Search
  • Search


    Framework agreement for instrument transformers for 145 kV, 170 kV, 245 kV and 420 kV

    Energinet Eltransmission A/S

    Framework agreement for instrument transformers for 145 kV, 170 kV, 245 kV and 420 kV

    1. Contract signed

      May 12, 12:00 AMMay 12, 2026 12:00 AM
    2. Result notice published

      Jun 19, 5:32 AMJune 19, 2026 5:32 AM
    3. Change in result

      Jun 22, 11:14 AMJune 22, 2026 11:14 AM

    Brief

    Denmark: Tenders/Energinet Eltransmission A/S/Framework agreement for instrument transformers for 145 kV, 170 kV, 245 kV and 420 kV

    Awarded

    The competition has ended and a winner has been selected.

    Qualification deadline
    Jun 21,Expired
    Award
    Delivery time 25% and 1 more
    Procedure
    With negotiationTwo stages
    Agreement
    Framework agreement
    Estimated value
    €102Mover 8 years

    Brief

    Energinet Eltransmission A/S har indgået en rammeaftale med ELECTROTECNICA ARTECHE HERMANOS S.L. om levering af instrumenttransformere til 145 kV, 170 kV, 245 kV og 420 kV i Sydjylland. Aftalen har en varighed på 8 år og en maksimal totalværdi på 101.998.102 EUR. Ved tildelingen blev der lagt vægt på pris (60%), leveringstid (25%) og kontraktvilkår (15%). Der deltog 3 leverandører i konkurrencen.

    Result

    TED
    • ELECTROTECNICA ARTECHE HERMANOS S.L.
      Winner
    • Number of bids
      3
    • Contract value
      Not stated
    • Maximum framework agreement valueUp to €101,998,102

    Custom Assessment Criteria

    • Get answers to your bid/no-bid criteria

      Set them up once and Cobrief answers them in every tender

    Will you bid?

    The agent sets up the bid and writes the first draft. Free for 14 days.

    Award Criteria

    • Description

      Prices must be stated in the attached Commercial tender list, cf. doc. 25/17895-28 (Lot specific sheets), for each lot for which the tenderer is prequalified. The defined price elements for all lots for which the tenderer is prequalified must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase (including taxes). Prices must be stated in Euro. When evaluating 'Price' Energinet will include the price for each lot individually, cf. the sheets in Commercial tender list, cf. doc. 25/17895-28. The total price per lot is calculated for evaluation purpose only.

      Evaluation Method

      When evaluating 'Price' Energinet will include the price for each lot individually, cf. the sheets in Commercial tender list, cf. doc. 25/17895-28. The total price per lot is calculated for evaluation purpose only.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For each lot under the framework agreement, the tenderer must specify guaranteed delivery times for all components listed in the respective sheets in the document Commercial tender list, cf. doc. 25/17895-28. Delivery times must be stated in calendar days, measured from the Contracting Authority’s order to the final delivery at the designated delivery location. The delivery times must be entered in the relevant sheets in Appendix 3 – Commercial tender list, cf. doc. 25/17895-28. If delivery times vary between components within a lot, the evaluation will be based on the longest guaranteed delivery time stated for that lot. Incomplete delivery time information will be considered non compliant. The sub criterion “Delivery Time” will be evaluated per lot.

      Evaluation Method

      For each lot, the score will be based on the longest guaranteed delivery time stated for any component within that lot.

      Scoring Model:

      Lots 1 and 3:

      • A delivery time of 240 calendar days results in a score of 10.
      • A delivery time of 420 calendar days results in a score of 0.
      • Intermediate delivery times will be evaluated using linear interpolation.
      • Delivery times exceeding 540 calendar days will not be accepted and will render the tender for the affected lot non compliant, cf. section 2.7.1 of the tender conditions.

      Lot 2:

      • A delivery time of 240 calendar days results in a score of 10.
      • A delivery time of 600 calendar days results in a score of 0.
      • Intermediate delivery times will be evaluated using linear interpolation.
      • Delivery times exceeding 720 calendar days will not be accepted and will render the tender for the affected lot non compliant, cf. section 2.7.1 of the tender conditions.

      Source

      No source found in the documents. Check the weight against the tender documents.

    • Description

      For the evaluation of the sub-criteria the following should be enclosed: If the tenderer includes a list of proposed deviations to the attached contractual terms: Agreement under Framework Agreement (doc. no. 25/17895-34/35/36), Appendix 1: General Terms and Conditions for Purchase (doc. no. 25/17895-37) the tenderer must use the Clarification List (doc. no. 25/17895-6). Tenderer must make it clear whether deviations applies to a specific lot or to all lots. The proposed deviations to the contractual terms must be stated in the spreadsheet marked “Legal clarification” and should be explicit and with explanation as to why they are made. The tendered assignment must be performed based on the attached contract terms.

