Search
  • Search


Ireland: Tenders/Electricity Supply Board ( ESB )/TR4114 - Poolbeg Overhaul 2027
  1. Supplier selection

    Apr 21, 12:00 AMApril 21, 2026 12:00 AM
  2. Contract signed

    May 14, 12:00 AMMay 14, 2026 12:00 AM
  3. Result notice published

    Jul 15, 7:34 AMJuly 15, 2026 7:34 AM

Brief

TR4114 - Poolbeg Overhaul 2027

Awarded

The competition has ended and a winner has been selected.

Procedure
Without prior noticeTwo stages
Agreement
Construction work
Estimated value
€0

Brief

Electricity Supply Board (ESB) has entered into an agreement with Siemens Energy Ltd for overhaul and renovation works at Poolbeg. The contract was awarded based on the most economically advantageous tender, and only one bid was received.

Result

TED
  • Siemens Energy Ltd
    Winner
  • Number of bids
    1
  • Contract value
    €0

Custom Assessment Criteria

  • Get answers to your bid/no-bid criteria

    Set them up once and Cobrief answers them in every tender

Will you bid?

The agent sets up the bid and writes the first draft. Free for 14 days.

Award Criteria

  • Description

    Most Economically Advantageous Tender

    Source

    No source found in the documents. Check the weight against the tender documents.

Previous winners

  • Who are you up against?

    The suppliers who have won similar contracts at Electricity Supply Board ( ESB )

From the notice

  • TR4114 - Poolbeg Execution Contract 2027

  • Contact

    esprocurement@esb.ie
  • Type
    Result · Prequalification
  • Location
    Dublin
  • Main code
    Overhaul and refurbishment work
    45453000
  • 51130000Installation services of steam generators, turbines, compressors and burners

Similar active competitions

  • Electricity Supply Board ( ESB )

    Kraftforsyning og reservestrøm

    TR2575 Turbine Decommissioning

    Decommissioning wind farms and additional services for turbine resale in the wind turbine market. ESB will be carrying out wind farm decommissioning projects in the next number of years.

    Qualification system
    Feb 10, 2028(100+ days)
  • Electricity Supply Board ( ESB )

    Elektroinstallasjon i bygninger

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

    Qualification system
    May 30, 2027(100+ days)
  • Electricity Supply Board ( ESB )

    Reparasjon og vedlikehold

    TR4196 ESB Poolbeg Heat Recovery Steam Generator Stack (HRSG) Works.

    Electricity Supply Board (ESB) needs works for the TR4196 ESB Poolbeg Heat Recovery Steam Generator Stack (HRSG) in Dublin. The project involves either a complete turnkey contract to replace two HRSG Stacks, including removal of existing stacks, full design of replacements, site installation, and commissioning of new mechanical rain dampers, or, at ESB's discretion, a contract to remove outer cladding and insulation and apply preservation paint coating to the exposed metal surface of both HRSG stacks (from 26.4m to 75.0m above ground).

    Qualification system
    Sep 4, 2028(100+ days)