Supervision Services for the Construction of new railway section from Kriva Palanka to the border of the Republic of Bulgaria, as part of Corridor VIII
Published deadline passed
The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.
Rådgivende ingeniørtjenester for bygg og anlegg
Public Enterprise for Railway Infrastructure Railways of Republic of North Macedonia -Skopje (ZRSMI) needs supervision services for the construction of a new railway section from Kriva Palanka to the border of the Republic of Bulgaria, as part of Corridor VIII, for a duration of 84 months. The services involve supervision for the construction of a single-track electrified railway line from Kriva Palanka to the cross-border tunnel (Phase 3), signalling and telecommunication for Phase 3, and electrification of the line from Kumanovo to the border with the Republic of Bulgaria (Phase 1, 2 and 3). The consultant will act as the "FIDIC Engineer" and provide supervision services in accordance with Macedonian legislation. Candidates must provide a trade licence or professional registration, have a minimum of 50 permanent staff in linear transport infrastructure (railways, road, and/or metro) for each of the last three years (or 25 for the lead partner in a JV/consortium specifically in railways), and possess a professional licence/certificate for construction supervision services.
About the bid
- Contact phone
- +389 2 3227 903
- Contact email
- phase3@mzi.mk
- Address
- Zeleznicka 50b, 1000 Skopje
The Corridor VIII is a key component of the European transport system and the segment of the Railway Corridor VIII traversing the Republic of North Macedonia has a missing link leading to the Republic of Bulgaria. It is structured in three sections: (i) Kumanovo to Beljakovce (Phase 1, 30.8 km) currently in DLP, (ii) Beljakovce to Kriva Palanka (Phase 2, 34 km) presently under construction and Kriva Palanka to Deve Bair (Phase 3, 22.1 km) - this segment leads towards up to the cross-border tunnel with Republic of Bulgaria. This procurement notice refers particularly for the section “Construction of new railway section from Kriva Palanka to the cross-border tunnel with Republic of Bulgaria”. The objective of the assignment is supervision for construction of a single-track electrified railway line from Kriva Palanka to the cross-border tunnel (Phase 3), signalling and telecommunication for Phase 3, as well as electrification of the line from Kumanovo to the border with the Republic of Bulgaria (Phase 1, 2 and 3). The consultant will carry out the duties of the Engineer as governed by the Conditions of Contract for Construction for Plant and Design – Build (FIDIC Yellow Book, 1999), provision of the supervision services in the capacity of the “FIDIC Engineer” and supervision as stipulated by Macedonian legislation. The supervision will counsel the Client on managing the contracts with due diligence, ensuring all obligations specified in the Project's Financing documents, including loan, grant and project agreements, as well as the respective service contract and terms of reference (ToR) are adequately addressed and fulfilled.
Custom Assessment Criteria
Start a free trial to ask your own questions about the tender and get AI-generated answers.
Award Criteria
Found no award criteria in the contract notice.
Qualification requirements
Description
The candidates shall provide a trade licence or professional registers in their Country of Establishment.
Documentation Requirement
Not specified.
Description
The minimum total permanent staff number employed by the candidate in the field of linear transport infrastructure (railways, road and/or metro) (civil, mechanical and electrical engineers employed as designers and supervisors) must be at least fifty (50) for each of the last three (3) years preceding the submission deadline. In case of a JV/consortium, the minimum total permanent staff number employed by the lead partner, in the field of railways (civil, mechanical and electrical engineers employed as designers and supervisors), must be at least twenty-five (25) for the each of the last three (3) years preceding the submission deadline.
Documentation Requirement
Not specified.
Description
The candidate (each sole applicant or in case of a joint venture/consortium each member of the joint venture/consortium) shall have a professional licence/certificate (or equivalent), in accordance with the laws of the country in which it is established, for the provision of construction supervision services.
Documentation Requirement
Not specified.
Description
The candidate has not had imposed a legally valid court decision for participation in criminal organization, corruption, fraud or money laundering in the last 5 years.
Documentation Requirement
Signed declaration establishing proof of personal standing. In the next phase of this procedure, certificates issued by the authorized institutions, confirming the listed requirements will be mandatory.
Description
A bankruptcy procedure has not been initiated.
Documentation Requirement
Signed declaration establishing proof of personal standing. In the next phase of this procedure, certificates issued by the authorized institutions, confirming the listed requirements will be mandatory.
Description
A liquidation procedure has not been initiated.
Documentation Requirement
Signed declaration establishing proof of personal standing. In the next phase of this procedure, certificates issued by the authorized institutions, confirming the listed requirements will be mandatory.
Description
The applicant is registered for paid taxes, contributions and other public duties.
Documentation Requirement
Signed declaration establishing proof of personal standing. In the next phase of this procedure, certificates issued by the authorized institutions, confirming the listed requirements will be mandatory.
Description
A secondary sentence prohibition on participation in open call procedures, awarding public procurement contracts and contracts for public private partnership, has not been imposed by the Register of sentences for committed crimes of legal entities.
Documentation Requirement
Signed declaration establishing proof of personal standing. In the next phase of this procedure, certificates issued by the authorized institutions, confirming the listed requirements will be mandatory.
Description
A secondary sentence temporary or permanent prohibition for committed crimes of legal entities on performing a certain activity, has not been imposed.
Documentation Requirement
Signed declaration establishing proof of personal standing. In the next phase of this procedure, certificates issued by the authorized institutions, confirming the listed requirements will be mandatory.
Description
A misdemeanour sanction resulting in prohibition for practicing a profession, performing activity or duty, i.e. temporary prohibition for performing a particular activity, has not been imposed by a legally valid court decision.
Documentation Requirement
Signed declaration establishing proof of personal standing. In the next phase of this procedure, certificates issued by the authorized institutions, confirming the listed requirements will be mandatory.
Previous Contract Winners
Start a free trial to see who has won similar tenders for this buyer.
See the full notice
- Contracting authority
- Public Enterprise for Railway Infrastructure Railways of the Republic of North Macedonia – Skopje (ZRSMI)
- Title
- Supervision Services for the Construction of new railway section from Kriva Palanka to the border of the Republic of Bulgaria, as part of Corridor VIII
- Type
- Main code
- Supplemental codes
- Duration
- 84 months
No supplemental codes from buyer…