Search
  • Search


    Hesselø Offshore Wind Farm

    Energistyrelsen

    Hesselø Offshore Wind Farm

    1. Competition notice published

      Nov 19, 2025 12:25 PMNovember 19, 2025 12:25 PM
    2. Questions deadline

      Apr 28, 9:55 PMApril 28, 2026 9:55 PM
    3. Tender submission deadline

      May 20, 12:00 PMMay 20, 2026 12:00 PM
    4. Opening date

      May 20, 12:05 PMMay 20, 2026 12:05 PM
    5. Tender validity period

      Jan 20, 2027 1:00 PMJanuary 20, 2027 1:00 PM

    Brief

    Denmark: Tenders/Energistyrelsen/Hesselø Offshore Wind Farm

    Expired

    The competition has expired without a winner being announced.

    Deadline
    May 20,Expired
    Award
    Price only
    Procedure
    OpenSingle stage
    Agreement
    Construction work
    Estimated value
    DKK 21.9Bover 40 years

    Brief

    The Danish Energy Agency is procuring the establishment and operation of the Hesselø Offshore Wind Farm, a large-scale offshore wind farm with a minimum capacity of 800 MWh, located in Nordsjælland. The contract has a duration of 40 years, with economic support provided for 20 years through a capability-based two-way contract for difference (CfD) scheme, capped at 21.9 billion DKK (2025-prices). The concessionaire will bear all commercial risks, except for the CfD scheme, and must establish the minimum capacity by 31 December 2032. The award criterion is the lowest bid price (100%). Tenderers must demonstrate technical and professional capacity by providing at least one reference from a large-scale offshore energy production project completed within the last ten years, with construction costs of at least 500 million DKK, fixed to the seabed at a minimum 10-meter sea depth, and a contract duration of at least 25 years. The reference must show experience in at least three of six key areas: project management, engineering, procurement, execution, operation, or quality control.

    Elektrisk utstyr og belysning

    Register interest in EU Supply

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      The Tenderer must fulfil the following minimum requirement in order to demonstrate the ability to perform the Concession Agreement: 1. At least one (1) reference covering a largescale offshore project in relation to energy production, completed within the last ten (10) years. A largescale offshore project in relation to energy production must, as a minimum, have the following characteristics in order to be considered: a. Construction costs (CAPEX) of minimum DKK 500,000,000, b. be fixed to the seabed, at least at 10 meters sea depth in average across the site, and c. have a duration of contract, permit, licence, approval or the like of min. 25 years. The reference must show experience with at least three (3) of the six (6) following key areas: 1) project management, 2) engineering, 3) procurement, 4) execution, 5) operation, or 6) quality control. The Tenderer may document experience with the above in a minimum of three (3) key areas via one (1) or more references, provided that each reference covers a largescale offshore project in relation to energy production. Only references completed within the latest ten (10) years before the expiry of the deadline for submission of tender will be accepted. As regard the assessment of whether a largescale offshore project is completed within the latest ten (10) years, the DEA will accept the following examples (which are not exhaustive): • An offshore wind farm with an A/C substation where the last turbine has delivered the first kWh to the grid (fully commissioned offshore wind farm). • An offshore oil- and gas development project including installation of fixed installations and commissioning and subsequent production/operation.

