Search
  • Search


Poland: Tenders/BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ/Circulating Water System Intake Equipment Package
  1. Questions deadline

    Jan 20, 11:00 AMJanuary 20, 2026 11:00 AM
  2. Tender submission deadline

    Feb 3, 11:00 AMFebruary 3, 2026 11:00 AM
  3. Contract start date

    Apr 30, 10:00 PMApril 30, 2026 10:00 PM
  4. Tender validity period

    May 3, 10:00 AMMay 3, 2026 10:00 AM
  5. Competition notice published

    Jul 15, 7:02 PMJuly 15, 2026 7:02 PM

Brief

Circulating Water System Intake Equipment Package

Agreement
Construction work

Brief

BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, material, fabrication, testing, and delivery of a complete and fully operational Circulating Water System Intake Equipment Package. This includes 24 automatic dual flow type traveling water screens, 33 trash racks, 6 motorized trash rack raking systems, 2 intake tunnel stop gates, and 9 circulating water pump suction stop gates. The traveling screens must be designed for continuous, submerged service in brackish Baltic seawater at a depth of 23m, with material selection considering stagnation, biofouling, mussel formation, and frazil ice formation. The equipment is required on site by July 2032 for Unit 1, with details for Units 2 and 3 to follow.

Bygg og anlegg - Grunnarbeid, vann og kloakk

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

From the notice

  • The scope of work for this package consists of, but is not limited to, designing, furnishing material, fabricating, testing, and delivering complete and fully operational equipment, detailed as: a. Twenty-four (24) automatic dual flow type traveling water screens b. Thirty-three (33) trash racks c. Six (6) motorized trash rack raking systems with associated monorail and support d. structures. Two (2) raking systems per unit where each rake covers six (6) or five (5) trash racks e. Two (2) intake tunnel stop gates (1 per tunnel). Nine (9) circulating water pump suction stop gates. The traveling screens shall be designed for continuous, submerged service in brackish Baltic seawater to support a cooling water intake structure with a depth of 23m. Design conditions for Baltic Sea chloride concentration will be considered and specified further in the RFQ Package. There shall be material selection consideration to exposure conditions such as stagnation, biofouling, mussel formation, and frazil ice formation. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual quantities and dimension numbers will be included in official bid package. Deadline (Pre-qualification Submittal): August 2026 (Forecast – Subject to change); RFQ Document Issuance: November 2026 (Forecast – Subject to change); Supplier Proposals Due: January 2027 (Forecast – Subject to change); Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required On Site Date: Unit 1: July 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package. Additional delivery schedule information will be provided in the RFQ Package

  • Contact

    Julie Mertzjlwest@bechtel.com
  • Type
    Competition
  • Location
    Gdański
  • Main code
    Construction work
    45000000
  • 44212391Sluice gates45248000Construction work for hydro-mechanical structures45252210Water purification plant construction work

Similar active competitions

  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    CWS Circulating Water Pumps (Concrete Volute)

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, furnishing of materials, fabrication, testing, and delivery of nine vertical concrete volute pumps for three nuclear power plants in Poland. These pumps will circulate brackish Baltic Sea water to cool main condensers, with each pump having a rated flow of 21.3 m3/s, a pump head of 22.5m, and a design life of 60 years. The project requires physical model testing and shop performance testing. The required onsite date for Unit 1 is June 2032.

    Competition
  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    Special Module Fabrication – Structural Steel – Detail, Fabrication, and Furnish (SR/US)

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs detailing, fabricating, and furnishing over 100 structural steel module assemblies for three nuclear power plants in Poland. The total weight of the structural steel modules is approximately 6000 metric tons. The modules include structural steel shapes, plates, studs, and miscellaneous items, primarily carbon steel with some duplex stainless steel. Fabrication is divided into five module categories: Floor modules (CAxx), Liner modules (CBxx), Heavy stair/platform tower framing (CHxx), Light stair modules (CSxx), and Platform modules (SPLxx). The first delivery is required by August 2029, with final delivery by July 2035.

    Competition
  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Anleggsmaskiner og utstyr

    Circulating Water Pumps (Concrete Volute)

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, furnishing of materials, fabrication, testing, and delivery of nine vertical concrete volute pumps (based on European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The pumps, which will circulate brackish Baltic Sea water to remove heat from main condensers, must have a rated flow of 21.3 m3/s, a pump head of 22.5m, and a design life of 60 years. The project requires physical model testing and shop performance testing on the pumps.

    Competition