    Cable Burial and Protection to Konti-Skan Connect

    Energinet Eltransmission A/S

    Cable Burial and Protection to Konti-Skan Connect

    1. Competition notice published

      Nov 26, 2025 1:09 PMNovember 26, 2025 1:09 PM
    2. Contract signed

      Apr 15, 12:00 AMApril 15, 2026 12:00 AM
    3. Result notice published

      Apr 24, 11:09 AMApril 24, 2026 11:09 AM

    Brief

    Denmark: Tenders/Energinet Eltransmission A/S/Cable Burial and Protection to Konti-Skan Connect

    Awarded

    The competition has ended and a winner has been selected.

    Brief

    Miljøovervåking og naturvitenskapelige tjenester

    Energinet Eltransmission A/S has entered into an agreement with Primo Marine The Netherlands B.V. for the delivery of engineering services to support the development of a comprehensive cable protection strategy for the Konti-Skan Connect HVDC Interconnector project. The services, which include evaluating seabed conditions, human activity, geotechnical risks, and a Security by Design assessment addressing Hybrid Warfare at Sea, will be delivered in Denmark and Sweden over a duration of 9 years, with an expected value of 500,000 EUR. The contract has a final value of 460,853 EUR. Specific requirements included expertise in subsea cable threat analysis, risk analysis, geoscience, subsea cable installation methods, and utility crossing design. Three bids were received for this contract.

    Result

    Winner
    Primo Marine The Netherlands B.V.
    Number of bids
    3
    Contract value
    €460,853

    About the bid

      As part of the current project development phase, Energinet and Svenska kraftnät (the Clients) are jointly undertaking the Konti-Skan Connect HVDC Interconnector project to renew and modernize the electricity transmission link between Denmark and Sweden. The Consultant is requested to provide engineering services that support the development of a comprehensive cable protection strategy. This includes evaluating seabed conditions, human activity (e.g., anchoring, fishing), and geotechnical risks to ensure the cables are safeguarded against foreseeable hazards throughout their operational lifespan. In addition, the Consultant shall incorporate a Security by Design assessment as a complementary layer to the Cable Protection and Burial Study, specifically addressing risks related to Hybrid Warfare at Sea. This assessment should enhance the overall protection strategy by ensuring resilience against emerging and unconventional threats beyond conventional activity risks. The tender is divided into the following: • Work Package A – Part One – Preliminary Risk Based Cable Protection Design Study • Work Package A – Part Two – Shoreline Morphology and Cable Burial Assessment at Sæby Beach Landfall • Work Package B – Revised threat and risk assessment • Work Package C – Assessment of cable installation methods • Option - Work Package D – Client´s engineer, cable tender phase • Option – Work Package E – Client´s engineer, cable installation phase For further details regarding the purchase, reference is made to the tender documents. The tendered contract has a duration of 9 years until 1. December 2034. The contract is task-based, and it will be possible to extend the duration of the contract until the task has been completed satisfactorily for the Client. The value of the contract is expected to amount to 500,000 EURO.Main features of the procedureThe tenders submitted must be valid for a period of six (6) months from the specified time limit for the submission of tenders. If the tenderer during the negotiation phase, prepares and submits revised tenders, such tenders must also be valid for the period of six (6) months from the specified time limit for these revised tenders.

      Contact name
      Procurement - S
      Contact phone
      +45 70 10 22 44
      Contact email
      procurement@energinet.dk
      Address
      Tonne Kjærsvej 65, 7000 Fredericia

    Custom Assessment Criteria

    Start a free trial to ask your own questions about the tender and get AI-generated answers.

    Award Criteria

    • Description

      Prices must be stated in the attached Price List (doc.no. 25/11658-4) and the defined price elements must be completed herein. Prices must be stated exclusive of VAT but inclusive of all other expenses associated with the purchase. Prices must be stated in EUR

      Evaluation Method

      When evaluating 'Price', the Contracting Authority will evaluate the total cost (for evaluation purpose), cf. the Price List item 1000.