      Documentation Requirement

      Information regarding the references should be specified in part IV, section C of the ESPD. If the Tenderer prefers to submit the list of references as a separate document, this is accepted as well. However, illustrations, photographs etc. will not be taken into account. Re (1) For each project used as a reference (at least one (1), maximum five (5) references), the Tenderer must provide the following description: a. Name of largescale offshore project b. Description of main elements of the largescale offshore project including where relevant grid connection (AC-substation, etc.) from the offshore project to onshore/offshore point of connection; c. Contact person at the contracting entity and/or the authority who awards the permit/licence/approval or the like (preferably including phone number and email address); d. Contract signing date or the date of issuing the permit/licence/approval etc. (with the minimum duration of 25 years); e. Location of the largescale offshore project; f. The Tenderer's/the supporting entity’s role (i.e. developer, owner, main consultant, sub-contractor, financial investor, or other); g. The Tenderer's/the supporting entity’s contribution to the project within the following key areas: 1) project management, 2) engineering, 3) procurement, 4) execution, 5) operation and/or 6) quality control; h. Time of completion of the project (within the last 10 years). If more than a total of five (5) references completed within the latest ten (10) years before the expiry of the deadline for submission of tender are submitted by a Tenderer, including where a Tenderer is a group of economic entities, e.g. a consortium or joint venture, only the five (5) newest references completed within the latest ten (10) years before the expiry of the deadline for submission of tender will be considered. If it is not possible to identify the five (5) newest references, the five (5) newest references will be selected by drawing of lots of the references submitted by the remaining entities in the group of Tenderers or from the supporting entities which has been completed within the latest ten (10) years before the expiry of the deadline for submission of tender. Upon request, the Tenderer to whom the DEA intends to award the Concession Agreement must submit documentation regarding the information stated in the ESPD, cf. section 151 of the Danish Public Procurement Act. The list of references, that the Tenderer specifies in the ESPD will constitute the final documentation for the Tenderer's information about the technical and professional capacity. Reference is further made to the Procurement Specifications, section 11.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      Award of the Concession Agreement to the most economically advantageous tender will take place on the basis of the award criterion, “price”. The award criterion, “price”, will be assessed on the basis of the bid price offered by the Tenderer in the Tender Submission Letter (Annex A), in the Procurement Specifications. The offered bid price must constitute a price per unit of electricity in “DKK”/MWh excl. VAT, which the Tenderer will be guaranteed for the duration of the 20-year subsidy period. The bid price of the Successful Tenderer will constitute the so-called “strike price” under the Concession agreement, cf. Appendix F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference). The Tenderer submitting the tender with the lowest offered bid price will be awarded the right and obligation to establish an offshore wind farm in the concession area, as set out in Appendix 2 (Location of the Concession Area).

      Evaluation Method

      The Tenderer submitting the tender with the lowest offered bid price will be awarded the right and obligation to establish an offshore wind farm in the concession area.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energistyrelsen

    From the notice

    • The Danish Parliament has in recent years agreed to a large expansion in offshore wind farms in Denmark. The aim is to ensure the green transition and strengthening the future security of supply of energy in Denmark. The political agreements that this procurement concerns are: - Climate Agreement from 29 June 2018, - Climate Agreement from 22 June 2020, - the Financial Act from 4 December 2022, - Climate Agreement regarding green electricity and heat from 25 June 2022 - Additional Agreement on the procurement details regarding 6 GW offshore wind and Energy Island Bornholm from May 30 2023, and - Agreement on procurement frameworks for three offshore wind farms from 19 May 2025 as adjusted on 7 November 2025. This procurement concerns the establishment of one (1) new large-scale offshore wind farm named Hesselø, pursuant to the directive 2014/24/EU on public procurement as implemented into Danish law by the Danish Public Procurement Act, cf. consolidated act no. 116 of 3 February 2025 with later amendments (in Danish: Udbudsloven). The procurement procedure applicable to this procurement constitutes an open procedure, cf. section 56 of the Danish Public Procurement Act. The Concessionaire is granted a right and obligations to utilise the concession area for the establishment and operation of an offshore wind farm with a minimum capacity of 800 MWh for the purpose of producing and distributing electricity at the sole risk and expense of the Concessionaire. Notwithstanding the foregoing, the concessionaire of Hesselø Offshore Wind Farm, will be economically supported for the electricity produced from the minimum capacity by a capability based two-way contract for difference (“CfD”) scheme for a period of 20 years. Under the capability-based two-way CfD scheme, the Concessionaire must make payments to the Danish State in months where the strike price (equal to the “bid price” of the Successful Tenderer) is lower than the reference price (to be calculated by the DEA as the weighted monthly average of the day-ahead prices, weighted by the maximum power production capability of the turbines or “Available Active Power” as further set out in the procurements material). There is no cap on the payments from the Concessionaire to the Danish State, and the Concessionaire has no option to opt out of the capability-based two-way CfD scheme. Correspondingly, in months where the strike price is higher than the reference price, the Concessionaire will receive subsidies up to cap of 21.9 billion DKK excl. VAT (2025-prices) in the form of payments from the Danish State. Reference is made to the Annex F (Concession Agreement) and Appendix 3 (Capability-Based Two-Way Contract for Difference) for an overall description of the principles in capability-based two-way CfD scheme. The scheme constitutes State aid within the meaning of Article 107(1) of the Treaty on the Functioning of the European Union (TFEU). Please note that the name of the offshore wind farm can be changed by the Danish Energy Agency (“DEA”). Such change will not affect the geographical location of the offshore wind farm. Hesselø will in the following be called “the Offshore Wind Farm”. The minimum capacity of the Offshore Wind Farm shall be established no later than 31 December 2032. The concessionaire will in special cases be entitled to an extension of this deadline. Connection of the Offshore Wind Farm to the Danish transmission grid is voluntary for the concessionaire. The Concession Agreement further enables the Concessionaire to establish overplanting capacity in excess of the required minimum capacity within the concession area, i.e. it is optional for Concessionaire to establish more than 800 MW capacity within the Concession Area. Furthermore, the Concessionaire may exploit the production capacity of electricity from the Offshore Wind Farm for energy production, such as but not limited to innovative energy production (e.g. Power-to-X), if this is otherwise possible within the applicable legislation. With the sole exception of the capability-based two-way CfD scheme, the Concessionaire bears all commercial risks associated with the establishment, operation and decommissioning of the Offshore Wind Farm, including any potential overplanting capacity. Such commercial risks include but is not limited to, legislative changes and general market conditions and demands. Additionally, the Concessionaire is responsible for the commercial risks related to any innovative energy production (e.g. Power-to-X facility). The Concessionaire shall bear the costs as stipulated in the construction permit and/or procurement material. Please note that contrary to earlier procurements rounds concerning offshore wind the Concessionaire shall not bear the actual cost of the temporary and permanent preventive measures, which by decision of the Danish Defence must be implemented by the Concessionaire to prevent deteriorations in the quality of the current military radio communication and radar surveillance caused by the Offshore Wind Farm. Such costs will be borne by the Danish Defence. Furthermore, contrary to earlier procurements rounds for offshore wind, the Concessionaire shall not pay the cost of the offshore preliminary investigations performed by Energinet, cf. section 23 (3) of the Renewable Energy Act (RE Act), statutory order no. 132 of 6 February 2024. Such costs will be borne by the Danish State. The location site of the Offshore Wind Farm is further stated below under section "Place of Performance" as well as in the procurement material Appendix 2 (Location of the Concession Area). Reference is further made to the regulation in the Procurement Specifications, Annex F (Concession Agreement), Appendix 1 (Project Specification), and the procurement material as a whole.

