    Framework agreement on Porcelain Post Insulators for 145kV, 170kV, 245kV, and 420kV

    Energinet Eltransmission A/S

    Framework agreement on Porcelain Post Insulators for 145kV, 170kV, 245kV, and 420kV

    1. Contract signed

      Apr 9, 12:00 AMApril 9, 2026 12:00 AM
    2. Result notice published

      Apr 13, 6:23 AMApril 13, 2026 6:23 AM

    Brief

    Denmark: Tenders/Energinet Eltransmission A/S/Framework agreement on Porcelain Post Insulators for 145kV, 170kV, 245kV, and 420kV

    Awarded

    The competition has ended and a winner has been selected.

    Qualification deadline
    Apr 12,Expired
    Award
    Solution description 15% and 2 more
    Procedure
    With negotiationTwo stages
    Agreement
    Framework agreement
    Estimated value
    DKK 75Mover 8 years

    Brief

    Energinet Eltransmission A/S har indgået en rammeaftale med Allied Insulators Ltd. om levering af porcelænsstolpeisolatorer til 145kV, 170kV, 245kV og 420kV i Sydjylland. Aftalen har en varighed på 8 år og en maksimal totalværdi på 75 millioner DKK. Der blev lagt vægt på pris og CO2-budget (råmaterialer og transport), løsningsbeskrivelse (installation, bøjningsbelastning, torsionsbelastning og flangeudformning), leveringstid og kontraktvilkår. Der deltog 2 leverandører i konkurrencen.

    Elektrisk utstyr og belysning

    Result

    TED
    • Allied Insulators Ltd.
      Winner
    • Number of bids
      2
    • Contract value
      DKK 75,000,000
    • Maximum framework agreement valueUp to DKK 150,000,000

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Award Criteria

    • Description

      Prices and carbon budget (Raw material and Transport) must must be stated in the attached Tender List (doc no.: 25/10183-24) and the defined price elements/ data must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. In relation to understanding how to fill out the sheets Raw materials and Transport reference is made to Appendix 1I: Rules regarding carbon footprint (doc. No.: 25/10183-30. Prices must be stated in EUR When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Tender List (doc no.: 25/10183-24).

      Evaluation Method

      The Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Tender List (doc no.: 25/10183-24).

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The tenderer must fill out the document “Appendix 2A: Technical Data List” doc. No. 25/10183-18 in connection with the response of this sub-criterion. In the evaluation of 'Solution description', the Contracting Authority will emphasize the extent to which the tenderer complies with Contracting Authority specifications on the specified voltage levels, see Appendix 2 – Scope of Works, doc. No. 25/10183-17. An overall evaluation will be made of this sub-criteria.

      Evaluation Method

      In the evaluation of 'Solution description', the Contracting Authority will emphasize the following:

      • Installation (40%): It will be evaluated positive if tenderer’s solutions have a design that assist in reducing Contracting Authority cost for installation on site for the relevant voltage level. Low amount of Assembly parts will be evaluated positive:
        • 1 assembly part will result in a score of 10
        • 2 assembly parts will result in a score of 7
        • 3 assembly parts will result in a score of 3
        • 4 assembly parts or more will result in a score of 0
      • Technical requirements on Failing load, bending (20%): It will be evaluated positive if tenderer’s solutions have higher values than specified in technical requirements for the relevant voltage level. Submitted values for the relevant voltage level that are:
        • Values higher than 40% than required will result in a score of 10 points
        • Values higher than 30% or equal to 40% higher than required will result in a score of 8 points
        • Values higher than 20% or equal to 30% higher than required will result in a score of 6 points
        • Values higher than 10% or equal to 20% higher than required will result in a score of 4 points
        • Values higher than required or equal to 10% higher will result in a score of 2 points
        • Values equal to required will result in a score of 0 points
      • Technical requirements on Failing load torsion (20%): It will be evaluated positive if tenderer’s solutions have higher values than specified in technical requirements for the relevant voltage level. Submitted values for the relevant voltage level that are:
        • Values higher than 40% than required will result in a score of 10 points
        • Values higher than 30% or equal to 40% higher than required will result in a score of 8 points
        • Values higher than 20% or equal to 30% higher than required will result in a score of 6 points
        • Values higher than 10% or equal to 20% higher than required will result in a score of 4 points
        • Values higher than required or equal to 10% higher will result in a score of 2 points
        • Values equal to the required will result in a score of 0 points
      • Design of Top and bottom flange (20%): For those solutions where a Pitch circle diameter of bolts in the technical requirements is required higher than the corresponding diameter stated in the IEC 60273:1990, it will evaluate positive if, it is possible to order with other standard diameter sizes down to the stated diameter in the IEC 60273:1990 for that specific type of post insulator. Offering a flexible solution where the offered products can be delivered with other pitch circle diameters, as stated above, will result in a score of 10. Complying with the stated pitch circle diameter in technical specification will result in a score of 0.

