Search
  • Search


Poland: Tenders/BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ/Special Module Fabrication – Structural Steel – Detail, Fabrication, and Furnish (SR/US)
  1. Questions deadline

    20. jan. kl. 11:0020. januar 2026 kl. 11:00
  2. Tender submission deadline

    3. feb. kl. 11:003. februar 2026 kl. 11:00
  3. Contract start date

    30. april kl. 22:0030. april 2026 kl. 22:00
  4. Tender validity period

    3. mai kl. 10:003. mai 2026 kl. 10:00
  5. Competition notice published

    15. juli kl. 13:4315. juli 2026 kl. 13:43

Brief

Special Module Fabrication – Structural Steel – Detail, Fabrication, and Furnish (SR/US)

Agreement
Construction work

Brief

BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs detailing, fabricating, and furnishing over 100 structural steel module assemblies for three nuclear power plants in Poland. The total weight of the structural steel modules is approximately 6000 metric tons. The modules include structural steel shapes, plates, studs, and miscellaneous items, primarily carbon steel with some duplex stainless steel. Fabrication is divided into five module categories: Floor modules (CAxx), Liner modules (CBxx), Heavy stair/platform tower framing (CHxx), Light stair modules (CSxx), and Platform modules (SPLxx). The first delivery is required by August 2029, with final delivery by July 2035.

Bygg og anlegg - Oppføring og konstruksjon av bygninger

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

From the notice

  • The scope of work for this package consists of detailing, fabricating and delivering over 100 structural steel module assemblies (based on U.S. Materials, Codes, and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP1000 Project. The total weight of the structural steel modules is approximately 2000 metric tons (MTs) per unit, or 6000 MTs total for all three units. The module designs include structural steel shapes, plates, studs, and miscellaneous items, such as grating, handrail, stairs, reinforcing steel couplers, pipe sleeves, etc. The majority of the design uses carbon steel, however there is some duplex stainless steel used in several module designs. Fabrication is divided into five module categories, all typically delivered as subassemblies for site assembly with installation by others: • CAxx (18 modules): Floor modules (up to 13m x 13m x 1.4m, 50 MT) supporting concrete slab placement. • CBxx (37 modules): Liner modules replacing formwork (one 300 MT module 45m diameter x 10m high; most modules up to 6m x 4m x 4m, 12 MT), consisting mainly of plates, studs, and stiffeners. • CHxx (14 modules): Heavy stair/platform tower framing (up to 20m x 10m x 8m, 90 MT). • CSxx (4 modules): Light stair modules with framing, handrails, and grating (up to 8m x 6m x 4m, 16 MT). • SPLxx (36 modules): Platform modules (light to heavy framing) including large mezzanine and operating decks, up to 120–160 MT. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. SCHEDULE FORECAST (SUBJECT TO CHANGE) Prequalification Submittal Deadline: September 2026 RFQ Document Issuance: January 2027 Supplier Proposal Due: March 2027 Order Award Date: July 2027 Required on Site Date: First Delivery (Unit 1): August 2029 // Final Delivery (Unit 3): July 2035 (Additional delivery schedule information will be provided in the RFQ Package)

  • Contact

    Amanda Russellarussel3@bechtel.com
  • Type
    Competition
  • Location
    Gdański
  • Main code
    Construction work
    45000000
  • 45223210Structural steelworks45223821Prefabricated units45251111Construction work for nuclear reactors

Similar active competitions

  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    CWS Circulating Water Pumps (Concrete Volute)

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, furnishing of materials, fabrication, testing, and delivery of nine vertical concrete volute pumps for three nuclear power plants in Poland. These pumps will circulate brackish Baltic Sea water to cool main condensers, with each pump having a rated flow of 21.3 m3/s, a pump head of 22.5m, and a design life of 60 years. The project requires physical model testing and shop performance testing. The required onsite date for Unit 1 is June 2032.

    Competition
  • Bechtel Polska Sp. z o. o.

    Anleggs- og infrastrukturbygging

    Civil Construction and General Support Services

    1. Experienced and Qualified General Construction Contractors are invited to provide general construction and site support services at the project location for the Poland Nuclear Power Plant. The General Contractor shall be responsible for completing all aspects of the scope of work including, but not limited to, providing all necessary tools, equipment, labor, supervision, professional services, materials, consumables, and supplies in order to complete the following works: • Site grading for exploratory locations, maintaining surface water drainage paths, providing stable working platforms for rigs and equipment, providing and maintaining all on-site access paths for movement of drill rigs and support vehicles until the completion of field work; • Completing initial and as-built survey of investigation locations; • Backfilling the completed subsurface investigation points with cement/bentonite/grout, disposal of drill cuttings and fluids; • Maintaining the project compound (including janitorial services) and other facilities (including repairs) to ensure they remain operational, and providing additional facilities (if necessary); • Responsible for all waste disposal including general construction materials and office generated waste; • Providing support services for Subsurface Investigations activities such as: supply of fresh and potable water, supply of fuel, delivery of materials from the warehouse, relocation, reinstallation, decommissioning, repairs and maintenance of site and rig facilities; • Providing occupational health and medical services on site, including staffing licensed medical personnel, providing occupational medical care, and managing emergency care with evacuation capabilities. Responsibilities include establishing and managing a mobile fully licensed medical facility in Poland, supplying necessary pharmaceuticals and medical equipment, maintaining an electronic medical records system compliant with Polish privacy laws, and conducting drug and alcohol testing per site policies. Also providing emergency response vehicles, a mobile first aid clinic with advanced life support capabilities, and staff with advanced trauma and occupational health training. • Provide a comprehensive Health, Safety and Environmental Programme for site-wide geotechnical investigation work, including plans, procedures, training and qualified safety personnel. The detailed scope of work will be outlined in the specifications, scope documents, and other contractual materials provided to the Subcontractor within the Request of Quotation.

    Qualification system
    23. juli 2028(100+ days)
  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Bygg og anlegg - Grunnarbeid, vann og kloakk

    Circulating Water System Intake Equipment Package

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, material, fabrication, testing, and delivery of a complete and fully operational Circulating Water System Intake Equipment Package. This includes 24 automatic dual flow type traveling water screens, 33 trash racks, 6 motorized trash rack raking systems, 2 intake tunnel stop gates, and 9 circulating water pump suction stop gates. The traveling screens must be designed for continuous, submerged service in brackish Baltic seawater at a depth of 23m, with material selection considering stagnation, biofouling, mussel formation, and frazil ice formation. The equipment is required on site by July 2032 for Unit 1, with details for Units 2 and 3 to follow.

    Competition