    CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

    Bord na Móna PLC

    CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

    1. Contract start date

      Apr 13, 12:00 AMApril 13, 2026 12:00 AM
    2. Result notice published

      May 12, 11:48 AMMay 12, 2026 11:48 AM
    3. Contract end date

      Nov 27, 12:00 AMNovember 27, 2027 12:00 AM

    Brief

    Ireland: Tenders/Bord na Móna PLC/CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Elektroinstallasjon i bygninger

    Bord na Móna PLC has entered into an agreement with HandMV Engineering Ltd_98445 for the design, procurement, installation, and commissioning of electrical engineering works for the Oweninny Windfarm Phase 3 in Ireland. This includes the Oweninny 110 kV IPP/TSO Substation, a contestably built 110 kV grid connection, and all necessary design studies, commissioning, and testing to meet EirGrid Grid Code Requirements. Three bids were received for this contract.

    Result

    Winner
    HandMV Engineering Ltd_98445
    Number of bids
    3
    Contract value
    €0

    About the bid

      In summary, the works comprise of the design, procurement, installation and commissioning of the electrical engineering works in relation to Oweninny Phase 3 wind farm including: (a) Oweninny 110 kV IPP/TSO Substation (b) Contestably built 110 kV grid connection (c) All required design studies, commissioning and testing to ensure the works, delivered as part of this specification, meet the EirGrid Grid Code Requirements. The full project technical specification (the “Employer’s Requirements”) is set out in the documents folder on eTenders and is titled “Schedule 1 Employers Requirements”.

      Contact phone
      +35345439000
      Contact email
      renewablesprocurement@bnm.ie
      Address
      Main Street, W12 XR59 Newbridge

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

      Found no award criteria in the contract notice.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Bord na Móna PLC
    Title
    CM 01/25 - Electrical Balance of Plant Works for Oweninny Windfarm Phase 3
    Type
    ResultPrequalification
    Main code
    45310000Electrical installation work
    Supplemental codes
    31210000Electrical apparatus for switching or protecting electrical circuits31220000Electrical circuit components31221000Electrical relays31681300Electrical circuits31681400Electrical components31711150Electrical capacitors32572100Communications cable with multiple electrical conductors45315100Electrical engineering installation works45317200Electrical installation work of transformers45317300Electrical installation work of electrical distribution apparatus50532400Repair and maintenance services of electrical distribution equipment50710000Repair and maintenance services of electrical and mechanical building installations50711000Repair and maintenance services of electrical building installations51100000Installation services of electrical and mechanical equipment65320000Operation of electrical installations71314100Electrical services71321000Engineering design services for mechanical and electrical installations for buildings71323100Electrical power systems design services71334000Mechanical and electrical engineering services
    Location
    Dublin
    Estimated value
    €0.00

    Active similar competitions

    • Bord na Móna PLC

      Elektroinstallasjon i bygninger

      CM 06/24 - Electrical Balance of Plant Qualification System

      EBoP panel creation for all upcoming grid projects. QQD to included the following Lots – Lot 1-110 KV, Lot 2 - 220 KV and Lot 3 - 400 KV.

      Qualification systemAug 29, 2024
      Sep 26, 2027(100+ days)
    • Bord na Móna PLC

      Oppføring av bygninger

      AP 06/25 - Civil Balance of Plant and Civil Engineering Works for Renewable Energy Projects Qualification System

      The objective of this Qualification System is to qualify interested parties for the provision of Civil Balance of Plant and Civil Engineering Enabling Works for Renewable Energy Projects. The Qualification System is of indefinite duration. However, it is currently anticipated that the Qualification System will apply for a period of 10 years from the date of its establishment with the option to extend at the Contracting Entity’s discretion (having regard to the nature, scope and extent of services required to be undertaken). For the purposes of submitting initial Applications, Applicants must complete and return all documentation relating to their Application by the stated Application Deadline. Applicants submitting Applications will be informed at the earliest opportunity of the status of their Application. Applicants may apply for inclusion on the Qualification System at any time over the term of this arrangement. The Contracting Entity will review and evaluate Applications received after the establishment of the Qualification System on a six monthly basis.

      Qualification systemAug 9, 2024
      Sep 6, 2027(100+ days)
    • Electricity Supply Board ( ESB )

      Elektrisk infrastruktur og veibelysning

      TR2929, Electrical Balance of Plant (EBOP) of Long Duration Energy Storage (LDES) Technology in the Republic of Ireland and Northern Ireland.

      Typically, the scope of work for this procurement process shall include the design, procurement, installation and commissioning of the following non-exhaustive list, however tenderers should note that the detailed scope for each project will be determined at the Request for Tender (RfT) stage: A.1.1.2 Civil Scope: Additionally, the Contracting Entity may also procure civil works as part of this procurement process as may be required on a project-by-project basis and will be confirmed at Request for Tender (RfT) stage. The scope of work from this may include some or all of the design, procurement and installation of the following;

      Qualification systemDec 16, 2024
      Jan 13, 2028(100+ days)
    • Bord na Móna PLC

      Oppføring av bygninger

      SC 07/25 - Open Cycle Gas Turbine (OCGT) and Combined Cycle Gas Turbine (CCGT) Qualification System

      Bord na Móna PLC in Ireland is establishing a Qualification System for the provision of Open Cycle Gas Turbine (OCGT) and Combined Cycle Gas Turbine (CCGT) works. This system is of indefinite duration, but is anticipated to apply for 10 years with an option to extend. The procurement covers Lot 1 – OCGT Supply OEM and LTSA, Lot 2 – OCGT Balance of Plant Constructor, Lot 3 – OCGT Engineering, Procurement and Construction (EPC) LTSA, and Lot 4 – CCGT Engineering, Procurement and Construction (EPC) + LTSA.

      Qualification systemSep 8, 2026
      Oct 6, 2029(100+ days)
    • Electricity Supply Board ( ESB )

      Elektroinstallasjon i bygninger

      Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

      Works Associated with the Design and Build of High Voltage Electrical Substations in the Republic of Ireland

      Qualification systemMay 2, 2024
      May 30, 2027(100+ days)