    • Description

      The tenderer should include the following documentation: 1. A methodology/method statement demonstrating how the Tenderer intends to perform the services comprised by Scope of Services, including procedures, methods and tools (i.e. IT software) for assuring the technical quality of all deliverables to the Contracting Authority under the Consultancy Agreement (approximately 10 pages as a guideline). 2. A project timeline in accordance with Energinet’s and Svenska kraftnäts plan including • Contract milestones and key dates template filled out by tenderer and • Detailed time schedule in which the use of a Gantt chart or similar is encouraged.

      Evaluation Method

      The evaluation of the sub criterion “Methodology and time schedule” will be based on: 1. Tenderer’s understanding of the project as such, demonstrated by the suitability of the proposed procedures, methods and tools for performing the services comprised by the Scope of Services. 2. To which extent the time schedule is robust and at the same time ensures a short and efficient process. Note that Energinet and Svenska kraftnät milestones (cf. Scope of Services section 4) must be met and that earlier delivery will be rated positively. 3. The extent to which the tenderer complies with Scope of Services, including the scope and content of any reservations in relation thereto. Hence, any reservation may lead to a reduction in the score depending on its content, clarity and consequence. An overall evaluation will be made of the ‘Methodology and time schedule’. For all other sub-criteria than “Price” it is a minimum requirement that the tenderers reach a minimum score of 4.

    • Description

      The Tenderer should prepare the following documentation: 1. CVs 2. Organization description. The tenderer should enclose CVs of the Key Personnel who will be allocated to the assignment, including (as a minimum) 1. Project Manager 2. Engineering specialists covering (as a minimum) the following fields of expertise: • Subsea cable threat analysis. • Risk analysis, risk assessment, and risk management. • Geoscience, seabed geology, morphology, and geotechnical conditions. • Subsea cable installation tools, trenchers, and protection methodologies. • Utility crossing design, rock berm stability assessment. The Contracting Authority accepts that the same specialist may cover more than one of the listed fields of expertise. Max. number of pages per CV is limited to three (3) pages; if the CV contains more than three (3) pages only the first three (3) pages will be evaluated. The tenderer should enclose a description of the project specific organizational structure, including organization chart (2-3 pages as a guideline).

      Evaluation Method

      The evaluation of the sub criterion “CVs and Organization” will be based on whether the experience and professional qualifications of the individual Key Personnel is recent and relevant and how they complement each other. Further, the evaluation will be based on whether the proposed organizational structure is found to be operational and efficient taking into consideration the scope and complexity of the assignment. An overall evaluation will be made of the “CV and Organization”. For all other sub-criteria than “Price” it is a minimum requirement that the tenderers reach a minimum score of 4.

    • Description

      The tenderer must as part of the sub-criterion “Contract Terms” include the following (if applicable): • A list of proposed deviations to the attached contractual terms, cf. legal documents (incl. appendices): o General Conditions based on ABR18 (25/11658-3) o Consultancy Contract (25/11658-10) which shall be stated in the “Clarification List” under the sheet “Legal”. The proposed deviations should be explicit and with explanation as to why they are made.

      Evaluation Method

      The tendered assignment must be performed on the basis of the attached contract terms. With the exception of the following sections in: • The legal conditions stated in the Consultancy Contract (25/11658-10): o Sub-clause 2.1 (Documents forming the Agreement) o Sub-clause 5.2.a-h) • The legal conditions stated in the General Conditions based on ABR18 (25/11658-3): o Sub-Clause 3(1) (Governing Law) o Sub-clause 35(1) (Payment, final date for payment) o Clauses 59-63 – chapter J (Disputes and Applicable Law) • Appendix 1 D: Svenska kraftnät – Template – Protective Security Agreement (25/11658-23) which is not part of the evaluation of “Contract terms”. These terms are mandatory. It is possible for the tenderer to make explicit and well-explained deviations. These will be included in the evaluation of the sub-criterion "Contract terms" and it is noted that any deviations may lead to a reduction in the score depending on the content, clarity and consequence. In this regard it is explicitly noted that deviations which intend to limit liability and shift the financial risk in favor of the tenderer will be of particular importance in the evaluation. No deviations, and thereby absolute fulfillment of the contract terms, will result in the maximum score of 10. An overall evaluation will be made of this sub-criterion. For all other sub-criteria than ‘Price’ it is a minimum requirement that the tenderers reach a minimum score of 4.

