Search
  • Search


    Fjenneslev Sol PV-Project - EPC Contract - 190 MWp (DC)

    HOFOR Vind A/S

    Fjenneslev Sol PV-Project - EPC Contract - 190 MWp (DC)

    1. Competition notice published

      Feb 27, 2025 2:54 PMFebruary 27, 2025 2:54 PM
    2. Supplier selection

      Jul 3, 2025 12:00 AMJuly 3, 2025 12:00 AM
    3. Contract signed

      Jul 17, 2025 12:00 AMJuly 17, 2025 12:00 AM
    4. Result notice published

      Aug 5, 2025 4:03 AMAugust 5, 2025 4:03 AM

    Brief

    Denmark: Tenders/HOFOR Vind A/S/Fjenneslev Sol PV-Project - EPC Contract - 190 MWp (DC)

    Awarded

    The competition has ended and a winner has been selected.

    Qualification deadline
    Aug 4, 2025Expired
    Award
    Project Proposal 25% and 4 more
    Procedure
    With negotiationTwo stages
    Agreement
    Construction work
    Estimated value
    €81Mover 3 years

    Brief

    HOFOR Vind A/S har inngått en avtale med Energi Innovation APS for design, anskaffelse og bygging av en fotovoltaisk kraftstasjon med en kapasitet på 190 MWp (DC) i Vest- og Sydsjælland, Danmark. Avtalen inkluderer også en drifts- og vedlikeholdsavtale (O&M) med opsjoner for forlengelse av vedlikehold, gress- og vegetasjonsstyring, rengjøring av alle moduler og termografisk inspeksjon av alle moduler. Avtalen har en total verdi på 70 148 218 euro og en varighet på 3 år. Det var krav om dokumentasjon av avvik fra EPC- og O&M-avtaledokumentene, samt teknisk løsning, prosjektorganisasjon og nøkkelpersonell, prosjektprogram, kvalitetsstyring, helse og sikkerhet, og bærekraft. Tre leverandører deltok i konkurransen.

    Elektrisk installasjonsarbeid

    Result

    TED
    • Energi Innovation APS
      Winner
    • Number of bids
      3
    • Contract value
      €70,148,218

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      Leverandøren må som et minimum oppfylle følgende krav for de to siste reviderte og godkjente årsrapportene: Omsetning på 80.000.000 EUR eller høyere, gjennomsnitt av de to siste årene.

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Leverandøren må som et minimum oppfylle følgende krav for de to siste reviderte og godkjente årsrapportene: Egenkapitalrentabilitet (RoE) på 15 % og over, årlig.

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Leverandøren må som et minimum oppfylle følgende krav for de to siste reviderte og godkjente årsrapportene: Soliditetsgrad på 15 % og over, årlig.

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Det er et minimumskrav at leverandøren har prosedyrer/systemer for helse, miljø og sikkerhet på plass som er i samsvar med ISO 45001:2018 eller tilsvarende (styring av arbeidsmiljø).

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Det er et minimumskrav at leverandøren har prosedyrer/systemer for miljø på plass som er i samsvar med ISO 14001:2015 eller tilsvarende (miljøstyring).

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Det er et minimumskrav at leverandøren har prosedyrer/systemer for kvalitet på plass som er i samsvar med ISO 9001:2015 eller tilsvarende (kvalitetsstyringssystem).

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Det er et minimumskrav at leverandøren har erfaring med prosjekter med nettilknyttede solcellekraftverk. Kun referanser der leverandøren (og/eller den "støttende enheten") har utført og/eller vært ansvarlig for alle elementer av; design, anskaffelse, konstruksjon og igangkjøring av en kontrakt/et prosjekt kan brukes som referanse. Det er et minimumskrav at innsendte referanser viser en kumulativ installert kapasitet på minimum 200 MWp og at minimum én av referansene er fra et PV-anlegg som er innenfor produksjonskategori D (i henhold til EU 2016/631) eller tilsvarende.

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Det er videre et minimumskrav at leverandøren (og/eller den "støttende enheten" jf. nedenfor i denne underklausulen) har erfaring med implementering av SCADA-system fra et PV-anlegg som er innenfor produksjonskategori D (i henhold til EU 2016/631) eller tilsvarende. Referansen(e) må inkludere systemets driftsytelse, pålitelighet og integrasjonsmuligheter i prosjektene.

      Documentation Requirement

      Ikke spesifisert.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      The Total Evaluated Price is calculated based on the following elements: a) TOTAL COSTS (no. 1.1 – 6.4), cf. “Price List (Main Solution)” b) “Total sum” cf. “Change Order Prices” c) Any capitalization of reservations For further details, please see the Tender Conditions.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Where; Technical solution = 60% of 25% Project Organisation and Key Personnel = 25% of 25% Project Programme = 15% of 25% For further details, please see the Tender Conditions.

      Sub-criteria

      • Technical solution60%

        Technical solution = 60% of 25%

      • Project Organisation and Key Personnel25%

        Project Organisation and Key Personnel = 25% of 25%

      • Project Programme15%

        Project Programme = 15% of 25%

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The sub-criterion Project Terms will be evaluated based tenderer's deviations from the EPC and the O&M Agreement contractual documents. For further details, please see the Tender Conditions.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For further details, please see the Tender Conditions.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For further details, please see the Tender Conditions.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      Where; Low carbon materials and solutions = 40% of 5% Use of Apprentices = 60% of 5% For further details, please see the Tender Conditions.

