Search
  • Search


Poland: Tenders/Bechtel Polska Sp. z o. o./Structural Backfill - Supply and Delivery - Poland AP 1000 Project
  1. Qualification deadline

    Not stated
  2. Tender submission deadline

    Comes with the invitation
  3. Contract start date

    Nov 13, 2025 12:00 AMNovember 13, 2025 12:00 AM
  4. Competition notice published

    Nov 13, 2025 12:46 PMNovember 13, 2025 12:46 PM
  5. Express interest deadline

    Dec 4, 2025 11:00 PMDecember 4, 2025 11:00 PM
  6. Contract end date

    Dec 5, 2025 12:00 AMDecember 5, 2025 12:00 AM

Brief

Structural Backfill - Supply and Delivery - Poland AP 1000 Project

Published deadline passed

The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

Qualification deadline
Dec 5, 2025Expired
Procedure
With negotiationTwo stages
Agreement
Buying goodsuntil Dec 2025

Brief

1. Experienced and qualified company, capable of supplying and delivering structural backfill material to the project location for the Poland Nuclear Power Plant. The company responsible for the execution of the agreement shall provide material of high quality, previously tested, and approved by qualified Bechtel specialists, and verified to ensure full compliance with the project specifications, contractual requirements, nuclear quality, and all applicable standards. All activities shall be performed in accordance with the approved procedures and under the supervision and quality control requirements defined for the project. The company shall ensure timely delivery and full documentation of all supplied materials. The detailed scope of work will be outlined in the specifications, scope documents, and other contractual materials provided to the company. The company shall ensure the availability of transport and logistics to safely and timely deliver the full quantity of materials specified in the Scope of Work. Interested companies must register / update their company's information in Bechtel's iSupplier portal at https://supplier.becpsn.com. If company has any questions and/or chooses to express interest in bidding this scope, the interested company shall notify Bechtel’s contact person Weronika Krawanska at email (wkrawans@bechtel.com). Please reference commodity description Structural Backfill and commodity code CE01. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire, via Bechtel’s iSupplier portal and request the company to sign a Non-Disclosure agreement, where the interested party would complete the forms and issue the completed documents for Bechtel review and evaluation. Bechtel notes that previous proven experience in the supply and delivery of structural backfill materials of similar scale and complexity is preferred, and additional documentation / evidence may be required. Additional documentation / evidence of capability, and capacity to self-perform key elements of the scope will be required. 2. The prequalification criteria shall be included in the prequalification questionnaire. Examples thereof include demonstration of: (i) experience in end-to-end structural backfill material qualification and supply, including sourcing, testing, logistics, and past performance; (ii) compliance to ISO 9001 certification or a quality program that is comparable to ISO 9001 (to be approved by Bechtel and Owner); (iii) compliance to certification of legally mandatory requirements; (iv) financial standing (solvency), and (v) organizational capabilities. 3. In the event of high competitiveness of the proceedings (a large number of companies expressing interest), Bechtel reserves the right to conduct a preliminary preselection of companies for further proceedings, which demonstrate the greatest potential for performing the scope of work. 4. Upon Bechtel’s evaluation of the response to the Poland Prequalification Questionnaire (PQQ), Bechtel will notify each company whether it fully meets, conditionally meets, or does not meet the prequalification requirements. Submission of a Prequalification Questionnaire does not automatically qualify a company as prequalified. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: a. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or b. economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. 5. Companies meeting the prequalification criteria and who have executed the project Non-Disclosure Agreement (NDA) will be invited to submit proposals for supply and delivery of the Structural Backfill. A company must execute the project NDA prior to receiving the Request for Quotation (RFQ) package. 6. The RFQ shall include the award criteria, scope of work, specifications, drawings, datasheets, terms and conditions, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. 7. The RFQ document shall include a detailed scope, requiring prospective suppliers to submit their offers strictly in accordance with all technical requirements specified therein. **Due to the significant volume of materials required, the amount of required structural backfill may be acquired from multiple suppliers. 8. Proposals shall be provided in one of the following currencies: EURO, PLN, USD. Furthermore, the proposals will be requested as Fixed unit rates. 9. Award criteria shall be based on lowest evaluated price, technically acceptable with consideration of the following key criteria, which will determine the final decision for award, and will be detailed further in the Bid Document(s) during the RFQ phase. The bidder must demonstrate their capability and capacity to self-perform each of the key criteria relevant to the scope of work for this package: • Minimum 5 Years Previous Proven Relevant Experience • Technical Capability • Quality Program Execution • Schedule Compliance 10. Any Companies that do not meet the legally mandatory compliance requirements will be excluded. 11. The procedure for the company to gain access to classified information, as required, will be subject to compliance with the executed NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFQ document. Deadline (Pre-qualification Submittal): 05-Dec-25 RFQ Document Issuance: November 2026 (Forecast date – subject to change) Supplier Proposals Due: January 2027 (Forecast date – subject to change) Order Award Date: March 2027 (Forecast date – subject to change) Final Delivery Date December 2030 (Forecast date – subject to change) Updates: None Soft Cop

