    Request for Tender for the Supply and Install of an Air Compressor Heat Recovery System at SmartPly Europe DAC ‘25

    SmartPly Europe DAC

    Request for Tender for the Supply and Install of an Air Compressor Heat Recovery System at SmartPly Europe DAC ‘25

    1. Competition notice published

      Oct 20, 12:07 PMOctober 20, 2025 12:07 PM
    2. Questions deadline

      Nov 3, 2:00 PMNovember 3, 2025 2:00 PM
    3. Tender submission deadline

      Nov 10, 2:00 PMNovember 10, 2025 2:00 PM
    4. Opening date

      Nov 10, 2:30 PMNovember 10, 2025 2:30 PM

    Brief

    Ireland: Tenders/SmartPly Europe DAC/Request for Tender for the Supply and Install of an Air Compressor Heat Recovery System at SmartPly Europe DAC ‘25

    Expired

    The competition has expired without a winner being announced.

    Brief

    Kjøle- og ventilasjonsteknologi

    SmartPly Europe DAC needs engineering services for the supply and installation of an upgraded air compressor heat recovery system at their site at Belview Port Waterford, Ireland. The project, with a maximum total value of 70,000 EUR, is expected to last 1 month and involves replacing a calorifier, installing a break tank and booster system, a heat dump system, LPHW circuit upgrades, and electrical and control installations. The purpose is to improve compressor operating conditions and provide a sustainable hot water source for the SAP cleaning process.

    About the bid

      Smartply Europe DAC are seeking suitably qualified engineering companies to supply and install an upgraded air compressor heat recovery system at our site at Belview Port Waterford. This system is to improve compressor operating conditions and provide a sustainable hot water source for the SAP cleaning process. The new system will repurpose parts of the existing pipework and buffer tanks but replace unfit components with new equipment as per the design and drawings attached. There are two existing buffer tanks in place with existing pipework. Some of the existing pipework leads over to an existing calorifier. The works includes: • Calorifier Replacement: Remove the existing 800 L stainless steel cylinder and install a new 1,200 L stainless steel calorifier (New calorifier will be purchased by Smartply and onsite for installation). Adjust existing pipework to accommodate the 200 mm taller unit, the red line below roughly the height of the new unit • Break Tank and Booster System: Supply and install a 1,000 L plastic break tank complete with ball cock above the calorifier on the well water circuit. Supply and install a Wilo Helix booster pump set to pressurise the calorifier with well water. Install two 100 L PN16 pressure vessels on this circuit. • Heat Dump System: Supply and install a heat dump system consisting of two LPHW unit heaters, a circulating pump, and associated insulated pipework and fittings adjacent to the existing buffer tanks. We plan on using this wasted heat to heat our resin. We plan on putting the two fans at a height, shown in the red box below, in the same room as the buffer tanks as this is not an Atex zone. These will reclaim waste heat to warm resin pumps and pipework. The resin is stored in a room on the opposite side of the wall shown, which may be classified as an ATEX zone. Our plan is to install the fans on the non-ATEX side of the wall and run ducting through the wall, so the warm air emerges behind the resin tanks. This heated air will then be directed toward the resin pumps and pipework in front of the tanks to keep them warm. • LPHW Circuit Upgrades: Supply and install a Grundfos twin-head pump, an air/dirt separator, and associated fittings between the existing buffer tanks and the new calorifier to ensure efficient heat transfer. • Electrical + Controls: Install the free-issued power and control panel, including all power cabling to pumps, motorised valves, and heat dump fans, as well as sensor cables and sensors as detailed on the Heat Recovery P+ID.Main features of the procedureTender Document

      Contact phone
      051 831427
      Contact email
      John.Browne@mdfosb.com
      Address
      Bellview, X91 PX75 Slieveure

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    SmartPly Europe DAC
    Title
    Request for Tender for the Supply and Install of an Air Compressor Heat Recovery System at SmartPly Europe DAC ‘25
    Type
    CompetitionPrequalification
    Main code
    71314310Heating engineering services for buildings
    Supplemental codes
    42511110Heat pumps44622100Heat-recovery equipment45232141Heating works50721000Commissioning of heating installations71334000Mechanical and electrical engineering services
    Location
    Dublin
    Estimated value
    €70,000.00
    Duration
    1 month

    Active similar competitions

    • SmartPly Europe DAC

      Veiskilt og trafikkutstyr

      Essential Upgrade Works at SmartPly Europe DAC 26

      SmartPly Europe DAC needs construction services for minor construction work packages at its manufacturing facility in Belview, Slieveure, Waterford, Ireland. The works, with a maximum total value of 400,000 EUR, are expected to be completed over approximately four months and primarily address Health and Safety, Environmental, and operational requirements across the production facility. The project is divided into four separate lots based on the nature and type of the projects.

      CompetitionOct 5, 2026
      Oct 26, 2026(16 days)
      €400,000
    • Electricity Supply Board ( ESB )

      Anleggsmaskiner og utstyr

      HEAT EFFICIENCY SYSTEMS

      Provision of Heat efficiency technology such as heat pump installations on a turnkey basis, design, fully installed and commissioned. The Contractor will be responsible for design, supply, and installation of all materials, and system commissioning including handover to the designated O and M (Operation and Maintenance) and /or Asset owner.

      Qualification systemMay 27, 2024
      Jun 24, 2027(100+ days)
    • Electricity Supply Board

      Industrimaskiner

      TR5844 - Poolbeg CCGT Auxilliary Boiler Major Replacement

      Electricity Supply Board needs boiler installations for a major replacement of its dual fuel auxiliary steam boiler, controls, and external gas skid at Poolbeg CCGT in Dublin. The project, with a duration of 12 months, involves the removal of existing plant and equipment, installation of new designed equipment, and potential modifications to building structure and civil works foundations. The design will require interfacing with electrical, gas, diesel, C and I, fire, civil, structural, ventilation, steam, and feedwater systems.

      Competition with qualificationOct 6, 2026
      Oct 9, 2026(0 days)
      €0
    • Waterford and Wexford Education and Training Board_110494

      Bridgetown College Wexford - Heating Centre Upgrade

      Waterford and Wexford Education and Training Board_110494 needs works for the decommissioning and removal of existing oil-fired boiler plant and redundant services, and the installation of new LPG-fired boiler plant and associated heating centre equipment, with associated works, at Bridgetown College Wexford. The project has a maximum total value of 290,000 EUR and a duration of 18 months. The project location is South-East Ireland.

      CompetitionSep 18, 2026
      Oct 12, 2026(2 days)
      €290,000
    • Bord na Móna PLC

      Oppføring av bygninger

      SC 07/25 - Open Cycle Gas Turbine (OCGT) and Combined Cycle Gas Turbine (CCGT) Qualification System

      Bord na Móna PLC in Ireland is establishing a Qualification System for the provision of Open Cycle Gas Turbine (OCGT) and Combined Cycle Gas Turbine (CCGT) works. This system is of indefinite duration, but is anticipated to apply for 10 years with an option to extend. The procurement covers Lot 1 – OCGT Supply OEM and LTSA, Lot 2 – OCGT Balance of Plant Constructor, Lot 3 – OCGT Engineering, Procurement and Construction (EPC) LTSA, and Lot 4 – CCGT Engineering, Procurement and Construction (EPC) + LTSA.

      Qualification systemSep 8, 2026
      Oct 6, 2029(100+ days)