      Sub-criteria

      • Use of Apprentices60%

        Use of Apprentices = 60% of 5%

      • Low carbon materials and solutions40%

        Low carbon materials and solutions = 40% of 5%

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at HOFOR Vind A/S

    From the notice

    • HOFOR is to build a PV-plant at Fjenneslev in Centrale Zealand, Denmark, with the capacity of power of 190 MWp (DC).The PV-plant will be connected through a temporary grid connection expected in Q2/2026 based on Energinet’s (the public transmission operator in Denmark) standard concept for temporary grid connections and later will be transferred to the final grid connection expected in Q2/Q3 2030 at a new Energinet-owned 132 kV substation in the area. The overall Fjenneslev PV-project is divided into the following contracts: 1) Delivery of perimeter fencing and vegetation (OTHER CONTRACT), 2) Delivery and installation of two (2) main transformers for the substation (OTHER CONTRACT), 3) EPC Substation excluding delivery of transformer, including installation of export cable (OTHER CONTRACT), 4) EPC PV plant, including PV panels and Operation & Maintenance agreement (O&M) (THIS TENDER) This tender FJV_SOL-EPC-PV - is for the design, procurement and construction of a photovoltaic power station with a capacity of power of 190 MWp (DC). The tender includes an O&M Contract. The tender will include the following options: • Prolongation of maintenance of the O&M Contract • Grass and vegetation management • Cleaning of all modules • Thermographic inspection of all modules The basis of the contract will be an amended version of the Yellow FIDIC book 2017. The contract(s) is expected to be awarded in June 2025 upon the completion of the tender.Main features of the procedureThe tender is carried out as a negotiated procedure according to directive 2014/25/EU of the European Parliament and the Council of 26 February 2014 (The Utilities Directive) as implemented in Executive Order No. 1078 of 29 June 2022. This involves the following processes: 1. Prequalification process consisting of the following phases 1a) Based on a Notice published in TED (Tenders electronically daily supplement to the Official Journal of EU) applicants/economic operator who meet the minimum requirement set out in 5.3.2 are encouraged to apply for prequalification 1b) A selection of applicants/relevant economic operators will be carried out according to the procedure specified in the section 5.3.3. According hereto up to 3 economic operators will be prequalified. 2. Invitation to tender/tender process: (Up to) 3 applicants which are prequalified based on the prequalification criteria are invited to tender including submission of first tenders, revised tenders which expectably is BAFO ("Best And Final Offer") including participation in expectably 1 round of negotiations. 3. Evaluation and award: HOFOR will evaluate final tenders and award the contract (leading to signing).

    • Contact

      Mette Munch-Boutrupmetmun@hofor.dk
    • Type
      Result · Prequalification
    • Location
      Vest- og Sydsjælland
    • Main code
      Construction work
      45000000
    • 09300000Electricity, heating, solar and nuclear energy09330000Solar energy09331000Solar panels09331200Solar photovoltaic modules09332000Solar installation45310000Electrical installation work45317300Electrical installation work of electrical distribution apparatus51111000Installation services of electric motors, generators and transformers51112000Installation services of electricity distribution and control equipment51112100Installation services of electricity distribution equipment71310000Consultative engineering and construction services71311000Civil engineering consultancy services

    Similar active competitions

    • Energistyrelsen

      Elektrisk utstyr og belysning

      North Sea I, South, Offshore Wind Farm

      Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

      Competition
      Oct 23, 2028(100+ days)
      DKK 6,600,000,000
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(3 days)
      €30,442,953
    • Waterford and Wexford Education and Training Board_110494

      Anleggs- og infrastrukturbygging

      GWM-6797 - Solar PV EPC qualification system

      ESB is seeking expressions of interest to obtain a place on a qualification system that will be established for EPC companies to: — design, — procure, — supply, — install, — commission and — maintain all elements of ground-mounted solar farms. The projects will be located in Ireland and the UK, and the qualification system may include projects developed by ESB, ESB joint venture companies (existing or yet to be formed), ESB subsidiary companies or companies ESB Group has a minority interest in. Applicants must be able to provide the full scope of services of a solar EPC contractor, including all associated construction, balance of plant and grid connection works. ESB plans to develop ground-mounted solar farms commencing in 2019, through a pipeline of planned projects. The size of individual projects is expected to range between 4 MW and 100 MW, although some projects could be outside of this range. Applicants should note that the detailed scope and contracting strategy for each project will be determined in any subsequent procurement competition (which may include a further pre-qualification process before the tender phase) and may include some or all of the scope items identified above. In the nearer term, the contracting entity is pursuing in excess of 200 MW of ground-mounted solar sites with a view to delivery utilising the qualification system. While the total number of projects and MW to be delivered under the qualification system throughout its existence cannot be determined at this time, the total number of MWs could substantially exceed 200 MW. Further detail will be available at a later date, once the qualification system is established. Please note this is the same Qualification system established under OJEU notice 2018/S 213-489106, this new notice is being issued because the system duration is indefinite and to allow new applicants to apply. There is no need to apply again if you have submitted an interest previously for this Qualification system via eTenders ref 141709.

      Qualification system
      Feb 18, 2028(100+ days)