    Procurement of 132 kV Cable supply for the 400-132 kV Cable route restructuring E20 Amager motorway - 25/16717

    Energinet Eltransmission A/S

    Procurement of 132 kV Cable supply for the 400-132 kV Cable route restructuring E20 Amager motorway - 25/16717

    1. Competition notice published

      Jun 4, 10:27 AMJune 4, 2026 10:27 AM
    2. Change in competition

      Jul 1, 5:47 AMJuly 1, 2026 5:47 AM
    3. Qualification deadline

      Jul 6, 10:00 AMJuly 6, 2026 10:00 AM
    4. Tender submission deadline

      Comes with the invitation

    Brief

    Denmark: Tenders/Energinet Eltransmission A/S/Procurement of 132 kV Cable supply for the 400-132 kV Cable route restructuring E20 Amager motorway - 25/16717

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Qualification deadline
    Jul 6,Expired
    Award
    Technical Solution 20% and 2 more
    Procedure
    With negotiationTwo stages
    Agreement
    Buying goods
    Estimated value
    €1.1Mover 10 months

    Brief

    Energinet Eltransmission A/S har brug for levering af 132 kV AC jordkabler til projektet "400-132 kV Kabelvejsomlægning E20 Amagermotorvejen" nær København, Danmark. Kontrakten omfatter levering af 13,5 kilometer enkeltleder kabler (9 x 1500 m) og har en forventet værdi på 1.140.000 EUR over 10 måneder. Kablerne skal installeres af kunden, og en tredjepartsleverandør vil udføre samling, så kontrakten omhandler udelukkende levering af kabelkerner. Tildelingskriterierne er pris (55%), teknisk løsning (20%), produktions- og leveringsplan (15%) og kontraktvilkår (10%). Kvalifikationskrav inkluderer en egenkapital på mindst 380.000 EUR og en egenkapitalprocent på mindst 20% fra seneste årsrapport; hvis egenkapitalprocenten er mellem 15% og 20%, kan ansøger kvalificere sig, hvis egenkapitalen overstiger 228.000 EUR.

    Elektrisk utstyr og belysning

    Register interest

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Qualification requirements

    • Description

      Egenkapital fra siste årsregnskap må, på tidspunktet for prekvalifisering, være minst 380 000 EUR.

      Documentation Requirement

      Søkeren må bekrefte den økonomiske evnen i ESPD del IV.B med informasjon fra siste årsrapport angående egenkapital (total egenkapital inkl. aksjekapital, reserver, revaluering, tilbakeholdt overskudd etc.).

      Source

      No source found in the documents. Check the requirement against the tender documents.

    • Description

      Egenkapitalandelen fra siste årsregnskap må, på tidspunktet for prekvalifisering, være minst 20 %. Hvis egenkapitalandelen er mellom 15 % og 20 %, kan søkeren kvalifisere hvis egenkapitalen overstiger 228 000 EUR.

      Documentation Requirement

      Søkeren må bekrefte den økonomiske evnen i ESPD del IV.B med informasjon fra siste årsrapport angående egenkapitalandel (egenkapital/totale eiendeler). Dette må oppgis med to desimaler.

      Source

      No source found in the documents. Check the requirement against the tender documents.

    Award Criteria

    • Description

      Prices must be stated in Appendix 3A - Schedule of Prices (document no. 25/16717-15). Tenderers must enter prices in the specified yellow columns in both the ‘Con-tract – Total’ and ‘Price Regulation’ sheets. Prices must be stated in EUR and exclusive of VAT but inclusive of all other expenses associated with the pur-chase. When evaluating ‘Price’, the Contracting Authority will evaluate the total cost for evaluation purposes, including all prices entered in the specified yellow columns in Appendix 3A - Schedule of Prices (document no. 25/16717-15)

      Evaluation Method

      The Contracting Authority will evaluate the total cost for evaluation purposes, including all prices entered in the specified yellow columns in Appendix 3A - Schedule of Prices (document no. 25/16717-15).