    Qualification requirements

    • Description

      Egenkapital fra siste årsrapport må, på tidspunktet for prekvalifisering, være minst 167.000 EURO.

      Documentation Requirement

      Søkeren må bekrefte den økonomiske evnen i ESPD del IV.B med informasjon fra siste årsrapport angående egenkapital (total egenkapital inkl. aksjekapital, reserver, revaluering, tilbakeholdt overskudd etc.). Hvis søkeren baserer seg på kapasiteten til andre enheter eller søkeren er en gruppe av økonomiske aktører, må informasjonen for ESPD del IV.B også gis i et separat ESPD fra hver av disse enhetene. Det er søkerens eget ansvar å sikre at minimumskravene er oppfylt basert på konsolidering når søkeren baserer seg på kapasiteten til andre enheter eller når søkeren er en gruppe av økonomiske aktører.

    • Description

      Egenkapitalandelen fra siste årsrapport må, på tidspunktet for prekvalifisering, være minst 20 prosent. Hvis egenkapitalandelen er mellom 15 prosent og 20 prosent, kan søkeren kvalifisere hvis egenkapitalen overstiger 167.000 EURO.

      Documentation Requirement

      Søkeren må bekrefte den økonomiske evnen i ESPD del IV.B med informasjon fra siste årsrapport angående egenkapitalandel (egenkapital/totale eiendeler). Dette må oppgis med to desimaler. Hvis søkeren baserer seg på kapasiteten til andre enheter eller søkeren er en gruppe av økonomiske aktører, må informasjonen for ESPD del IV.B også gis i et separat ESPD fra hver av disse enhetene. Det er søkerens eget ansvar å sikre at minimumskravene er oppfylt basert på konsolidering når søkeren baserer seg på kapasiteten til andre enheter eller når søkeren er en gruppe av økonomiske aktører.

    Previous Contract Winners

    Start a free trial to see who has won similar tenders for this buyer.

    See the full notice

    Contracting authority
    Energinet Eltransmission A/S
    Title
    Cable Burial and Protection to Konti-Skan Connect
    Type
    ResultPrequalification
    Main code
    71332000Geotechnical engineering services
    Supplemental codes