      Sub-criteria

      • Installation40%

        It will be evaluated positive if tenderer’s solutions have a design that assist in reducing Contracting Authority cost for installation on site for the relevant voltage level.

        Evaluation Method: Low amount of Assembly parts will be evaluated positive: * 1 assembly part will result in a score of 10 * 2 assembly parts will result in a score of 7 * 3 assembly parts will result in a score of 3 * 4 assembly parts or more will result in a score of 0

      • Technical requirements on Failing load, bending20%

        It will be evaluated positive if tenderer’s solutions have higher values than specified in technical requirements for the relevant voltage level.

        Evaluation Method: Submitted values for the relevant voltage level that are: * Values higher than 40% than required will result in a score of 10 points * Values higher than 30% or equal to 40% higher than required will result in a score of 8 points * Values higher than 20% or equal to 30% higher than required will result in a score of 6 points * Values higher than 10% or equal to 20% higher than required will result in a score of 4 points * Values higher than required or equal to 10% higher will result in a score of 2 points * Values equal to required will result in a score of 0 points

      • Technical requirements on Failing load torsion20%

        It will be evaluated positive if tenderer’s solutions have higher values than specified in technical requirements for the relevant voltage level.

        Evaluation Method: Submitted values for the relevant voltage level that are: * Values higher than 40% than required will result in a score of 10 points * Values higher than 30% or equal to 40% higher than required will result in a score of 8 points * Values higher than 20% or equal to 30% higher than required will result in a score of 6 points * Values higher than 10% or equal to 20% higher than required will result in a score of 4 points * Values higher than required or equal to 10% higher will result in a score of 2 points * Values equal to the required will result in a score of 0 points

      • Design of Top and bottom flange20%

        For those solutions where a Pitch circle diameter of bolts in the technical requirements is required higher than the corresponding diameter stated in the IEC 60273:1990, it will evaluate positive if, it is possible to order with other standard diameter sizes down to the stated diameter in the IEC 60273:1990 for that specific type of post insulator.

        Evaluation Method: Offering a flexible solution where the offered products can be delivered with other pitch circle diameters, as stated above, will result in a score of 10. Complying with the stated pitch circle diameter in technical specification will result in a score of 0.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The tenderer must specify the guaranteed delivery time from the contracting authority’s order to final delivery. The delivery time must be entered in calendar days in the document “Appendix 2A: Technical Data List” doc. No. 25/10183-18. Please note that the guaranteed delivery time will be subject to liquidated damages, cf. section 12.1 i Appendix 1: General Terms and Conditions for Purchase of the contract. A delivery time exceeding 496 calendar days will not be accepted and will be considered non-compliant, cf. section 2.7.1 of the tender conditions.

