Search
  • Search


    Variable Shunt Reactors for outdoor installation for SLF02

    Energinet Eltransmission A/S

    Variable Shunt Reactors for outdoor installation for SLF02

    1. Contract start date

      Jun 8, 12:00 AMJune 8, 2026 12:00 AM
    2. Contract signed

      Jun 8, 12:00 AMJune 8, 2026 12:00 AM
    3. Result notice published

      Aug 7, 9:58 AMAugust 7, 2026 9:58 AM
    4. Contract end date

      Jan 31, 2031 12:00 AMJanuary 31, 2031 12:00 AM

    Brief

    Denmark: Tenders/Energinet Eltransmission A/S/Variable Shunt Reactors for outdoor installation for SLF02

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Elektrisk infrastruktur og veibelysning

    Energinet Eltransmission A/S har indgået en aftale med BALIKESIR ELECTROMECHANIC CORP. om levering af fire variable shuntreaktorer til udendørs installation ved transformerstationen Idom-lund. Reaktorerne skal have en nominel spænding på 235 kV, en effekt på 60-120 Mvar med en reguleringsområde på 50% eller derover, og skal være af typen onload (OLTC) med ONAN-køling. Det maksimale lydeffektniveau er 80 dB(A), og korrosionsbeskyttelsen skal være C5VH eller højere. Den maksimale driftsspænding er 245 kV ved 50 Hz, og kortslutningsniveauet er 40kA. Den magnetiske karakteristik skal være lineær op til 1,5 gange nominel spænding. Den samlede værdi af aftalen er 19.802.724 €.

    Result

    Winner
    BALIKESIR ELECTROMECHANIC CORP.
    Number of bids
    4
    Contract value
    €19,802,724

    About the bid

      Delivery of four (4) variable Shunt Reactor for outdoor installation at substation Idom-lund: Rated voltage Ur: 235 kV Power rating: 60-120 Mvar Regulation Range: 50 % or above Type of regulation: onload (OLTC) Cooling: ONAN Maximum sound power level: 80 dB(A), preferably lower, (at max. operating voltage 245 kV) Corrosion Protection: C5VH or above Max. operating voltage Umax: 245 kV Frequency: 50 Hz Short circuit level 40kA Magnetic characteristic: The core must be linear up to 1.5 times rated voltage.

      Contact name
      Procurement - B
      Contact phone
      +45 70102244
      Contact email
      procurement@energinet.dk
      Address
      Tonne Kjærsvej 65, 7000 Fredericia

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      Prices must be stated in Appendix 3: Price List doc. no. 25/12714-29 and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. When evaluating 'Price', the Contracting Authority will evaluate the total cost cf. the Appendix 3: Price lists 25/12714-29. The evaluation of prices is based on “Total price” in EUR from row 17&18 and column G in sheet “Total Eval price. Prices must be stated in EUR.

      Evaluation Method

      The evaluation of prices is based on “Total price” in EUR from row 17&18 and column G in sheet “Total Eval price.

    • Description

      For the evaluation of the sub-criteria the below should be enclosed: - Technical solution description including design, components, processes, tools to be used etc., based on the requirements described in o Appendix 2A: Technical Specifications 63 kA, doc. no. 25/12714-24 and o Appendix 2A: Technical Specifications 80 kA, doc. no. 25/12714--25 - Completed data lists o Appendix 2A: Data list 63 kA, doc. no. 25/12714-26 o Appendix 2A: Data list 80 kA, doc. no. 25/12714-27 - Preliminary technical drawings. Please note that sound level is evaluated as a separate sub criterion. The evaluation of “Technical Solution” will be based on the solution description and supporting documents. Considering the scope and content of the tendered contract the Contracting Authority will focus on to what extend the submitted ensures delivery of high performing, well designed and robust transformers. In this context, the elements listed below are of particular importance: • General design - the overall technical solution for the transformer design, including dimensions and accessibility. • Core type • Weight and Size, taking into consideration how this will affect the requirements for the foundations and stations • Oil type (cf. 2. Main data) • Corrosion protection (cf. 5.4 Paint and surface treatment) • FAT- and SAT-procedure (cf. 6.5 Factory Acceptance Tests and Site Acceptance tests) Bushings (cf. 7. High-voltage connections and Bushings) • Tap changer and variation range (cf. 8. Tap Changer) • Cooling Method (cf. 9.1 Cooling method and Design). It will impact the evaluation positively to the extend the technical solution including supporting documents are detailed, thorough and precise. An overall evaluation will be made of this sub-criterion.