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      The evaluation will be based on a description of the Technical Solution offered. The description should demonstrate the technical level of the solution, and include these elements: Description of the complete cable design, including engi-neering, design, documentation, calculations, routine and sample testing setup, and the robustness of the mechan-ical design, in accordance with Appendix 2 (132 kV cable supply – costumer's requirements, technical general requirements), Section 9.1.2 of document No. 25/16717-12 and the filled in document No. 25/16717-13 “Appen-dix 2A, Underground AC cable - handover specification - Cables” Any ambiguities, missing information or uncertainties relating to the performance or characteristics of the offered solution may have a negative effect on the ten-der evaluation. The Contracting Authority will focus on the documentation provided by the tenderer who are encouraged to submit detailed and thorough responses as the below-listed elements will be of particular importance in the evaluation: Cable design: The quality of the engineering documentation (based on design documentation, calculations, values, and state-ments), including the extent to which this provides evidence that the cable is fit for purpose according to the Technical Requirements. Further, the robustness of the solution including documentation and calculations supporting this will be favored. In this context it will be considered positive if the solution provides evidence of having very robust jackets, a high level of pulling force, and provides evidence of water-prof design.

      Evaluation Method

      The evaluation will be based on a description of the Technical Solution offered, demonstrating the technical level of the solution. Particular importance will be given to: Cable design: The quality of the engineering documentation (based on design documentation, calculations, values, and state-ments), including the extent to which this provides evidence that the cable is fit for purpose according to the Technical Requirements. The robustness of the solution including documentation and calculations supporting this will be favored. It will be considered positive if the solution provides evidence of having very robust jackets, a high level of pulling force, and provides evidence of water-prof design. Any ambiguities, missing information or uncertainties relating to the performance or characteristics of the offered solution may have a negative effect on the ten-der evaluation.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      As part of the tender, the tenderer must state the max-imum guaranteed delivery time for the delivery of cables system, calculated from contract commencement date until final delivery. As part of the tender submission, the tenderer must include a production and delivery schedule plan that outlines a robust and realistic production and delivery plan, including: • A binding guaranteed delivery date • A production and delivery schedule demonstrat-ing how production and delivery will be planned and executed Delivery and production must be completed no later than 22 June 2027. The submitted delivery time is considered guaranteed. The tenderers may, at the earliest, deliver the manufactured cables two months prior to the final delivery date, set at 22 June 2027

      Evaluation Method

      The evaluation of the sub-criterion “production and delivery schedule” will be based on the guaranteed delivery time submitted by the tenderer. If the tenderer submits a production and delivery schedule with a delivery date later than 22 June 2027, the tender will be considered non-compliant and will therefore be rejected.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For the evaluation of the sub-criteria the tenderer is allowed to propose deviations to the elements of the contract identified as competitive elements in the con-tract terms. The contract terms consist of: Contract Agreement, doc.no. 25/16717-4 Appendix 1 [General Terms and Conditions for Purchase], doc.no. 25/16717-6 Master Time Schedule, doc. no. 25/16717-16 The deviations should be enclosed in the clarification list c.f. doc.no. 25/16717-22 and be included in the spread-sheet marked “Legal clarification”. The proposed deviations should be explicit and with ex-planation as to why they are made. Contract terms listed in section 3.7.1 are mandatory parts and deviations to these are not accepted. The tendered contract must be performed based on the contract terms. The tenderer is allowed to propose explicit and well-explained deviations to the following listed competitive elements: In the Contract Agreement for 132 kV Cables Route Re-structuring E20 Amager Motorway, doc. no. 25/16717-4: • Section 4.2 in terms of:  Clauses and sub-clauses in section 4.2, which are part of the competitive el-ements for Appendix 1. • Section 5 [Contract data] in terms of:  Section 5, sub-clause 12.1 (Liquidated damages)  Section 5, sub-clause 12.1 (Maximum amount of liquidated damages)  Section 5, sub-clause 13.1 (Defects Notification Period)  Section 5, sub-clause 13.4 (Defects Notification Period for replaced and repaired parts)  Section 5, sub-clause 13.4 (Maximum Defects Notification period)  Section 5, sub-clause 14.2 (Limitation of liability) In Appendix 1 [General Terms and Conditions for Purchase], doc.no. 25/16717-6: • Clause 9 (Time of Delivery) • Clause 11 (Intellectual property rights) • Clause 12 (Late-delivery or non-delivery) • Clause 13 (Defects and remedies) • Clause 14 (Limitation of liability) • Clause 15 (Product liability towards Cus-tomer) • Clause 17 (Indemnification) • Sub-Clause 20.4 (only the daily penalty amount) • Clause 25 (Termination) • Clause 26 (Termination for convenience) Deviations to these elements will be included in the evaluation and it is noted that any deviations may lead to a reduction of the score depending on the content, clarity, and consequence of the deviation. In this regard it is explicitly noted that deviations which are intended to limit liability and shift the financial risk in favour of the tenderer will be of particular importance in the evaluation. If the tenderer has no deviations to the contract terms, the maximum score of 10 will be awarded. An overall evaluation for each lot will be made of this sub-criterion.