Register interest

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Bechtel Polska Sp. z o. o.

From the notice

  • 1. Experienced and qualified company, capable of supplying and delivering structural backfill material to the project location for the Poland Nuclear Power Plant. The company responsible for the execution of the agreement shall provide material of high quality, previously tested, and approved by qualified Bechtel specialists, and verified to ensure full compliance with the project specifications, contractual requirements, nuclear quality, and all applicable standards. All activities shall be performed in accordance with the approved procedures and under the supervision and quality control requirements defined for the project. The company shall ensure timely delivery and full documentation of all supplied materials. The detailed scope of work will be outlined in the specifications, scope documents, and other contractual materials provided to the company. The company shall ensure the availability of transport and logistics to safely and timely deliver the full quantity of materials specified in the Scope of Work. Interested companies must register / update their company's information in Bechtel's iSupplier portal at https://supplier.becpsn.com. If company has any questions and/or chooses to express interest in bidding this scope, the interested company shall notify Bechtel’s contact person Weronika Krawanska at email (wkrawans@bechtel.com). Please reference commodity description Structural Backfill and commodity code CE01. At that point, Bechtel shall provide the interested party the Poland Prequalification Questionnaire, via Bechtel’s iSupplier portal and request the company to sign a Non-Disclosure agreement, where the interested party would complete the forms and issue the completed documents for Bechtel review and evaluation. Bechtel notes that previous proven experience in the supply and delivery of structural backfill materials of similar scale and complexity is preferred, and additional documentation / evidence may be required. Additional documentation / evidence of capability, and capacity to self-perform key elements of the scope will be required. 2. The prequalification criteria shall be included in the prequalification questionnaire. Examples thereof include demonstration of: (i) experience in end-to-end structural backfill material qualification and supply, including sourcing, testing, logistics, and past performance; (ii) compliance to ISO 9001 certification or a quality program that is comparable to ISO 9001 (to be approved by Bechtel and Owner); (iii) compliance to certification of legally mandatory requirements; (iv) financial standing (solvency), and (v) organizational capabilities. 3. In the event of high competitiveness of the proceedings (a large number of companies expressing interest), Bechtel reserves the right to conduct a preliminary preselection of companies for further proceedings, which demonstrate the greatest potential for performing the scope of work. 4. Upon Bechtel’s evaluation of the response to the Poland Prequalification Questionnaire (PQQ), Bechtel will notify each company whether it fully meets, conditionally meets, or does not meet the prequalification requirements. Submission of a Prequalification Questionnaire does not automatically qualify a company as prequalified. Bechtel reserves the right to exclude any of the following from this Competitive Bidding process: a. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or b. economic operators who rely in the Competitive Bidding process on capacities of any entities from countries not covered by the GPA with the EU. Such decision of Bechtel shall not be subject to complaint. 5. Companies meeting the prequalification criteria and who have executed the project Non-Disclosure Agreement (NDA) will be invited to submit proposals for supply and delivery of the Structural Backfill. A company must execute the project NDA prior to receiving the Request for Quotation (RFQ) package. 6. The RFQ shall include the award criteria, scope of work, specifications, drawings, datasheets, terms and conditions, and schedule data. The RFQ shall be issued via Bechtel’s Digital Supply Chain System automation tool. 7. The RFQ document shall include a detailed scope, requiring prospective suppliers to submit their offers strictly in accordance with all technical requirements specified therein. **Due to the significant volume of materials required, the amount of required structural backfill may be acquired from multiple suppliers. 8. Proposals shall be provided in one of the following currencies: EURO, PLN, USD. Furthermore, the proposals will be requested as Fixed unit rates. 9. Award criteria shall be based on lowest evaluated price, technically acceptable with consideration of the following key criteria, which will determine the final decision for award, and will be detailed further in the Bid Document(s) during the RFQ phase. The bidder must demonstrate their capability and capacity to self-perform each of the key criteria relevant to the scope of work for this package: • Minimum 5 Years Previous Proven Relevant Experience • Technical Capability • Quality Program Execution • Schedule Compliance 10. Any Companies that do not meet the legally mandatory compliance requirements will be excluded. 11. The procedure for the company to gain access to classified information, as required, will be subject to compliance with the executed NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFQ document. Deadline (Pre-qualification Submittal): 05-Dec-25 RFQ Document Issuance: November 2026 (Forecast date – subject to change) Supplier Proposals Due: January 2027 (Forecast date – subject to change) Order Award Date: March 2027 (Forecast date – subject to change) Final Delivery Date December 2030 (Forecast date – subject to change) Updates: None Soft Cop

