detail. Bidders must include the requested information about "delivery time" and "impact to time schedule" for all the options specified in the Technical Specification (Annex 1, section 4) and the Bid list (Annex 2). Bidders must include delivery time for optional spare parts stated in Annex 1E "Optional spare parts". It is expected that some of these spare parts will be ordered during the overhaul based on fact findings, and therefore the aim must be a quick delivery time. In assessing the "Timeline," emphasis will be placed on: The process and timeline being realistic, comprehensive, with quality assurance and addressing the Contracting Authority's overall temporal needs in Annex 1. Early milestones for supplies and services as stated in Annex 1A marked with yellow. Short and at the same time realistic time schedule for the major overhaul. Time schedules of less than 3 weeks will not be considered as realistic. A well-prepared and detailed time schedule with relevant actions for disassembly, transportation time in case of workshop activities, cleaning, blasting, visual inspection, fact-finding, NDT, assembly, commissioning phases, etc. Short and at the same time realistic delivery times and low impact on the time schedule for all the options as specified in the Technical Specification (Annex 1, section 4) and the Bid list (Annex 2). Short and at the same time realistic delivery times for the optional spare parts stated in Annex 1E "Optional spare parts". Delivery times of less than 3 weeks will be weighted very positively. Recommendations to avoid critical delays, like raw material, standby of workshop capacity, and other possible options for faster delivery time.

      Evaluation Method

      In assessing the "Timeline," emphasis will be placed on:

      • The process and timeline being realistic, comprehensive, with quality assurance and addressing the Contracting Authority's overall temporal needs in Annex 1.
      • Early milestones for supplies and services as stated in Annex 1A marked with yellow.
      • Short and at the same time realistic time schedule for the major overhaul. Time schedules of less than 3 weeks will not be considered as realistic.
      • A well-prepared and detailed time schedule with relevant actions for disassembly, transportation time in case of workshop activities, cleaning, blasting, visual inspection, fact-finding, NDT, assembly, commissioning phases, etc.
      • Short and at the same time realistic delivery times and low impact on the time schedule for all the options as specified in the Technical Specification (Annex 1, section 4) and the Bid list (Annex 2).
      • Short and at the same time realistic delivery times for the optional spare parts stated in Annex 1E "Optional spare parts". Delivery times of less than 3 weeks will be weighted very positively. Recommendations to avoid critical delays, like raw material, standby of workshop capacity, and other possible options for faster delivery time.
    • Description

      It is important for the Contracting Authority that the bidder, in their bid, presents an organization that ensures the project is delivered with high quality. Therefore, the Contracting Authority will place emphasis on the bid containing a robust organization and key personnel with the right professional competencies. The bidder must complete the needed information in Annex 1B (Key persons). The bidder must supply a Organizational chart with key personnel, showing the organization of the project, including the involvement of the Contracting Authority, if relevant. In assessing " Key persons and Organization," positive weight will be given to: The Tenderer can provide key persons with relevant competences, qualifications and experience from major overhauls at similar steam turbines. The organization being robust against unforeseen changes affecting the allocated personnel, including that the project is not significantly impacted by personnel changes, vacations, illness, etc. The evaluation will be based on the information provided in Annex 1B (Key Persons) and the supplied organizational chart.

      Evaluation Method

      In assessing "Key persons and Organization," positive weight will be given to:

      • The Tenderer can provide key persons with relevant competences, qualifications and experience from major overhauls at similar steam turbines.
      • The organization being robust against unforeseen changes affecting the allocated personnel, including that the project is not significantly impacted by personnel changes, vacations, illness, etc.
        The evaluation will be based on the information provided in Annex 1B (Key Persons) and the supplied organizational chart.
    • Description

      All prices must be stated in Euro (EUR) or Danish Kroner (DKK), excluding VAT and including possible discounts. All prices must be fixed prices. When evaluating prices stated in Danish Kroner (DKK) it will be converted into Euro (EUR) according to an exchange rate of DKK/EUR 7.45. The evaluation of the sub-criteria "Price" is based on the total tender sum comprising the following price elements: The price for the basic scope of supply according to the Bid list. The prices for the options according to the Bid list (corrected sum, according to description in the Tender Conditions). The prices for mandatory spare parts specified in Annex 1D (according to description in the Tender Conditions). The prices for optional spare parts specified in Annex 1E (according to description in the Tender Conditions). Rates for extra works/supplies (according to description in the Tender Conditions).

