    Tender for contract on subsidy for carbon capture, transport and Storage

    Energistyrelsen

    Tender for contract on subsidy for carbon capture, transport and Storage

    1. Supplier selection

      May 5, 12:00 AMMay 5, 2026 12:00 AM
    2. Result notice published

      May 5, 5:04 AMMay 5, 2026 5:04 AM

    Brief

    Denmark: Tenders/Energistyrelsen/Tender for contract on subsidy for carbon capture, transport and Storage

    Published deadline passed

    The published deadline has passed. For multi-stage competitions a later tender deadline may still apply — check the notice or portal for the current phase.

    Qualification deadline
    May 4,Expired
    Procedure
    Without prior noticeTwo stages
    Agreement
    Buying services

    Brief

    The Danish Energy Agency has entered into an agreement with Aalborg Portland A/S for the delivery of services related to carbon capture, transport, and storage in Copenhagen. The contract, which covers the period from 2029 to 2044, has a total maximum available subsidy of 28,659,200,000 Danish kroner (2025-prices, including VAT and potential derived tax losses). The purpose of the contract is to achieve CO2 emission reductions and/or negative CO2 emissions to contribute to Denmark's climate targets.

    Miljøovervåking og naturvitenskapelige tjenester

    Result

    TED
    • Aalborg Portland A/S
      Winner
    • Number of bids
      0
    • Contract value
      Not stated

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energistyrelsen

    From the notice

    • With the agreement on a strengthened framework for CCS in Denmark (in Danish: “Aftale om styrkede rammevilkår for CCS i Danmark”) of 20 September 2023, a majority of the Danish Parliament decided to merge the second phase of the CCUS fund and the GSR fund into one combined fund, the “CCS Fund”. In June 2024, a political decision was made to deploy the CCS Fund through one single competitive bidding process. The purpose of the CCS Fund is to achieve CO2 emission reductions and/or negative emissions by Storing Fossil CO2 and /or Biogenic CO2 or Atmospheric CO2. The overarching aim of the CCS Fund is thus to contribute to the realization of Denmark's climate targets as outlined in the Danish Climate Act (in Danish: “Klimaloven”). By contract notice no. 604064-2024 published 8 October 2024 the Danish Energy Agency (the DEA) launched the tender for the deployment of the CCS Fund according to which the DEA wishes to enter into one or more contract(s) pursuant to which the recipient(s) of the subsidies (each recipient “the Operator”) shall ensure and be responsible for achieving the CO2 emission reductions and/or negative CO2 emissions (“the Contract”). The total maximum available subsidy of the CCS Fund is DKK 28,659,200,000 (2025-prices, including VAT and including potential derived tax losses (in Danish “afledt afgiftstab”)) covering the period from (and including) 2029 to (and including) 2044. Reference is made to the contract notice for further info on the procedure and Contract(s), including the value of the Contract(s). The granting of subsidy under the CCS Fund is encompassed by the European Commission’s Guidelines on State aid for climate, environmental protection and energy 2022. The designation of the Contract(s) as a service contract in the contract notice etc. does not change this. The competitive bidding process is conducted as a negotiated procedure in accordance with the rules and principles of section II of the Danish Public Procurement Act. The DEA notified the CCS Fund to the European Commission as an aid scheme in accordance with the procedure prescribed by Article 108 of Treaty on the Function of the European Union (TFEU), and the DEA has received the European Commission’s approval of the aid scheme. In May 2025 the DEA prequalified 10 tenderers to submit first indicative offers (“INDO”) (see https://ens.dk/presse/disse-10-selskaber-skal-konkurrere-om-milliardpulje-til-fange-og-lagre-co2). In June 2025 the DEA made some amendments to the tender documents (primarily corrections, restructuring, spelling errors and clarifications) and released the revised tender documents to the tenderers. In October 2025 the DEA conducted negotiations with the tenderers regarding the tender documents and the INDO’s in accordance with the procedure. Based on communications with the European Commission, negotiations and comments from the tenderers, the DEA made changes and clarifications to the tender documents, see further description below. The DEA released the revised tender documents to the tenderers on 14 November 2025 in the electronic tendering system while requesting a best and final offer (“BAFO”) from the tenderers. The DEA made the revised tender documents publicly available with track changes on the DEA’s website (see https://ens.dk/forsyning-og-forbrug/ccs-fangst-og-lagring-af-co2/ccs-udbud-og-anden-stoette-til-udvikling-af-ccs), see the tab “Udbud af CCS-puljen”. On 19 November 2025 the DEA published voluntary ex ante transparency notice no. 765513-2025 with the wish to promote transparency regarding the process and changes and clarifications made to the tender documents. At that time no decision had been made concerning the award of contract. This notice is sent in continuation of notice no. 765513-2025 as the DEA has now made its decision concerning the award of contract. As stated in notice no. 765513-2025 the changes of the tender documents include e.g. a reduction of the penalty level and the termination fee (corresponding to a 50% reduction compared to the initial tender documents) (Appendix 5, clause 14, and Contract, clause 20.5.3) and the corresponding reduction of the amount of the Liability Cap and Performance and Warranty Guarantee (Contract, clauses 13 and 21.4 and Appendix 11), introduction of a penalty threshold of 90% of the Annual Quantity (Appendix 5, clause 14.2), changes regarding exemptions for non-performance (Appendix 5, clause 14.2), change regarding the time limit for the DEA’s termination due to postponement of the Commercial Operation Date (Contract, clause 10.2), change regarding the level of non-performance with the Annual Quantity is a material breach (Contract clause 20.5.2), changes regarding the Operator’s termination for convenience (Contract, clause 24.2), change in relation to fixed expiry date for the Performance and Warranty Guarantee (Contract clause 13.11), changes regarding force majeure (Contract, clause 23), and change from quarterly to monthly payment of subsidies (Appendix 5). Further as stated the clarifications include e.g. the clause regarding Sub-Suppliers (Contract, clause 5), circumstances for postponement of the Commercial Operation Date (Contract, clause 10.2), the DEA’s termination due to postponement of the Commercial Operation Date and material breach (Contract, clauses 10.2.6-10.2.9 and 20.5.3-20.5.4), changes in the Operator’s project (Contract, clause 11), Intellectual Property Rights (clause 12), General Requirements in Appendix 3, the declaration of intent to provide a performance and warranty guarantee (Appendix G), and the content of the Project Description, Project Schedule, Authority Approval Plan and Risk Management Plan (Tender specifications, clause 13.1.4). After notice no 765513-2025 was published the DEA extended the time limit for submission of the BAFO and made a few clarifications to the Tender specifications, Contract and Appendix 5. These revised documents are also publicly available on the DEA’s website.