      Evaluation Method

      Deviations to the competitive elements of the contract terms will be included in the evaluation. Any deviations may lead to a reduction of the score depending on the content, clarity, and consequence of the deviation. Deviations intended to limit liability and shift the financial risk in favour of the tenderer will be of particular importance. If the tenderer has no deviations to the contract terms, the maximum score of 10 will be awarded.

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet Eltransmission A/S

    From the notice

    • The Contracting Authority wants to purchase 132 kV AC underground cables for the following project: “400-132 kV Cable route restructuring E20 Amager motorway” close to Copenhagen, Denmark. The amount of 132 kV AC underground cables is stated as (9 x 1500 m) 13.5 kilometres single-core cables. The 132 kV cables will be installed in the ground by the Costumer. A third-party accessory provider will perform jointing. Thereby the contract only concerns supply of cable cores. For further details regarding the purchase, reference is made to the tender documents. The value of the contract is expected to amount to EUR 1,140,000.

    • Contact

      Indkøb - Aindkob@energinet.dk
    • Type
      Competition · Prequalification
    • Main code
      High-voltage cable
      31321300
    • 31300000Insulated wire and cable31320000Power distribution cables31340000Insulated cable accessories31343000Insulated cable joints

    Similar active competitions

    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(3 days)
      €30,442,953
    • HOFOR Fjernvarme P/S

      Elektrisk utstyr og belysning

      SMC-6.2 Power Transformer and 132 kV Gas Insulated Switchgear

      HOFOR Fjernvarme P/S is procuring the design, manufacture, factory testing, delivery, site assembly, testing, commissioning and handover of power transformers and 132 kV SF₆-free gas-insulated switchgear for the Svanemøllen Energy Centre in Copenhagen. The procurement is divided into two lots: transformers, including cooling systems, accessories, documentation and training; and GIS, including local control cubicles, monitoring equipment, accessories, documentation and training. The maximum total contract value is EUR 10 million. The negotiated competition has prequalification followed by tendering and evaluation; up to four applicants per lot will be invited to tender, with negotiations expected. Lot 1 applicants must provide at least two completed references from the past five years for comparable or higher-rated power transformers, including factory acceptance testing and site commissioning support. Award criteria for each lot are price (45%), technical solution and project execution (15%), commercial and contractual terms (7.5%), and health and safety (5%).

      Competition with qualification
      Nov 27, 2026(28 days)
      €10,000,000
    • Energistyrelsen

      Elektrisk utstyr og belysning

      North Sea I, South, Offshore Wind Farm

      Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

      Competition
      Oct 23, 2028(100+ days)
      DKK 6,600,000,000