  • Contact

    wkrawans@bechtel.com
  • Type
    Competition · Prequalification
  • Location
    Gdański
  • Main code
    Related mining and quarrying products
    14500000
  • 14000000Mining, basic metals and related products

Similar active competitions

  • Bechtel Polska Sp. z o. o.

    Anleggs- og infrastrukturbygging

    Civil Construction and General Support Services

    1. Experienced and Qualified General Construction Contractors are invited to provide general construction and site support services at the project location for the Poland Nuclear Power Plant. The General Contractor shall be responsible for completing all aspects of the scope of work including, but not limited to, providing all necessary tools, equipment, labor, supervision, professional services, materials, consumables, and supplies in order to complete the following works: • Site grading for exploratory locations, maintaining surface water drainage paths, providing stable working platforms for rigs and equipment, providing and maintaining all on-site access paths for movement of drill rigs and support vehicles until the completion of field work; • Completing initial and as-built survey of investigation locations; • Backfilling the completed subsurface investigation points with cement/bentonite/grout, disposal of drill cuttings and fluids; • Maintaining the project compound (including janitorial services) and other facilities (including repairs) to ensure they remain operational, and providing additional facilities (if necessary); • Responsible for all waste disposal including general construction materials and office generated waste; • Providing support services for Subsurface Investigations activities such as: supply of fresh and potable water, supply of fuel, delivery of materials from the warehouse, relocation, reinstallation, decommissioning, repairs and maintenance of site and rig facilities; • Providing occupational health and medical services on site, including staffing licensed medical personnel, providing occupational medical care, and managing emergency care with evacuation capabilities. Responsibilities include establishing and managing a mobile fully licensed medical facility in Poland, supplying necessary pharmaceuticals and medical equipment, maintaining an electronic medical records system compliant with Polish privacy laws, and conducting drug and alcohol testing per site policies. Also providing emergency response vehicles, a mobile first aid clinic with advanced life support capabilities, and staff with advanced trauma and occupational health training. • Provide a comprehensive Health, Safety and Environmental Programme for site-wide geotechnical investigation work, including plans, procedures, training and qualified safety personnel. The detailed scope of work will be outlined in the specifications, scope documents, and other contractual materials provided to the Subcontractor within the Request of Quotation.

    Qualification system
    Jul 23, 2028(100+ days)
  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Bygg og anlegg - Oppføring og konstruksjon av bygninger

    Special Module Fabrication – Structural Steel – Detail, Fabrication, and Furnish (SR/US)

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs detailing, fabricating, and furnishing over 100 structural steel module assemblies for three nuclear power plants in Poland. The total weight of the structural steel modules is approximately 6000 metric tons. The modules include structural steel shapes, plates, studs, and miscellaneous items, primarily carbon steel with some duplex stainless steel. Fabrication is divided into five module categories: Floor modules (CAxx), Liner modules (CBxx), Heavy stair/platform tower framing (CHxx), Light stair modules (CSxx), and Platform modules (SPLxx). The first delivery is required by August 2029, with final delivery by July 2035.

    Competition
  • BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ

    Bygg og anlegg - Oppføring, renovering og vedlikehold av bygninger

    CWS Circulating Water Pumps (Concrete Volute)

    BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ needs the design, furnishing of materials, fabrication, testing, and delivery of nine vertical concrete volute pumps for three nuclear power plants in Poland. These pumps will circulate brackish Baltic Sea water to cool main condensers, with each pump having a rated flow of 21.3 m3/s, a pump head of 22.5m, and a design life of 60 years. The project requires physical model testing and shop performance testing. The required onsite date for Unit 1 is June 2032.

    Competition