    • Contact

      The Danish Energy Agency - Tina SchønTNSN@ens.dk
    • Type
      Result · Prequalification
    • Location
      Byen København
    • Main code
      Environmental services
      90700000

    Similar active competitions

    • Gas Storage Denmark A/S

      Rådgivende ingeniørtjenester for bygg og anlegg

      Combined Service for Methane Emissions Measurements and Reporting Basis - 26/15049

      Gas Storage Denmark A/S needs methane-emissions measurement and reporting services for its two underground natural-gas storage facilities in Denmark, located in West and South Zealand and North Jutland, with a maximum total contract value of DKK 2.8 million. The services must support measurement, quantification, monitoring, reporting and verification under the EU Methane Regulation. Tenders are evaluated on price (60%), relevant references (20%) and organization (20%); bidders must provide two comparable references, particularly assignments involving methane measurement and quantification, facility operations and reporting for executive or political decision-making. The proposed team should include qualified and available personnel for each work package, with clear responsibilities, backup capacity and plans for continuity and collaboration with Energinet.

      Competition
      Nov 11, 2026(13 days)
      DKK 2,800,000
    • Aalborg Universitet

      Laboratorie-, optisk- og presisjonsutstyr

      C-Tech test facility for Aalborg University (Esbjerg)

      Aalborg Universitet needs a C-Tech test facility for its Carbon Transformation & Energy Control Hub (C-TECH) project in Esbjerg, Sydjylland, with a maximum total value of 19,000,000 DKK. The facility should be a modular pilot and demonstration facility for carbon capture, utilization, and storage (CCUS) and Power to X (PtX) technologies, consisting of an integrated setup of four 20-foot containers housing electrolysis (hydrogen production), CO2 capture, methanol synthesis, and a supply container. The project aims to accelerate the development and demonstration of CCUS and Power to X technologies, contribute to competence development, and foster collaboration with industry partners. Tenders will be evaluated based on price (40%) and quality (60%).

      Competition
      Jan 7, 2027(70 days)
      DKK 19,000,000
    • Dinel A/S

      Elektrisitet og energiforvaltning

      Indkøb af VE-certifikater svarende til nettab 2026

      Dinel A/S needs to purchase and cancel guarantees of origin for renewable energy (VE-certifikater) corresponding to grid loss for the year 2026, with a maximum total value of 575,000 DKK. The procurement is a joint tender with TREFOR Elnet A/S and TREFOR Elnet Øst A/S, covering the regions of Østjylland, Sydjylland, and Bornholm. The contract will be awarded to the tenderer(s) with the lowest price per kWh, with price being 100% of the award criteria.

      Competition
      Nov 2, 2026(4 days)
      DKK 575,000