      Evaluation Method

      The tenderer may suggest explicit and well-explained deviations to the contractual terms which the Contracting Authority has identified as competitive criteria below:

      • Appendix 1: General Terms and Conditions for Purchase (doc. 25/17895-37) and, where relevant, same Clauses and Sub-Clauses in the Agreement under the Framework Agreement (doc. no. 25/17895-34/35/36):

        • Clause 9 (Time of Delivery)
        • Clause 11 (Intellectual property rights)
        • Clause 12 (Late-delivery or non-delivery)
        • Clause 13 (Defects and remedies)
        • Clause 14 (Limitation of liability)
        • Clause 15 (Product liability)
        • Clause 16 (Insurance)
        • Clause 17 (Indemnification)
        • Clause 18 (Performance guarantee) *
        • Sub-Clause 20.3 (HSE requirements)
        • Clause 25 (Termination)
      • However, the following remain requirements regarding the performance guarantee:

        • A performance guarantee must be issued if the Contract Price equals or exceeds 2,000,000.00 EUR.
        • The performance guarantee must be an on-demand guarantee issued by a financial institution or other authorised guarantor with a minimum rating of the investment grade level at BBB- (Standard&Poors or Fitch) or Baa3 (Moody’s).
        • The wording in the performance guarantee template regarding Disputes and Applicable law

      Deviations to the clauses listed above will be included in the evaluation of the sub-criterion "Contract terms" and it is noted that any deviations may lead to a reduction to the score depending on the content, clarity, and consequence. In this regard it is explicitly noted that deviations which are intended to limit liability and shift the financial risk in favor of the tenderer will be of particular importance in the evaluation. No deviations, and therefore absolute fulfillment of the contract terms, will result in the maximum score of 10. An overall evaluation will be made of this sub-criterion. A minimum score of 4 must be achieved, cf. sub-section 3.7.1

      Source

      No source found in the documents. Check the weight against the tender documents.

    Previous winners

    • Who are you up against?

      The suppliers who have won similar contracts at Energinet Eltransmission A/S

    From the notice

    • Framework agreement for instrument transformers for 145 kV, 170 kV, 245 kV and 420 kV

    • Contact

      Procurement - Bprocurement@energinet.dk
    • Type
      Result · Framework agreement · Prequalification
    • Location
      Sydjylland
    • Main code
      Instrument transformer
      31173000

    Similar active competitions

    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualification
      Nov 2, 2026(4 days)
      €30,442,953
    • Energinet

      Bank- og finansformidlingstjenester

      Rammeaftale på økonomikonsulenter - 26/17294

      Energinet søger økonomikonsulenter til en rammeaftale med en løbetid på 4 år, der kan forlænges med 2+2 år, hvilket giver en potentiel samlet varighed på 8 år. Den forventede samlede værdi af rammeaftalen er 64.000.000 DKK, med en maksimal totalværdi på 80.000.000 DKK. Ydelsen omfatter løbende økonomisk assistance, primært til Energinet Koncernens Shared Service Center, økonomifunktion med drifts- og anlægscontrolling og -analyse, samt ad-hoc opgaver i moderselskabet og datterselskaber. Der er krav om en egenkapital på minimum 8.000.000 DKK fra seneste årsregnskab, og ansøgere skal indsende op til 3 betydeligste sammenlignelige referencer udført inden for de seneste 3 år, der vedrører økonomisk assistance. Tildelingskriterierne vægtes som pris (35%), kompetencer (55%) og kontraktvilkår (10%).

      Framework agreement with qualification
      Nov 5, 2026(7 days)
      DKK 80,000,000
    • Udbuddet.dk

      Elektrisk infrastruktur og veibelysning

      Transformerstation til Kalundborg Forsyning, Udvidelse af Renseanlæg (F1.EL.01)

      Udbuddet.dk søger en hovedentreprenør til levering og installation af en ny transformerstation, herunder ny elforsyning, komplet teknikhus, hovedfordelingstavle og jordingsanlæg, til Kalundborg Central Renseanlæg i Vest- og Sydsjælland. Projektet er en del af en udvidelse af renseanlægget og har en estimeret maksimal totalværdi på 6,4 millioner DKK. Tilbud evalueres ud fra pris (60%), organisation og samarbejde (30%), samt miljø, bæredygtighed, sikkerhed og sundhed (10%). Kvalifikationskrav inkluderer en egenkapital på mindst 5.000.000 DKK og en soliditetsgrad på minimum 20% i det senest afsluttede regnskabsår, samt mindst én reference inden for de seneste fem år med en kontraktværdi på minimum 2.000.000 DKK, der omfatter levering og opsætning af transformerstation og hovedfordelingstavler på et renseanlæg eller lignende teknisk anlæg.

      Competition
      Oct 28, 2026(0 days)
      DKK 6,400,000