      Evaluation Method

      The evaluation of “Technical Solution” will be based on the solution description and supporting documents. Considering the scope and content of the tendered contract the Contracting Authority will focus on to what extend the submitted ensures delivery of high performing, well designed and robust transformers. In this context, the elements listed below are of particular importance:

      • General design - the overall technical solution for the transformer design, including dimensions and accessibility.
      • Core type
      • Weight and Size, taking into consideration how this will affect the requirements for the foundations and stations
      • Oil type (cf. 2. Main data)
      • Corrosion protection (cf. 5.4 Paint and surface treatment)
      • FAT- and SAT-procedure (cf. 6.5 Factory Acceptance Tests and Site Acceptance tests) Bushings (cf. 7. High-voltage connections and Bushings)
      • Tap changer and variation range (cf. 8. Tap Changer)
      • Cooling Method (cf. 9.1 Cooling method and Design)
        It will impact the evaluation positively to the extend the technical solution including supporting documents are detailed, thorough and precise. An overall evaluation will be made of this sub-criterion.
    • Description

      The evaluation will be based on a detailed and specific technical solution for the sound level cf. Section 11. “Sound Level” in Appendix 2A: Technical Specifications 63kA, doc. no. 25/12714-24 and Appendix 2A: Technical Specifications 80kA, doc. no. 25/12714-25. The Solution should include: - Chosen methods, - Processes and tools for guaranteed sound power level. The evaluation of the tendered transformers sound level is performed in 3 steps: Step 1): a. If the guaranteed sound power level is higher than the maximum value accepted, the solution will be rejected as the minimum technical requirement is not fulfilled. b. If the guaranteed sound power level is equal to or lower than the maximum value accepted, the sound level is within an acceptable range - the score is preliminary set to a value of 5 (five), and the evaluation continues to step 2. Step 2): a. If NO external sound damping method is used to obtain the guaranteed value, the evaluation continues to step 3. b. If ANY external sound damping method is used to obtain the guaranteed value, the preliminary grade is reduced depending on the extent of the applied sound damping method: i. If Sound Panels (e.g., sandwich panels) are used, 3 (three) points will be deducted. ii. If Sound Screen is used, 3 (three) points will be deducted. iii. If Sound Housing is used, 5 (five) points will be deducted. (See note *) below for further description and definition of sound damping methods.) After the preliminary grade is reduced, the evaluation continues to step 3. Step 3): a. If sound power level is EQUAL TO the maximum value accepted by the Contracting Authority, the obtained preliminary score is the result of the evaluation. b. If sound power level is LOWER than the maximum value accepted by the Contracting Authority, the final score is obtained by adding 1 (one) point to the preliminary score for every dB the guaranteed sound power level is lower than the required maximum value. The final score cannot exceed the value 10 (ten), so no extra credit will be given for sound levels more than 10 dB lower than the maximum value. *) Note Definition of type of sound damping method (Step 2b i-iii). i. Sound Panels are panels attached directly to the tank wall, only partly covering one or more sides of the tank (e.g., sandwich panels). ii. Sound Screen is attached to the tank usually covering one or more complete sides. Typically, a screen is also installed with some centimetre distance between tank and screen, so valves, jacking points etc. must be accessed through hatches in the sound screen. iii. Sound Housing is an enclosure which surrounds the main tank, and it includes a roof. A sound house typically requires a separate or specially designed foundation.

      Evaluation Method

      The evaluation of the tendered transformers sound level is performed in 3 steps:

      Step 1:
      a. If the guaranteed sound power level is higher than the maximum value accepted, the solution will be rejected as the minimum technical requirement is not fulfilled.
      b. If the guaranteed sound power level is equal to or lower than the maximum value accepted, the sound level is within an acceptable range - the score is preliminary set to a value of 5 (five), and the evaluation continues to step 2.

      Step 2:
      a. If NO external sound damping method is used to obtain the guaranteed value, the evaluation continues to step 3.
      b. If ANY external sound damping method is used to obtain the guaranteed value, the preliminary grade is reduced depending on the extent of the applied sound damping method:
      i. If Sound Panels (e.g., sandwich panels) are used, 3 (three) points will be deducted.
      ii. If Sound Screen is used, 3 (three) points will be deducted.
      iii. If Sound Housing is used, 5 (five) points will be deducted.
      After the preliminary grade is reduced, the evaluation continues to step 3.