    • Contact

      Camilla Juel Irmarkowfprocurement@ens.dk
    • Type
      Competition
    • Location
      Nordsjælland
    • Main code
      Construction work
      45000000
    • 31121320Wind turbines31121330Wind turbine generators31121340Wind farm31160000Parts of electric motors, generators and transformers31170000Transformers31213400Distribution system31300000Insulated wire and cable45244000Marine construction works45244100Marine installations

    Similar active competitions

    • Energistyrelsen

      Elektrisk utstyr og belysning

      North Sea I, South, Offshore Wind Farm

      Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

      Competition
      Oct 23, 2028(100+ days)
      DKK 6,600,000,000
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(4 days)
      €30,442,953
    • Vestegnens Kraftvarmeselskab I/S

      Dynamisk indkøbssystem for entreprenørydelser

      Det dynamiske indkøbssystem indenfor entreprenørydelser indeholder allerede rør- og anlægsarbejder samt kundeinstallationer. Dette udbud vedrører udbud af én ekstra kategori til dette dynamiske indkøbssystem: Kategori 7: Levering og montering af muffer. Ydelserne på denne kategori omfatter eksempelvis, men ikke begrænset til: - demontering af eksisterende muffer, levering og montering af nye muffer inklusive isolering - levering, montering og dokumenteret indmåling af retableret lækagesystemet i henhold til VEKS-standarder - indhentning af alle nødvendige tilladelser, koordinering med myndigheder og bygherre eller dennes rådgiver. Det dynamiske indkøbssystem er således efter afslutningen af dette udbud opdelt i 7 kategorier: Kategori 1: Rørarbejder og anlægsarbejder, arbejder op til 4 mio. kr. Kategori 2: Rørarbejder og anlægsarbejder, arbejder over 4 mio. kr. Kategori 3: Kundeinstallationer, små installationer op til 200 kW Kategori 4: Kundeinstallationer, store installationer over 200 kW Kategori 5: Levering af fjernvarmeunits Kategori 6: Montering af fjernvarmeunits Kategori 7: Levering og montering af muffer. Udbuddet vedrører ALENE oprettelse af kategori 7. Der kan anmodes om optagelse på denne kategori 7. De øvrige kategorier (kategori 1-6) har allerede været udbudt, og der kan løbende anmodes om optagelse på disse.

      Dynamic purchasing system
      Oct 29, 2041(100+ days)