    No supplemental codes from buyer…

    Estimated value
    €500,000.00
    Duration
    9 years

    Active similar competitions

    • EnBW Energie Baden-Württemberg AG

      Rock Dumping Services

      1. Introduction The Scope of Work (SoW) defines the requirements, methodologies, and deliverables for the provision of Rock Dumping Services, including the design, supply, installation, and verification of rock berms for the protection and stabilization of subsea cables, CPS, Foundations, and related offshore infrastructure. The services are to be executed at the designated offshore wind farm locations in the German North Sea sector, Baltic Sea Sector or any other european offshore wind farm location. 2. Objectives Protection of Subsea Assets: To protect subsea cables, cable protection systems (CPS), and foundations from environmental and operational risks, such as scouring, freespan, and mechanical damage. Stabilization: To ensure long-term stability and integrity of subsea infrastructure by installing engineered rock berms. Compliance: To execute all works in accordance with applicable international standards, project specifications, and client requirements. 3. Scope of Work 3.1 General Description The Contractor shall provide a complete service package, including but not limited to: Project management and engineering Design of rock berms and stabilization measures Procurement and supply of rock material Mobilization and demobilization of specialized vessels and equipment Execution of rock installation works Pre- and post-installation surveys Quality assurance and as-built documentation. 3.2 Project Engineering & Management Project Planning: Develop detailed project schedules, installation plans, and risk assessments. Design Services: Prepare or review CPS berm designs, including cross-sections, material specifications, and installation tolerances. The Contractor may advise on optimal design solutions from an operational perspective. Quality Management: Implement a project-specific Quality Management System (QMS) in line with ISO 9001:2015, ensuring all works meet client and regulatory standards. HSE Management: Develop and enforce a Health, Safety, and Environmental (HSE) plan, including job hazard analysis, toolbox talks, and stop-work authority for all personnel. 3.3 Design Requirements Example (will be defined case by case by specific project): Berm Geometry: Typical berm dimensions may include heights of ~1.1 m, widths of ~0.3 m, and slopes of 1:3, subject to project-specific requirements. Material Specification: Use freshly crushed rock, grading CP 45/180 or as specified, with a specific density of ~2.65 t/m³ and bulk density of ~1.56 t/m³. All rock must comply with EN 13383-1,2 standards. Tolerances: Vertical tolerance: -0.00/+0.50 m; Horizontal tolerance: -0.00/+2.00 m either side. Tolerances are to be verified by survey. Losses and Settlement: Account for installation losses (e.g., soil penetration, settlement, wash-away, compaction) in the design and quantity calculations. Execution Accuracy: Capable of precise berm installation according to design profile; Vertical Installation Tolerance -0,00/+0,50m 3.4 Mobilization & Demobilization Mobilization: Prepare and mobilize the designated rock installation vessel(s) at the port of origin. Calibrate and test all positioning, survey, and installation equipment prior to departure. Demobilization: Upon completion, demobilize all equipment and personnel, ensuring the site is left in a safe and compliant condition. 3.5 Rock Installation Operations 3.5.1 Equipment Vessels: Use dynamically positioned fall pipe vessels (DPFPV) or equivalent. Fall Pipe Systems: Deploy central and/or inclined fall pipe systems, equipped with ROVs for precise placement and monitoring. Inclined systems are used for close proximity to structures. Survey Systems: Utilize DGNSS, USBL, multibeam echosounders (MBE), and online 3D visualization packages for real-time monitoring and documentation. Vessel Requirement: Minimum DP2 fall pipe vessel 3.5.2 Sequence of Work Procurement of Rock Material: Source and stockpile rock at the designated quarry, ensuring compliance with design specifications and timely supply. Loading Operations: Load rock onto the vessel using conveyor belts or harbor cranes, with quantities verified by draft survey. Transit to Site: Sail to the offshore site, maintaining communication with client representatives. Pre-Installation Survey: Conduct detailed bathymetric and positioning surveys to establish the as-found condition of the seabed and infrastructure. Rock Placement: Execute rock dumping using DPFPV in auto-track mode, adjusting vessel speed and feeder output to achieve the required berm profile. Use ROVs and real-time monitoring tools to ensure accuracy. Intermediate Surveys: Perform check surveys during installation to monitor progress and adjust methodology as needed. Post-Installation Survey: Conduct final surveys to verify that the installed berm meets design specifications. Demobilization: Recover all equipment and return to port. 3.5.3 Special Operations Close Proximity Works: For rock placement near structures, use inclined fall pipe or tremie pipe systems, with standoff distances and positioning monitored by echo sounders and sonar. Remedial Works: If required, perform additional passes or remedial installations based on survey results. 3.6 Survey and Documentation Survey Deliverables: Provide as-built charts (DWG, PDF), DTM ASCII files, and comprehensive as-built reports. All data must be corrected for tide and quality-checked before submission. Acceptance: Survey data and as-built documentation are to be reviewed and accepted by the client’s offshore representative before demobilization. The exact requirements will be specified by the specific case and project. ___ All companies affiliated with EnBW within the meaning of Sections 15 et seq. of the German Stock Corporation Act (AktG) shall be entitled to place orders.