      Step 3:
      a. If sound power level is EQUAL TO the maximum value accepted by the Contracting Authority, the obtained preliminary score is the result of the evaluation.
      b. If sound power level is LOWER than the maximum value accepted by the Contracting Authority, the final score is obtained by adding 1 (one) point to the preliminary score for every dB the guaranteed sound power level is lower than the required maximum value. The final score cannot exceed the value 10 (ten), so no extra credit will be given for sound levels more than 10 dB lower than the maximum value.

      Definition of type of sound damping method (Step 2b i-iii):
      i. Sound Panels: Panels attached directly to the tank wall, only partly covering one or more sides of the tank (e.g., sandwich panels).
      ii. Sound Screen: Attached to the tank usually covering one or more complete sides. Typically, a screen is also installed with some centimetre distance between tank and screen, so valves, jacking points etc. must be accessed through hatches in the sound screen.
      iii. Sound Housing: An enclosure which surrounds the main tank, and it includes a roof. A sound house typically requires a separate or specially designed foundation.

    • Description

      For the evaluation of the sub-criteria the tenderer is allowed to propose deviations to the elements of the contract identified as competitive elements in the contract terms: • Contract Agreement (doc. no. 25/12714-16), • Appendix 1: General Terms and Conditions for Purchase (doc. no. 25/12714-17), • Appendix 4 Time and Payment Schedule, (doc. no. 25/12714-30) The deviations should be enclosed in the clarification list c.f. doc. no. 25/12714-15 and be included in the spreadsheet marked “Legal clarification”. The proposed deviations should be explicit and with explanation as to why they are made. Contract terms listed in section 2.7.1 are mandatory parts and deviations to these are not accepted. The tendered assignment must be performed on the basis of the attached contract terms. The tenderer is allowed to propose explicit and well-explained deviations to the listed competitive elements and the evaluation of “contract terms” will be based on the deviations. It should be noted that any deviation might impact the score as this is dependent on the content, clarity and consequence of the deviation. The following elements are considered competitive elements: • Appendix 1: General Terms and Conditions for Purchase and, where relevant, same Clauses and Sub-Clauses in the Contract Agreements: o Sub-clause 4.6 (Advance payment guarantee – except for what is stated as mandatory parts of the Tender Documents, cf. Sub-Section 2.7.1 above) o Clause 9 (Time of Delivery) o Clause 11 (Intellectual property rights) o Clause 12 (Late-delivery or non-delivery) o Clause 13 (Defects and remedies) o Clause 14 (Limitation of liability) o Clause 15 (Product liability towards Customer) o Clause 16 (Insurance) o Clause 17 (Indemnification) o Clause 18 (Performance guarantee – except for what is stated as mandatory parts of the Tender Documents, cf. sub-section 2.7.1 above) o Sub-Clause 20.4 (only the daily penalty amount) o Clause 25 (Termination) o Clause 26 (Termination for convenience) • Appendix 4: Time and Payment Schedule Deviations to these elements will be included in the evaluation and it is noted that any deviations may lead to a reduction of the score depending on the content, clarity, and consequence of the deviation. In this regard it is explicitly noted that deviations which are intended to limit liability and shift the financial risk in favor of the tenderer will be of particular importance in the evaluation. If the tenderer has no deviations to the contract terms, the maximum score of 10 will be awarded. An overall evaluation will be made of this sub-criterion. Please note that a minimum score of 4 must be achieved for the tender to be compliant, cf. sub-section 2.7.1.

      Evaluation Method

      The tenderer is allowed to propose explicit and well-explained deviations to the listed competitive elements and the evaluation of “contract terms” will be based on the deviations. It should be noted that any deviation might impact the score as this is dependent on the content, clarity and consequence of the deviation.

      The following elements are considered competitive elements:

      • Appendix 1: General Terms and Conditions for Purchase and, where relevant, same Clauses and Sub-Clauses in the Contract Agreements:
        • Sub-clause 4.6 (Advance payment guarantee – except for what is stated as mandatory parts of the Tender Documents, cf. Sub-Section 2.7.1 above)
        • Clause 9 (Time of Delivery)
        • Clause 11 (Intellectual property rights)
        • Clause 12 (Late-delivery or non-delivery)
        • Clause 13 (Defects and remedies)
        • Clause 14 (Limitation of liability)
        • Clause 15 (Product liability towards Customer)
        • Clause 16 (Insurance)
        • Clause 17 (Indemnification)
        • Clause 18 (Performance guarantee – except for what is stated as mandatory parts of the Tender Documents, cf. sub-section 2.7.1 above)
        • Sub-Clause 20.4 (only the daily penalty amount)
        • Clause 25 (Termination)
        • Clause 26 (Termination for convenience)
      • Appendix 4: Time and Payment Schedule

      Deviations to these elements will be included in the evaluation and it is noted that any deviations may lead to a reduction of the score depending on the content, clarity, and consequence of the deviation. In this regard it is explicitly noted that deviations which are intended to limit liability and shift the financial risk in favor of the tenderer will be of particular importance in the evaluation. If the tenderer has no deviations to the contract terms, the maximum score of 10 will be awarded. An overall evaluation will be made of this sub-criterion. Please note that a minimum score of 4 must be achieved for the tender to be compliant, cf. sub-section 2.7.1.