      Evaluation Method

      The evaluation of the sub-criterion “Delivery Time” will be based on the guaranteed delivery time offered by the tenderer. If the tenderer offers a delivery time of 186 calendar days, a score of 10 will be awarded, whereas a delivery time of 496 calendar days will result in a score of 0. Scores between these two values will be determined by linear interpolation.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For the evaluation of the sub-criteria the below should be enclosed: If the tenderer includes a list of proposed deviations to the attached contractual terms: Agreement under Framework Agreement (doc. no. 25/10183-12), Appendix 1: General Terms and Conditions for Purchase (doc. no. 25/10183-13) the tenderer must use the Clarification List (doc. no. 25/10183-10). The proposed deviations to the contractual terms must be stated in the spreadsheet marked “Legal clarification” and should be explicit and with explanation as to why they are made. The tendered assignment must be performed on the basis of the attached contract terms. The tenderer may, however, suggest explicit and well-explained deviations to the contractual terms which the Contracting Authority has identified as competitive criteria below: Appendix 1: General Terms and Conditions for Purchase (doc. 25/10183-13) and, where relevant, same Clauses and Sub-Clauses in the Agreement under the Framework Agreement (doc. no. 25/10183-13): Clause 9 (Time of Delivery), Clause 11 (Intellectual property rights), Clause 12 (Late-delivery or non-delivery), Clause 13 (Defects and remedies), Clause 14 (Limitation of liability), Clause 15 (Product liability), Clause 16 (Insurance), Clause 17 (Indemnification), Clause 18 (Performance guarantee), except for what is stated above under sub-section 3.7.1 (Tenderer’s reservations), Sub-Clause 20.3 (HSE requirements), Clause 25 (Termination). These will be included in the evaluation of the sub-criterion "Contract terms" and it is noted that any deviations may lead to a reduction to the score depending on the content, clarity, and consequence. In this regard it is explicitly noted that deviations which intends to limit liability and shift the financial risk in favor of the tenderer will be of particular importance in the evaluation. An overall evaluation will be made of this sub-criterion. A minimum score of 4 must be achieved, cf. sub-section 3.7.1

      Evaluation Method

      Any deviations may lead to a reduction to the score depending on the content, clarity, and consequence. Deviations which intends to limit liability and shift the financial risk in favor of the tenderer will be of particular importance in the evaluation. No deviations, and thereby absolute fulfillment of the contract terms, will result in the maximum score of 10.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet Eltransmission A/S

    From the notice

    • The Contracting authority intends to tender out a framework agreement on Porcelain Post Insulators for 145kV, 170kV, 245kV, and 420kV

    • Contact

      Procurement - Bprocurement@energinet.dk
    • Type
      Result · Framework agreement · Prequalification
    • Location
      Sydjylland
    • Main code
      Electric motors, generators and transformers
      31100000

    Similar active competitions

    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(4 days)
      €30,442,953
    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification system
      Dec 16, 2028(100+ days)
    • Energinet

      Bank- og finansformidlingstjenester

      Rammeaftale på økonomikonsulenter - 26/17294

      Energinet søger økonomikonsulenter til en rammeaftale med en løbetid på 4 år, der kan forlænges med 2+2 år, hvilket giver en potentiel samlet varighed på 8 år. Den forventede samlede værdi af rammeaftalen er 64.000.000 DKK, med en maksimal totalværdi på 80.000.000 DKK. Ydelsen omfatter løbende økonomisk assistance, primært til Energinet Koncernens Shared Service Center, økonomifunktion med drifts- og anlægscontrolling og -analyse, samt ad-hoc opgaver i moderselskabet og datterselskaber. Der er krav om en egenkapital på minimum 8.000.000 DKK fra seneste årsregnskab, og ansøgere skal indsende op til 3 betydeligste sammenlignelige referencer udført inden for de seneste 3 år, der vedrører økonomisk assistance. Tildelingskriterierne vægtes som pris (35%), kompetencer (55%) og kontraktvilkår (10%).

      Framework agreement with qualification
      Nov 5, 2026(7 days)
      DKK 80,000,000