      Qualification systemNov 18, 2025
      Dec 16, 2028(100+ days)
    • Energinet Eltransmission A/S

      Diverse konstruksjonsmateriell

      Re-tendering - Framework agreement: Purchase of fittings for glass insulator strings 26/17723

      Energinet Eltransmission A/S needs to purchase complete glass insulator strings through a framework agreement over 4 years, with two options for extension of 2 years each, for a total potential duration of 8 years. The maximum total value of the agreement is 30,442,953 EUR. The procurement is divided into two lots: Lot 1 for complete glass insulator strings for powerlines, with an expected consumption of 10,000,000 EUR and a maximum value of 24,000,000 EUR; and Lot 2 for complete glass insulator strings for substations, with an expected consumption of 2,684,563.75 EUR and a maximum value of 6,442,953.00 EUR. Tenders can be submitted for one or both lots. The award criteria are Quality (41.6667%), Delivery time (16.6667% + 16.6667% = 33.3334%), and Price (25%). Qualification requirements include an equity of at least 2,500,000 EUR and an equity ratio of at least 20% (or 15-20% if equity exceeds 7,500,000 EUR) for Lot 1. Additionally, applicants must provide three to five comparable and relevant references from the past five years, with at least one reference demonstrating the supply of glass insulators for a transmission network with a voltage level of at least 132 kV.

      Framework agreement with qualificationOct 2, 2026
      Nov 2, 2026(4 days)
      €30,442,953
    • Energistyrelsen

      Elektrisk utstyr og belysning

      North Sea I, South, Offshore Wind Farm

      Danish Energy Agency har udbudt en koncessionsaftale for etablering og drift af havvindmølleparken "North Sea I, South" ud for Vestjylland. Projektet omfatter opførelse og drift af en havvindmøllepark med en minimumskapacitet på 1 GW, med en kontraktvarighed på 40 år og en maksimal totalværdi på 6,6 milliarder DKK ekskl. moms (2025-priser) i form af statsstøtte over 20 år. Koncessionshaveren bærer den kommercielle risiko, men vil modtage økonomisk støtte via en tovejs Contract for Difference (CfD) ordning. Tildelingskriteriet er den laveste budpris (100%). Kvalifikationskrav inkluderer mindst én reference fra et storskala offshore energiproduktionsprojekt inden for de seneste ti år, med anlægsomkostninger på minimum 500.000.000 DKK, fastgjort til havbunden på mindst 10 meters dybde, og en kontraktvarighed på minimum 25 år. Referencen skal desuden vise erfaring inden for mindst tre af følgende områder: projektledelse, engineering, indkøb, udførelse, drift eller kvalitetskontrol.

      CompetitionNov 20, 2025
      Oct 23, 2028(100+ days)
      DKK 6,600,000,000
    • TenneT TSO B.V.

      Hav- og kystfiske med utleie av båter

      Remedial Burial Services NL

      This qualification system shall cover the provision of remedial burial services in the Dutch North Sea. TenneT reserves the right to extend this scope of work to cover its assets in Belgian, British, German Norwegian and Danish waters in the future for cables which fall in the major responsibility of TenneT. For each requirement of remedial burial services of offshore or nearshore HV power cables the client will issue an invitation to tender/request for quotation (ITT) based on the contractual conditions which are published with this Qualification System. The technical requirements can vary in its nature, depending on the region, permit requirements, soil conditions, etc.

      Qualification systemJan 23, 2024
      Feb 20, 2027(114 days)
    • TenneT Offshore GmbH

      Hav- og kystfiske med utleie av båter

      Qualification System Remedial Burial Services Germany

      This qualification system shall cover the provision of remedial burial services in the German North Sea and Wadden Sea. TenneT reserves the right to extend this scope of work to cover its assets in Norwegian and Danish waters in the future for cables which fall in the major responsibility of TenneT. For each requirement of remedial burial services of offshore or nearshore HV power cables the client will issue an invitation to tender/request for quotation (ITT) based on the contractual conditions which are published with this Qualification System. The technical requirements can vary in its nature, depending on the region, permit requirements, soil conditions, etc.

      Qualification systemJun 19, 2024
      Jul 17, 2027(100+ days)