    Qualification requirements

      Found no qualification requirements in the contract notice.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Energinet Eltransmission A/S
    Title
    Variable Shunt Reactors for outdoor installation for SLF02
    Type
    ResultPrequalification
    Main code
    31170000Transformers
    Supplemental codes
    31000000Electrical machinery, apparatus, equipment and consumables; lighting

    Active similar competitions

    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification systemNov 18, 2025
      Dec 16, 2028(100+ days)
    • ovag Netz GmbH

      Lieferung von Verteilnetztransformatoren MS/NS

      Die ovag Netz GmbH benötigt die Lieferung von Verteilnetztransformatoren MS/NS, aufgeteilt in drei Lose, für die Jahre 2027 und 2028. Die Vergabe erfolgt nach den Kriterien Preis (26,3158% und 28,9474%), Lieferzeit (13,1579% und 10,5263%), technische Daten (5,2632%) und kommerzielle Bedingungen (7,8947% und 7,8947%). Für die Qualifikation sind Erklärungen zu einem zertifizierten Umweltmanagementsystem (z.B. DIN EN ISO 14001), einem zertifizierten Energiemanagementsystem (z.B. DIN EN ISO 50001) und einem zertifizierten Qualitätsmanagementsystem (z.B. DIN EN ISO 9001) für die Fertigungsstätte(n) erforderlich, sowie eine Erklärung zur Bereitschaft, eine risikogerechte Berufs- oder Betriebshaftpflichtversicherung abzuschließen, die Sach-/Vermögensschäden sowie Personenschäden mindestens in Höhe des doppelten Auftragswertes abdeckt.

      Competition with qualificationSep 29, 2026
      Oct 29, 2026(0 days)
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualificationOct 2, 2026
      Nov 2, 2026(4 days)
      €30,442,953
    • Udbuddet.dk

      Elektrisk infrastruktur og veibelysning

      Transformerstation til Kalundborg Forsyning, Udvidelse af Renseanlæg (F1.EL.01)

      Udbuddet.dk søger en hovedentreprenør til levering og installation af en ny transformerstation, herunder ny elforsyning, komplet teknikhus, hovedfordelingstavle og jordingsanlæg, til Kalundborg Central Renseanlæg i Vest- og Sydsjælland. Projektet er en del af en udvidelse af renseanlægget og har en estimeret maksimal totalværdi på 6,4 millioner DKK. Tilbud evalueres ud fra pris (60%), organisation og samarbejde (30%), samt miljø, bæredygtighed, sikkerhed og sundhed (10%). Kvalifikationskrav inkluderer en egenkapital på mindst 5.000.000 DKK og en soliditetsgrad på minimum 20% i det senest afsluttede regnskabsår, samt mindst én reference inden for de seneste fem år med en kontraktværdi på minimum 2.000.000 DKK, der omfatter levering og opsætning af transformerstation og hovedfordelingstavler på et renseanlæg eller lignende teknisk anlæg.

      CompetitionSep 17, 2026
      Oct 28, 2026(0 days)
      DKK 6,400,000
    • Københavns Lufthavne A/S

      1100-07982 Tender for currency exchange

      Københavns Lufthavne A/S needs currency exchange services for 4 units at Copenhagen Airport, with a maximum total contract value of 1.8 billion Danish kroner. The objective is to establish a commercially sustainable and customer-focused business model that reflects changing passenger needs and payment trends. The award criteria are Price (80%), which includes concession fee (50%) and minimum annual rent (50%), and Quality (20%), which includes concept (50%) and business plan (50%). Suppliers must provide at least two references for comparable currency exchange services at airports handling over 10 million passengers annually, with references relating to contracts carried out within the last two years or ongoing contracts performed for at least twelve months.

      Competition with qualificationOct 2, 2026
      Nov 2, 2026(4 days)
      DKK 1,800,000,000