      Evaluation Method

      The lowest price for “total price” will receive the highest score (10) on a scale from 0–10. The other tenderers will receive points relative to the best price. The other tenders will be scored based on the relative difference to the highest score, where the tender with a price that is 60% higher (or more) will receive 0 points.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Verdo Holding A/S
    Title
    EU tender with negotiation regarding Steam Turbine major overhaul 2026
    Type
    ResultPrequalification
    Main code
    50000000Repair and maintenance services
    Supplemental codes
    50530000Repair and maintenance services of machinery
    Location
    Østjylland
    Estimated value
    DKK 8,000,000.00
    Duration
    2,026 years

    Active similar competitions

    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification systemNov 18, 2025
      Dec 16, 2028(100+ days)
    • METROSELSKABET I/S

      Jernbane- og infrastrukturbygging

      Copenhagen - New Metroline, M5 Civil Works South

      Metroselskabet I/S needs civil works for the M5 Metroline South package in Copenhagen, Denmark, over a period of 9 years. This design & build contract, under ABT18 terms, involves the construction of approximately 6.5 km of twin bored TBM tunnels, 5 underground stations, 2 underground crossovers, 1 shaft, 5 cross passages, 1 ramp, approximately 2.0 km of viaduct, 1 elevated station, 1 viaduct cross-over, 1 elevated bifurcation, and short embankment sections. The M5 line is a fully automated driverless metro system designed to enhance passenger service and extend connectivity to emerging urban development areas. The contract will be awarded based on Price (50%) and Quality (50%), with Quality sub-criteria including Technical solution and planning (16%), Management and collaboration (16%), Organization and key personnel (10%), and Carbon (8%). To qualify, applicants must have completed one project demonstrating experience with design, construction, and project management of an underground metro project in the EEA and/or the UK, and one project demonstrating experience with design, construction, and project management of an above-ground metro project in the EEA and/or the UK, both within the last 15 years. Additionally, applicants must have an equity of no less than EUR 100,000,000.00 and a total annual turnover of at least EUR 1,700,000,000.00 in each of the last three completed financial years.

      Competition with qualificationSep 10, 2026
      Oct 13, 2026(3 days)
    • Energistyrelsen

      Elektrisk utstyr og belysning

      North Sea I, South, Offshore Wind Farm

      Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

      CompetitionNov 20, 2025
      Oct 23, 2028(100+ days)
      DKK 6,600,000,000
    • Miljøstyrelsen

      Forskning og miljøovervåking

      Genudbud - Projekter vedrørende sameksistens mellem havvind og havnatur

      Miljøstyrelsen søger tjenesteydelser til projekter vedrørende sameksistens mellem havvind og havnatur, med en økonomisk ramme på op til 15 millioner DKK. Der kan tildeles kontrakter til op til tre projekter, hvor hvert projekt maksimalt kan modtage 7,5 millioner DKK ekskl. moms. Projekterne skal bidrage med videnskabeligt funderet empirisk viden om, hvordan havvindaktiviteter påvirker havmiljøet, herunder identifikation af væsentlige påvirkninger, positive/negative effekter, geografisk udbredelse og effekten af afværgetiltag. Projektet forventes afsluttet senest den 30. november 2030. Tildelingskriterierne vægtes som følger: Opgaveforståelse (10%), Opgaveløsning (50%), Erfaring og kompetencer (30%) og Pris (10%). Kvalifikationskrav inkluderer dokumenteret erfaring med marine økosystemer og empirisk feltarbejde på havet, samt projektledelsesmæssig robusthed fra tilsvarende projekter, dokumenteret via CV'er (maks. 2 sider pr. person) for nøglepersoner.

      CompetitionSep 15, 2026
      Oct 19, 2026(9 days)
      DKK 15,000,000
    • Vestegnens Kraftvarmeselskab I/S

      Dynamisk indkøbssystem for entreprenørydelser

      Det dynamiske indkøbssystem indenfor entreprenørydelser indeholder allerede rør- og anlægsarbejder samt kundeinstallationer. Dette udbud vedrører udbud af én ekstra kategori til dette dynamiske indkøbssystem: Kategori 7: Levering og montering af muffer. Ydelserne på denne kategori omfatter eksempelvis, men ikke begrænset til: - demontering af eksisterende muffer, levering og montering af nye muffer inklusive isolering - levering, montering og dokumenteret indmåling af retableret lækagesystemet i henhold til VEKS-standarder - indhentning af alle nødvendige tilladelser, koordinering med myndigheder og bygherre eller dennes rådgiver. Det dynamiske indkøbssystem er således efter afslutningen af dette udbud opdelt i 7 kategorier: Kategori 1: Rørarbejder og anlægsarbejder, arbejder op til 4 mio. kr. Kategori 2: Rørarbejder og anlægsarbejder, arbejder over 4 mio. kr. Kategori 3: Kundeinstallationer, små installationer op til 200 kW Kategori 4: Kundeinstallationer, store installationer over 200 kW Kategori 5: Levering af fjernvarmeunits Kategori 6: Montering af fjernvarmeunits Kategori 7: Levering og montering af muffer. Udbuddet vedrører ALENE oprettelse af kategori 7. Der kan anmodes om optagelse på denne kategori 7. De øvrige kategorier (kategori 1-6) har allerede været udbudt, og der kan løbende anmodes om optagelse på disse.

      Dynamic purchasing systemJul 5, 2024
      Oct 29, 2041(100+ days)
      DKK 12,000,000